Showing comments and forms 31 to 52 of 52

Comment

Draft Cambridge Biomedical Campus Supplementary Planning Document

Representation ID: 200666

Received: 24/01/2025

Respondent: Great Shelford Parish Council

Representation Summary:

The relevant purposes of the Green Belt should also be repeated in this SPD, namely:
“ to prevent neighbouring towns merging into one another;
to assist in safeguarding the countryside from encroachment;
to preserve the setting and special character of historic towns;”.

Applicants should be required to have express regard to these matters. We are also concerned that CBC will never be satisfied with land allocated to it for expansion and will continue to ask for more.

Full text:

Hi,

Please find attached response from Great Shelford Parish Council to the consultation regarding the Draft Cambridge Biomedical Campus Supplementary Planning Document. Can you please confirm receipt?


Kind regards
Nicola

Nicola Webster CertHE PSLCC
Clerk to Great Shelford Parish Council

Comment

Draft Cambridge Biomedical Campus Supplementary Planning Document

Representation ID: 200667

Received: 24/01/2025

Respondent: Great Shelford Parish Council

Representation Summary:

We wonder whether the draft SPD could drawing developers’ attention to both the Hobson’s Conduit Trust website (and especially its annual bioblitz information) and to the relevant parts of the 2020 Greater Cambridge Chalk Streams Project Report.

The draft document does not mention the Red Cross Lane Drain City Wildlife Site.

CBC’s recently released Travel and Transport Plan 2024 to 2029 has identified that there is “no clear east-west active travel or public transport links at [CBC]”. This, plus poor wayfinding signage, significantly contributes to CBC’s lack of legibility. We would suggest that this is also referred to in the draft SPD.

Full text:

Hi,

Please find attached response from Great Shelford Parish Council to the consultation regarding the Draft Cambridge Biomedical Campus Supplementary Planning Document. Can you please confirm receipt?


Kind regards
Nicola

Nicola Webster CertHE PSLCC
Clerk to Great Shelford Parish Council

Comment

Draft Cambridge Biomedical Campus Supplementary Planning Document

Representation ID: 200669

Received: 24/01/2025

Respondent: Great Shelford Parish Council

Representation Summary:

- The map in paragraph 3.17 is useful, but should also show
(i) the site reserved for the new acute hospital,
(ii) the sites of Cambridge Surgical Hospital, the East of England Ambulance Service, the Addenbrooke’s Centre for Clinical Investigation, GSK’s Experimental Medicine and Clinical Pharmacology Unit and IdeaSpace,
(iii) use 2000 and 3000 Discovery Drive for “Discovery Drive development”. The “Plot 9” description is not particularly meaningful. Labels such as “due 2025”, “due 2028” and “in development” should be avoided and, in any event, are already not accurate. In addition, the occupiers listed in paragraph 3.19 should be the same as those shown on the map and names should be used consistently throughout the draft SPD (e.g. Victor Dadaleh is not).

In paragraph 3.19, some places shown on the map (e.g. the NHS Blood and Transplant Cambridge Donor Centre) are not listed. Internet research suggests that Iota Pharmaceuticals is at the St John’s Innovation Centre.

Full text:

Hi,

Please find attached response from Great Shelford Parish Council to the consultation regarding the Draft Cambridge Biomedical Campus Supplementary Planning Document. Can you please confirm receipt?


Kind regards
Nicola

Nicola Webster CertHE PSLCC
Clerk to Great Shelford Parish Council

Comment

Draft Cambridge Biomedical Campus Supplementary Planning Document

Representation ID: 200670

Received: 24/01/2025

Respondent: Great Shelford Parish Council

Representation Summary:

-Are all the “outposts with catering facilities” open to the public (paragraph 3.20)? There will be more retail in the Cambridge South station.

Full text:

Hi,

Please find attached response from Great Shelford Parish Council to the consultation regarding the Draft Cambridge Biomedical Campus Supplementary Planning Document. Can you please confirm receipt?


Kind regards
Nicola

Nicola Webster CertHE PSLCC
Clerk to Great Shelford Parish Council

Comment

Draft Cambridge Biomedical Campus Supplementary Planning Document

Representation ID: 200671

Received: 24/01/2025

Respondent: Great Shelford Parish Council

Representation Summary:

- Which employees is the Frank Lee Centre open to (paragraph 3.21)?

Full text:

Hi,

Please find attached response from Great Shelford Parish Council to the consultation regarding the Draft Cambridge Biomedical Campus Supplementary Planning Document. Can you please confirm receipt?


Kind regards
Nicola

Nicola Webster CertHE PSLCC
Clerk to Great Shelford Parish Council

Comment

Draft Cambridge Biomedical Campus Supplementary Planning Document

Representation ID: 200672

Received: 24/01/2025

Respondent: Great Shelford Parish Council

Representation Summary:

- 3.24 does not mention White Hill and the Gog Magog Hills, and the extent to which urban Cambridge wraps around the East of CBC is limited.

Full text:

Hi,

Please find attached response from Great Shelford Parish Council to the consultation regarding the Draft Cambridge Biomedical Campus Supplementary Planning Document. Can you please confirm receipt?


Kind regards
Nicola

Nicola Webster CertHE PSLCC
Clerk to Great Shelford Parish Council

Comment

Draft Cambridge Biomedical Campus Supplementary Planning Document

Representation ID: 200673

Received: 24/01/2025

Respondent: Great Shelford Parish Council

Representation Summary:

- 3.28 'northwest' and 'northeast' is confusing. The incinerator chimney is also distinctive seen from the A1307.

Full text:

Hi,

Please find attached response from Great Shelford Parish Council to the consultation regarding the Draft Cambridge Biomedical Campus Supplementary Planning Document. Can you please confirm receipt?


Kind regards
Nicola

Nicola Webster CertHE PSLCC
Clerk to Great Shelford Parish Council

Comment

Draft Cambridge Biomedical Campus Supplementary Planning Document

Representation ID: 200674

Received: 24/01/2025

Respondent: Great Shelford Parish Council

Representation Summary:

- 3.29 the railway is West Anglia Main Line not London to Kings Lynn railway. The description of where the existing MSCPs is appears inaccurate.

Full text:

Hi,

Please find attached response from Great Shelford Parish Council to the consultation regarding the Draft Cambridge Biomedical Campus Supplementary Planning Document. Can you please confirm receipt?


Kind regards
Nicola

Nicola Webster CertHE PSLCC
Clerk to Great Shelford Parish Council

Comment

Draft Cambridge Biomedical Campus Supplementary Planning Document

Representation ID: 200675

Received: 24/01/2025

Respondent: Great Shelford Parish Council

Representation Summary:

- 3.30 could include updates figures from the CBC Travel and Transport Plan.

Full text:

Hi,

Please find attached response from Great Shelford Parish Council to the consultation regarding the Draft Cambridge Biomedical Campus Supplementary Planning Document. Can you please confirm receipt?


Kind regards
Nicola

Nicola Webster CertHE PSLCC
Clerk to Great Shelford Parish Council

Comment

Draft Cambridge Biomedical Campus Supplementary Planning Document

Representation ID: 200676

Received: 24/01/2025

Respondent: Great Shelford Parish Council

Representation Summary:

-3.31 the relationship between the guided buses and the bus station is unclear. The walk between Cambridge South station and the eastern parts of the campus will be significant.

Full text:

Hi,

Please find attached response from Great Shelford Parish Council to the consultation regarding the Draft Cambridge Biomedical Campus Supplementary Planning Document. Can you please confirm receipt?


Kind regards
Nicola

Nicola Webster CertHE PSLCC
Clerk to Great Shelford Parish Council

Comment

Draft Cambridge Biomedical Campus Supplementary Planning Document

Representation ID: 200692

Received: 24/01/2025

Respondent: Cllr Immy Blackburn-Horgan

Representation Summary:

3.25 Forvie is noted as being a site with many trees supporting the biodiversity of the Site. Yet these very trees are being reviewed by redevelopment of the Forvie site underway currently and planned for in the short 2025 and long term 2035, in addition works being undertaken to nearby housing note works they will undertake on Forvie tree roots.

Full text:

Draft SPD Consultation CBC Site- Comments Cllr Immy B-H

Comment

Draft Cambridge Biomedical Campus Supplementary Planning Document

Representation ID: 200693

Received: 24/01/2025

Respondent: Cllr Immy Blackburn-Horgan

Representation Summary:

3.26 Due to most users of the Campus not having direct access to high quality public realm or green open space for play, recuperation, sports or any other outdoor activities to support health and wellbeing there is a large overspill of thousands 24/7 into small residential areas abutting the Site resulting in unintended negative impacts for residents.

Full text:

Draft SPD Consultation CBC Site- Comments Cllr Immy B-H

Comment

Draft Cambridge Biomedical Campus Supplementary Planning Document

Representation ID: 200694

Received: 24/01/2025

Respondent: Cllr Immy Blackburn-Horgan

Representation Summary:

3.32 There is significant parking stress which continues to grow from the CBC Site on the streets in QE Ward, this needs to reduce whilst wayfinding/lighting to/from the P&R to and around the Site requires significant improvement. This has unintended negative impacts on the health and well-being of the communities namely QEW the Site sits in.

Full text:

Draft SPD Consultation CBC Site- Comments Cllr Immy B-H

Comment

Draft Cambridge Biomedical Campus Supplementary Planning Document

Representation ID: 200708

Received: 24/01/2025

Respondent: Hobson's Conduit Trust

Representation Summary:

Paragraph 3.24: We are disappointed to find no reference to Nine Wells, White Hill and the Gog Magogs. The relationship of the built environment of Addenbrookes and the CBC with all of these surrounding landscape features such as the Magog Down is very important. The scale and impact of the whole of the mass of hospital and CBC buildings, their height and increasingly dense and industrial texture is very significant and of high sensitivity, and needs to be given appropriate weighting in the SPD which is currently completely missing.

Full text:

Good afternoon,

Please find attached a letter submission from Hobson's Conduit Trust in response to the consultation on the CBC SPD which closes later today.

Many thanks

Kind regards

John Latham

Chairman
Hobson's Conduit Trust

Comment

Draft Cambridge Biomedical Campus Supplementary Planning Document

Representation ID: 200709

Received: 24/01/2025

Respondent: Hobson's Conduit Trust

Representation Summary:

Paragraph 3.26 highlights the importance of ensuring that Nine Wells is properly and comprehensively safeguarded, and remains readily accessible and its footprint is expanded sufficiently to absorb greater numbers of people working at the CBC. It also emphasises the important role that Hobson’s Park can play, and the potential value of walking routes in the Park including beside Hobson’s Brook. The Trustees are currently aiming to complete a continuous walking route from the City Centre to Nine Wells, part of which would provide an excellent and attractive circular walking route from CBC.

Full text:

Good afternoon,

Please find attached a letter submission from Hobson's Conduit Trust in response to the consultation on the CBC SPD which closes later today.

Many thanks

Kind regards

John Latham

Chairman
Hobson's Conduit Trust

Comment

Draft Cambridge Biomedical Campus Supplementary Planning Document

Representation ID: 200710

Received: 24/01/2025

Respondent: Hobson's Conduit Trust

Representation Summary:

The incinerator chimney’s height has made it a recognised landmark for 60 years, but this should not be used as an excuse for a generalised uplift in building height beyond that of the main hospital building. We therefore believe that the SPD should be much more explicit about limitations on maximum building heights, and much more specifically than what is set out in Policy 60 quoted on page 52. This is particularly important in relation to our point 2 above, especially in relation to views from Magog Down over the CBC and Addenbrook’s site towards the city, and to the northern skyline as seen from Nine Wells. This is also relevant to Clay Farm and other Trumpington and Shelford residents, and visitors to Hobson’s Park.

Full text:

Good afternoon,

Please find attached a letter submission from Hobson's Conduit Trust in response to the consultation on the CBC SPD which closes later today.

Many thanks

Kind regards

John Latham

Chairman
Hobson's Conduit Trust

Comment

Draft Cambridge Biomedical Campus Supplementary Planning Document

Representation ID: 200726

Received: 23/01/2025

Respondent: Prologis

Representation Summary:

3.18 Is "Expansion" an occupier?

Full text:

3.7 isnt it wider than this to include clinical expansion as well eg phase 2 land share for NHS.
3.18 Is "Expansion" an occupier?
3.20 cafe operator is Stir.
3.23 reads as though AZ and RPH are on Phase 2. they are Phase 1.
3.27 Piecemeal is unfair - it is "Phased."

Comment

Draft Cambridge Biomedical Campus Supplementary Planning Document

Representation ID: 200727

Received: 23/01/2025

Respondent: Prologis

Representation Summary:

3.20 cafe operator is Stir.

Full text:

3.7 isnt it wider than this to include clinical expansion as well eg phase 2 land share for NHS.
3.18 Is "Expansion" an occupier?
3.20 cafe operator is Stir.
3.23 reads as though AZ and RPH are on Phase 2. they are Phase 1.
3.27 Piecemeal is unfair - it is "Phased."

Comment

Draft Cambridge Biomedical Campus Supplementary Planning Document

Representation ID: 200728

Received: 23/01/2025

Respondent: Prologis

Representation Summary:

3.23 reads as though AZ and RPH are on Phase 2. they are Phase 1.

Full text:

3.7 isnt it wider than this to include clinical expansion as well eg phase 2 land share for NHS.
3.18 Is "Expansion" an occupier?
3.20 cafe operator is Stir.
3.23 reads as though AZ and RPH are on Phase 2. they are Phase 1.
3.27 Piecemeal is unfair - it is "Phased."

Comment

Draft Cambridge Biomedical Campus Supplementary Planning Document

Representation ID: 200729

Received: 23/01/2025

Respondent: Prologis

Representation Summary:

3.27 Piecemeal is unfair - it is "Phased."

Full text:

3.7 isnt it wider than this to include clinical expansion as well eg phase 2 land share for NHS.
3.18 Is "Expansion" an occupier?
3.20 cafe operator is Stir.
3.23 reads as though AZ and RPH are on Phase 2. they are Phase 1.
3.27 Piecemeal is unfair - it is "Phased."

Comment

Draft Cambridge Biomedical Campus Supplementary Planning Document

Representation ID: 200730

Received: 24/01/2025

Respondent: University of Cambridge

Representation Summary:

We believe that the text in paragraph 3.23 relates to development on the Phase 1 land rather than Phase 2.

Full text:

Dear Lizzie,

Please find attached a response from the University of Cambridge to the CBC SPD consultation.

Best wishes,

Paul
Paul Milliner MRTPI I Head of Planning

Attachments:

Comment

Draft Cambridge Biomedical Campus Supplementary Planning Document

Representation ID: 200731

Received: 24/01/2025

Respondent: University of Cambridge

Representation Summary:

Paragraph 3.27: The reference to ‘the…piecemeal approach to development’ is slightly unfair to the campus developers. Land allocations have taken place in stages and planning requirements have changed over time since the 1960s; it is therefore inevitable that design responses have evolved over time.

Proposed change to read: "There is more consistency in use of materials and more active facades at ground
level in these more recent buildings but overall, due to the phased delivery of development to meet changing needs and to deliver a greater mix of uses over a period of six decades, with evolution in approaches to design, the Campus architecture lacks coherency".

Full text:

Dear Lizzie,

Please find attached a response from the University of Cambridge to the CBC SPD consultation.

Best wishes,

Paul
Paul Milliner MRTPI I Head of Planning

Attachments: