Question 31. How should the Local Plan help to meet our needs for the amount and types of new homes?
Housing need is an appropriate concern, economic growth should be given less priority. Existing housing needs should be planned for, but economic growth will simply increase housing need. This needs re-balancing
No uploaded files for public display
Speed of building should not be at the expense of good design, ample space and care of construction so that people want to live in the homes and care for them.
No uploaded files for public display
No specific comments. Location is key for this plan – new housing should always be located close to existing and proposed employment areas and vice versa.
No uploaded files for public display
The Local Plan should, in addition to defining the total housing provision and settlement hierarchy, also suggest the proportion of development that different settlement types should accommodate. In recent years high levels of development have been permitted in a small number of villages (e.g. Cottenham, Melbourn) and it is felt that a greater level should now be directed to some of the smaller villages (e.g. Ickleton), some of which have seen little development for many years.
No uploaded files for public display
By providing a range of house types and tenures at least at the minimum number set out in Standard Methodology.
No uploaded files for public display
The local plan should empower local communities to assess their own housing needs. In our Parish we have used the process of developing a Neighbourhood Plan to provide evidence to bring forward a rural exception site.
No uploaded files for public display
Location is key for the Plan – new housing should always be located close to existing and proposed employment areas and transport links and vice versa.
No uploaded files for public display
Location is key for the Plan – new housing should always be located close to existing and proposed employment areas and transport links and vice versa.
No uploaded files for public display
Homes that can support the younger generation trying to find property’s for a price they can afford.
No uploaded files for public display
The Plan needs to allocate sufficient housing land across Cambridge City and South Cambridgeshire to help settlements at all levels of the hierarchy to become more sustainable while safeguarding the Plan against inevitable delays and uncertainty in the delivery of large projects such as Cambridge East. Allocation on the edge of villages with some service provision, adjacent to existing employment opportunities, such as the land off Comberton Road, Toft should be considered favourably.
No uploaded files for public display
The local Plan needs to allocate sufficient housing land across Cambridge City and South Cambridgeshire to help settlements at all levels of the hierarchy to become more sustainable while safeguarding the Plan against inevitable delays and uncertainty in the delivery of large projects such as Cambridge East. Allocations on the edge of villages with some service provision, adjacent to existing employment opportunities, such as the land off Ashwell Road, Steeple Morden should be considered favourably.
No uploaded files for public display
Location is key for the Plan – new housing should always be located close to existing and proposed employment areas and transport links and vice versa.
No uploaded files for public display
Location is key for the Plan – new housing should always be located close to existing and proposed employment areas and transport links and vice versa.
No uploaded files for public display
Location is key for the Plan – new housing should always be located close to existing and proposed employment areas and transport links and vice versa.
No uploaded files for public display
No specific comments. Location is key for this plan – new housing should always be located close to existing and proposed employment areas and infrastructure and vice versa. To create a modal shift in transport and the delivery of a significant level of housing, strategic Green Belt releases need to be considered, particularly those located adjacent to public transport corridors and hubs. This would be in line with the Edge of Cambridge Green Belt Option and Public Transport corridors as presented under Q42.
No uploaded files for public display
No specific comments. Location is key for this plan – new housing should always be located close to existing and proposed employment areas and infrastructure and vice versa. To create a modal shift in transport and the delivery of a significant level of housing and employment, strategic allocations need to be considered, particularly those located adjacent to transport corridors.
No uploaded files for public display
The emerging GCLP will need to be consistent with national guidance on meeting housing needs. Paragraph 59 of the NPPF confirms the Government’s objective to significantly boost the supply of housing, and to achieve this by ensuring that a sufficient amount and variety of land for housing is identified. Paragraph 60 expects the standard method to be used to determine the minimum number of houses needed. Paragraph 61 expects the size, type and tenure of housing needs of the community to be assessed and reflected in planning policies, including for example those with an affordable housing need, students, renters and self-builders. Section Id.2a of the Planning Practice Guidance explains how housing and economic needs assessments should be undertaken, including how to calculate local housing needs using the standard method. Paragraph 010 of Id.2a makes it clear that the standard method is the minimum starting point for determining local housing needs, and acknowledges that there may be circumstances where actual housing need is higher than the standard method indicates. As set out in Paragraph 010 the circumstances where increases to housing need that exceed past trends are as follows: there is a growth strategy in place to promote and facilitate additional growth; strategic infrastructure improvements are likely to lead to an increase in the number of homes needed locally; and, an authority has agreed to accommodate unmet housing needs from a neighbouring area. The first two circumstances are relevant to Greater Cambridge. Paragraph 024 of Id.2a explains how the need for affordable housing is calculated, and it is suggested that the overall housing target should be increased where it could help deliver the required number of affordable homes. There is an urgent need to improve the affordability of housing and to boost affordable housing delivery in Greater Cambridge. Therefore, the emerging GCLP should use the standard method to calculate the minimum local housing need, and then make appropriate adjustments taking into account the growth strategies and strategic infrastructure improvements identified for Greater Cambridge, and a further adjustment to ensure affordable housing needs are met.
No uploaded files for public display
The emerging GCLP will need to be consistent with national guidance on meeting housing needs. Paragraph 59 of the NPPF confirms the Government’s objective to significantly boost the supply of housing, and to achieve this by ensuring that a sufficient amount and variety of land for housing is identified. Paragraph 60 expects the standard method to be used to determine the minimum number of houses needed. Paragraph 61 expects the size, type and tenure of housing needs of the community to be assessed and reflected in planning policies, including for example those with an affordable housing need, students, renters and self-builders. Section Id.2a of the Planning Practice Guidance explains how housing and economic needs assessments should be undertaken, including how to calculate local housing needs using the standard method. Paragraph 010 of Id.2a makes it clear that the standard method is the minimum starting point for determining local housing needs, and acknowledges that there may be circumstances where actual housing need is higher than the standard method indicates. As set out in Paragraph 010 the circumstances where increases to housing need that exceed past trends are as follows: there is a growth strategy in place to promote and facilitate additional growth; strategic infrastructure improvements are likely to lead to an increase in the number of homes needed locally; and, an authority has agreed to accommodate unmet housing needs from a neighbouring area. The first two circumstances are relevant to Greater Cambridge. Paragraph 024 of Id.2a explains how the need for affordable housing is calculated, and it is suggested that the overall housing target should be increased where it could help deliver the required number of affordable homes. There is an urgent need to improve the affordability of housing and to boost affordable housing delivery in Greater Cambridge. Therefore, the emerging GCLP should use the standard method to calculate the minimum local housing need, and then make appropriate adjustments taking into account the growth strategies and strategic infrastructure improvements identified for Greater Cambridge, and a further adjustment to ensure affordable housing needs are met.
No uploaded files for public display
The emerging GCLP will need to be consistent with national guidance on meeting housing needs. Paragraph 59 of the NPPF confirms the Government’s objective to significantly boost the supply of housing, and to achieve this by ensuring that a sufficient amount and variety of land for housing is identified. Paragraph 60 expects the standard method to be used to determine the minimum number of houses needed. Paragraph 61 expects the size, type and tenure of housing needs of the community to be assessed and reflected in planning policies, including for example those with an affordable housing need, students, renters and self-builders. Section Id.2a of the Planning Practice Guidance explains how housing and economic needs assessments should be undertaken, including how to calculate local housing needs using the standard method. Paragraph 010 of Id.2a makes it clear that the standard method is the minimum starting point for determining local housing needs, and acknowledges that there may be circumstances where actual housing need is higher than the standard method indicates. As set out in Paragraph 010 the circumstances where increases to housing need that exceed past trends are as follows: there is a growth strategy in place to promote and facilitate additional growth; strategic infrastructure improvements are likely to lead to an increase in the number of homes needed locally; and, an authority has agreed to accommodate unmet housing needs from a neighbouring area. The first two circumstances are relevant to Greater Cambridge. Paragraph 024 of Id.2a explains how the need for affordable housing is calculated, and it is suggested that the overall housing target should be increased where it could help deliver the required number of affordable homes. There is an urgent need to improve the affordability of housing and to boost affordable housing delivery in Greater Cambridge. Therefore, the emerging GCLP should use the standard method to calculate the minimum local housing need, and then make appropriate adjustments taking into account the growth strategies and strategic infrastructure improvements identified for Greater Cambridge, and a further adjustment to ensure affordable housing needs are met.
No uploaded files for public display
The emerging GCLP will need to be consistent with national guidance on meeting housing needs. Paragraph 59 of the NPPF confirms the Government’s objective to significantly boost the supply of housing, and to achieve this by ensuring that a sufficient amount and variety of land for housing is identified. Paragraph 60 expects the standard method to be used to determine the minimum number of houses needed. Paragraph 61 expects the size, type and tenure of housing needs of the community to be assessed and reflected in planning policies, including for example those with an affordable housing need, students, renters and self-builders. Section Id.2a of the Planning Practice Guidance explains how housing and economic needs assessments should be undertaken, including how to calculate local housing needs using the standard method. Paragraph 010 of Id.2a makes it clear that the standard method is the minimum starting point for determining local housing needs, and acknowledges that there may be circumstances where actual housing need is higher than the standard method indicates. As set out in Paragraph 010 the circumstances where increases to housing need that exceed past trends are as follows: there is a growth strategy in place to promote and facilitate additional growth; strategic infrastructure improvements are likely to lead to an increase in the number of homes needed locally; and, an authority has agreed to accommodate unmet housing needs from a neighbouring area. The first two circumstances are relevant to Greater Cambridge. Paragraph 024 of Id.2a explains how the need for affordable housing is calculated, and it is suggested that the overall housing target should be increased where it could help deliver the required number of affordable homes. There is an urgent need to improve the affordability of housing and to boost affordable housing delivery in Greater Cambridge. Therefore, the emerging GCLP should use the standard method to calculate the minimum local housing need, and then make appropriate adjustments taking into account the growth strategies and strategic infrastructure improvements identified for Greater Cambridge, and a further adjustment to ensure affordable housing needs are met.
No uploaded files for public display
The emerging GCLP will need to be consistent with national guidance on meeting housing needs. Paragraph 59 of the NPPF confirms the Government’s objective to significantly boost the supply of housing, and to achieve this by ensuring that a sufficient amount and variety of land for housing is identified. Paragraph 60 expects the standard method to be used to determine the minimum number of houses needed. Paragraph 61 expects the size, type and tenure of housing needs of the community to be assessed and reflected in planning policies, including for example those with an affordable housing need, students, renters and self-builders. Section Id.2a of the Planning Practice Guidance explains how housing and economic needs assessments should be undertaken, including how to calculate local housing needs using the standard method. Paragraph 010 of Id.2a makes it clear that the standard method is the minimum starting point for determining local housing needs, and acknowledges that there may be circumstances where actual housing need is higher than the standard method indicates. As set out in Paragraph 010 the circumstances where increases to housing need that exceed past trends are as follows: there is a growth strategy in place to promote and facilitate additional growth; strategic infrastructure improvements are likely to lead to an increase in the number of homes needed locally; and, an authority has agreed to accommodate unmet housing needs from a neighbouring area. The first two circumstances are relevant to Greater Cambridge. Paragraph 024 of Id.2a explains how the need for affordable housing is calculated, and it is suggested that the overall housing target should be increased where it could help deliver the required number of affordable homes. There is an urgent need to improve the affordability of housing and to boost affordable housing delivery in Greater Cambridge. Therefore, the emerging GCLP should use the standard method to calculate the minimum local housing need, and then make appropriate adjustments taking into account the growth strategies and strategic infrastructure improvements identified for Greater Cambridge, and a further adjustment to ensure affordable housing needs are met.
No uploaded files for public display
The emerging GCLP will need to be consistent with national guidance on meeting housing needs. Paragraph 59 of the NPPF confirms the Government’s objective to significantly boost the supply of housing, and to achieve this by ensuring that a sufficient amount and variety of land for housing is identified. Paragraph 60 expects the standard method to be used to determine the minimum number of houses needed. Paragraph 61 expects the size, type and tenure of housing needs of the community to be assessed and reflected in planning policies, including for example those with an affordable housing need, students, renters and self-builders. Section Id.2a of the Planning Practice Guidance explains how housing and economic needs assessments should be undertaken, including how to calculate local housing needs using the standard method. Paragraph 010 of Id.2a makes it clear that the standard method is the minimum starting point for determining local housing needs, and acknowledges that there may be circumstances where actual housing need is higher than the standard method indicates. As set out in Paragraph 010 the circumstances where increases to housing need that exceed past trends are as follows: there is a growth strategy in place to promote and facilitate additional growth; strategic infrastructure improvements are likely to lead to an increase in the number of homes needed locally; and, an authority has agreed to accommodate unmet housing needs from a neighbouring area. The first two circumstances are relevant to Greater Cambridge. Paragraph 024 of Id.2a explains how the need for affordable housing is calculated, and it is suggested that the overall housing target should be increased where it could help deliver the required number of affordable homes. There is an urgent need to improve the affordability of housing and to boost affordable housing delivery in Greater Cambridge. Therefore, the emerging GCLP should use the standard method to calculate the minimum local housing need, and then make appropriate adjustments taking into account the growth strategies and strategic infrastructure improvements identified for Greater Cambridge, and a further adjustment to ensure affordable housing needs are met.
No uploaded files for public display
The College is aware of the affordability issue within Cambridge city and the sub region, given not only its student population, but also its teaching, research and support staff that face this issue on a daily basis. The College is also aware of the continued growth in the Greater Cambridge economy as well as the goal of doubling total economic input in the combined Cambridge and Peterborough devolution deal. As such, the College supports the development of new housing over and above existing adopted local plan targets, including affordable housing for a range of tenures and price points. Given the Government’s emphasis on the delivery of new homes through the Housing Delivery Test, the College also considers the Local Plan needs to carefully assess the deliverability of new housing proposals to meet adopted targets. In this regard, the College’s Duxford “Call for Sites” submission includes proposals for significant new housing (circa 800 new homes) as part of a truly mixed-use development on its own land. In this context, the College represents a single landowner which has ultimate control over the speed and quality of delivery of new housing, other development and infrastructure.
No uploaded files for public display
The Local Plan should, in addition to defining the total housing provision and settlement hierarchy, also suggest the proportion of development that different settlement types should accommodate. In recent years high levels of development have been permitted in a small number of villages (e.g. Cottenham, Melbourn) and it is felt that a greater level should now be directed to some of the smaller villages (e.g. Balsham), some of which have seen little development for many years.
No uploaded files for public display
The emerging GCLP will need to be consistent with national guidance on meeting housing needs. Paragraph 59 of the NPPF confirms the Government’s objective to significantly boost the supply of housing, and to achieve this by ensuring that a sufficient amount and variety of land for housing is identified. Paragraph 60 expects the standard method to be used to determine the minimum number of houses needed. Paragraph 61 expects the size, type and tenure of housing needs of the community to be assessed and reflected in planning policies, including for example those with an affordable housing need, students, renters and self-builders. Section Id.2a of the Planning Practice Guidance explains how housing and economic needs assessments should be undertaken, including how to calculate local housing needs using the standard method. Paragraph 010 of Id.2a makes it clear that the standard method is the minimum starting point for determining local housing needs, and acknowledges that there may be circumstances where actual housing need is higher than the standard method indicates. As set out in Paragraph 010 the circumstances where increases to housing need that exceed past trends are as follows: there is a growth strategy in place to promote and facilitate additional growth; strategic infrastructure improvements are likely to lead to an increase in the number of homes needed locally; and, an authority has agreed to accommodate unmet housing needs from a neighbouring area. The first two circumstances are relevant to Greater Cambridge. Paragraph 024 of Id.2a explains how the need for affordable housing is calculated, and it is suggested that the overall housing target should be increased where it could help deliver the required number of affordable homes. There is an urgent need to improve the affordability of housing and to boost affordable housing delivery in Greater Cambridge. Therefore, the emerging GCLP should use the standard method to calculate the minimum local housing need, and then make appropriate adjustments taking into account the growth strategies and strategic infrastructure improvements identified for Greater Cambridge, and a further adjustment to ensure affordable housing needs are met.
No uploaded files for public display
The Local Plan should, in addition to defining the total housing provision and settlement hierarchy, also suggest the proportion of development that different settlement types should accommodate. In recent years high levels of development have been permitted in a small number of villages (e.g. Cottenham, Melbourn) and it is felt that a greater level should now be directed to some of the smaller villages (e.g. Great Abington).
No uploaded files for public display
The emerging GCLP will need to be consistent with national guidance on meeting housing needs. Paragraph 59 of the NPPF confirms the Government’s objective to significantly boost the supply of housing, and to achieve this by ensuring that a sufficient amount and variety of land for housing is identified. Paragraph 60 expects the standard method to be used to determine the minimum number of houses needed. Paragraph 61 expects the size, type and tenure of housing needs of the community to be assessed and reflected in planning policies, including for example those with an affordable housing need, students, renters and self-builders. Section Id.2a of the Planning Practice Guidance explains how housing and economic needs assessments should be undertaken, including how to calculate local housing needs using the standard method. Paragraph 010 of Id.2a makes it clear that the standard method is the minimum starting point for determining local housing needs, and acknowledges that there may be circumstances where actual housing need is higher than the standard method indicates. As set out in Paragraph 010 the circumstances where increases to housing need that exceed past trends are as follows: there is a growth strategy in place to promote and facilitate additional growth; strategic infrastructure improvements are likely to lead to an increase in the number of homes needed locally; and, an authority has agreed to accommodate unmet housing needs from a neighbouring area. The first two circumstances are relevant to Greater Cambridge. Paragraph 024 of Id.2a explains how the need for affordable housing is calculated, and it is suggested that the overall housing target should be increased where it could help deliver the required number of affordable homes. There is an urgent need to improve the affordability of housing and to boost affordable housing delivery in Greater Cambridge. Therefore, the emerging GCLP should use the standard method to calculate the minimum local housing need, and then make appropriate adjustments taking into account the growth strategies and strategic infrastructure improvements identified for Greater Cambridge, and a further adjustment to ensure affordable housing needs are met.
No uploaded files for public display
The emerging GCLP will need to be consistent with national guidance on meeting housing needs. Paragraph 59 of the NPPF confirms the Government’s objective to significantly boost the supply of housing, and to achieve this by ensuring that a sufficient amount and variety of land for housing is identified. Paragraph 60 expects the standard method to be used to determine the minimum number of houses needed. Paragraph 61 expects the size, type and tenure of housing needs of the community to be assessed and reflected in planning policies, including for example those with an affordable housing need, students, renters and self-builders. Section Id.2a of the Planning Practice Guidance explains how housing and economic needs assessments should be undertaken, including how to calculate local housing needs using the standard method. Paragraph 010 of Id.2a makes it clear that the standard method is the minimum starting point for determining local housing needs, and acknowledges that there may be circumstances where actual housing need is higher than the standard method indicates. As set out in Paragraph 010 the circumstances where increases to housing need that exceed past trends are as follows: there is a growth strategy in place to promote and facilitate additional growth; strategic infrastructure improvements are likely to lead to an increase in the number of homes needed locally; and, an authority has agreed to accommodate unmet housing needs from a neighbouring area. The first two circumstances are relevant to Greater Cambridge. Paragraph 024 of Id.2a explains how the need for affordable housing is calculated, and it is suggested that the overall housing target should be increased where it could help deliver the required number of affordable homes. There is an urgent need to improve the affordability of housing and to boost affordable housing delivery in Greater Cambridge. Therefore, the emerging GCLP should use the standard method to calculate the minimum local housing need, and then make appropriate adjustments taking into account the growth strategies and strategic infrastructure improvements identified for Greater Cambridge, and a further adjustment to ensure affordable housing needs are met.
No uploaded files for public display
The emerging GCLP will need to be consistent with national guidance on meeting housing needs. Paragraph 59 of the NPPF confirms the Government’s objective to significantly boost the supply of housing, and to achieve this by ensuring that a sufficient amount and variety of land for housing is identified. Paragraph 60 expects the standard method to be used to determine the minimum number of houses needed. Paragraph 61 expects the size, type and tenure of housing needs of the community to be assessed and reflected in planning policies, including for example those with an affordable housing need, students, renters and self-builders. Section Id.2a of the Planning Practice Guidance explains how housing and economic needs assessments should be undertaken, including how to calculate local housing needs using the standard method. Paragraph 010 of Id.2a makes it clear that the standard method is the minimum starting point for determining local housing needs, and acknowledges that there may be circumstances where actual housing need is higher than the standard method indicates. As set out in Paragraph 010 the circumstances where increases to housing need that exceed past trends are as follows: there is a growth strategy in place to promote and facilitate additional growth; strategic infrastructure improvements are likely to lead to an increase in the number of homes needed locally; and, an authority has agreed to accommodate unmet housing needs from a neighbouring area. The first two circumstances are relevant to Greater Cambridge. Paragraph 024 of Id.2a explains how the need for affordable housing is calculated, and it is suggested that the overall housing target should be increased where it could help deliver the required number of affordable homes. There is an urgent need to improve the affordability of housing and to boost affordable housing delivery in Greater Cambridge. Therefore, the emerging GCLP should use the standard method to calculate the minimum local housing need, and then make appropriate adjustments taking into account the growth strategies and strategic infrastructure improvements identified for Greater Cambridge, and a further adjustment to ensure affordable housing needs are met.
No uploaded files for public display
The emerging GCLP will need to be consistent with national guidance on meeting housing needs. Paragraph 59 of the NPPF confirms the Government’s objective to significantly boost the supply of housing, and to achieve this by ensuring that a sufficient amount and variety of land for housing is identified. Paragraph 60 expects the standard method to be used to determine the minimum number of houses needed. Paragraph 61 expects the size, type and tenure of housing needs of the community to be assessed and reflected in planning policies, including for example those with an affordable housing need, students, renters and self-builders. Section Id.2a of the Planning Practice Guidance explains how housing and economic needs assessments should be undertaken, including how to calculate local housing needs using the standard method. Paragraph 010 of Id.2a makes it clear that the standard method is the minimum starting point for determining local housing needs, and acknowledges that there may be circumstances where actual housing need is higher than the standard method indicates. As set out in Paragraph 010 the circumstances where increases to housing need that exceed past trends are as follows: there is a growth strategy in place to promote and facilitate additional growth; strategic infrastructure improvements are likely to lead to an increase in the number of homes needed locally; and, an authority has agreed to accommodate unmet housing needs from a neighbouring area. The first two circumstances are relevant to Greater Cambridge. Paragraph 024 of Id.2a explains how the need for affordable housing is calculated, and it is suggested that the overall housing target should be increased where it could help deliver the required number of affordable homes. There is an urgent need to improve the affordability of housing and to boost affordable housing delivery in Greater Cambridge. Therefore, the emerging GCLP should use the standard method to calculate the minimum local housing need, and then make appropriate adjustments taking into account the growth strategies and strategic infrastructure improvements identified for Greater Cambridge, and a further adjustment to ensure affordable housing needs are met.
No uploaded files for public display