Appendix B: Assessment of Sites included in the Greater Cambridge Housing Trajectory - Unallocated Sites with Planning Permission

Showing comments and forms 1 to 25 of 25

Object

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168400

Received: 14/10/2019

Respondent: Linton Parish Council

Representation Summary:

Land north and south of Bartlow Road, Linton

It is neither justifiable nor reasonable to include this site in the trajectory as this was not allocated, is outside the village envelope and is not included in the current Local Plan.

The OL has now lapsed, an RM application has been refused and the second RM is not addressing the issues for refusal. The OL was granted following inaccurate information on the status of the floodplain and the extent of flooding at the site. Local objections, the effect on the landscape and loss of heritage assets were not properly considered. The officer assessment did not demonstrate any wider sustainability benefits to this community. The objections to this site are particularly strong so the applications should be refused.

Linton has provided around 50 dwellings not expected in the LP and within the village boundary. These provide sustainable windfall housing that should reasonably count towards the trajectory without the need to include the disputed development sites.

Object

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168401

Received: 14/10/2019

Respondent: Linton Parish Council

Representation Summary:

Horseheath Road, Linton

It is neither justifiable nor reasonable to include this site in the trajectory as this was not allocated, is outside the village envelope and is not included in the current Local Plan.

The OL approval might not be valid due to the inclusion of land not in the possession of the then owner - The Diocese of Ely.

Linton has provided around 50 dwellings not expected in the LP and within the village boundary. These provide sustainable windfall housing that should reasonably count towards the trajectory without the need to include the disputed development sites.

Comment

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168406

Received: 14/10/2019

Respondent: Middle Level Commissioners

Representation Summary:

Land rear of Cygnus Business Park, Swavesey

It is understood that three dwellings remain to be built within the next year.

Please note that Discharge Consent, as required under the Board's Byelaws, has not been sought for the existing development which is, therefore, illegal.

Comment

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168407

Received: 14/10/2019

Respondent: Middle Level Commissioners

Representation Summary:

18 Boxworth End, Swavesey

It is noted that this development will be constructed during 2021/22.

This development will require the provision of infrastructure possibly including a telemetry system to control the discharge into the adjacent Award Drain. The Board considers it appropriate that its requirements are met before work commences on site.

Whilst some initial discussion has occurred the developer has not yet provided any meaningful proposals or sought the Board's approval.

Comment

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168408

Received: 14/10/2019

Respondent: Middle Level Commissioners

Representation Summary:

Land rear of 130 Middlewatch, Swavesey

It is noted that this development will be constructed during 2021/23.

This development will require the provision of infrastructure possibly including a telemetry system to control the discharge into the adjacent Award Drain. The Board considers it appropriate that its requirements are met before work commences on site.

Whilst a meeting has been held with the developer's consultant and discussion has occurred, the developer has not yet provided any meaningful proposals or sought the Board's approval.

Comment

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168409

Received: 14/10/2019

Respondent: Middle Level Commissioners

Representation Summary:

Land south of Fen Drayton Road, Swavesey

It is noted that this development will be constructed during 2020/23.

This development will require the provision of infrastructure possibly including a telemetry system to control the discharge into the adjacent Flood Risk Management System. The Board considers it appropriate that its requirements are met before work commences on site.

Whilst a meeting has been held with the developer's consultant and discussion has occurred the developer has not yet provided any meaningful proposals or sought the Board's approval.

Object

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168430

Received: 14/10/2019

Respondent: Abbey Properties Cambridgeshire Limited

Representation Summary:

Hallmark Hotel, Bar Hill

Lack of condition discharge application. Council has used their own assumed trajectory figure.

Therefore -40 dwellings.

Object

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168431

Received: 14/10/2019

Respondent: Abbey Properties Cambridgeshire Limited

Representation Summary:

Land off Rampton Road, Cottenham

Lack of Reserved Matters consents and existing objections from statutory consultees. Previous aborted sale.

Therefore -40 dwellings.

Object

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168432

Received: 14/10/2019

Respondent: Abbey Properties Cambridgeshire Limited

Representation Summary:

Land rear of 130 Middlewatch, Swavesey

Lack of Reserved Matters consents and objections from statutory consultees. Agent raised concerns over market conditions and no information provided in terms of trajectory so Council has used their own assumed trajectory figure.

Therefore -40 dwellings.

Object

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168433

Received: 14/10/2019

Respondent: Abbey Properties Cambridgeshire Limited

Representation Summary:

Land south of 1b Over Road, Willingham

Lack of Reserved Matters consent. Landowner says site to be sold. Council has used their own assumed trajectory figure.

Therefore -26 dwellings.

Object

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168434

Received: 14/10/2019

Respondent: Abbey Properties Cambridgeshire Limited

Representation Summary:

Land north and south of Bartlow Road, Linton

Reserved Matters application refused and appeal lodged. Revised Reserved Matters application undetermined.

Therefore -55 dwellings.

Object

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168435

Received: 14/10/2019

Respondent: Abbey Properties Cambridgeshire Limited

Representation Summary:

Land at Teversham Road, Fulbourn

Lack of Reserved Matters application with deadline approaching. Not clear whether a developer is involved.

Therefore -110 dwellings.

Object

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168436

Received: 14/10/2019

Respondent: Abbey Properties Cambridgeshire Limited

Representation Summary:

South of 279 St Neots Road, Hardwick

Reserved Matters application and discharge of conditions withdrawn. Council has used their own assumed trajectory figure.

Therefore -112 dwellings.

Object

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168437

Received: 14/10/2019

Respondent: Abbey Properties Cambridgeshire Limited

Representation Summary:

Land adjacent Longstanton Road, Over

No decision on application to vary the approved plans. Agent lists various delivery issues including market conditions and archaeology.

Therefore -26 dwellings.

Object

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168438

Received: 14/10/2019

Respondent: Abbey Properties Cambridgeshire Limited

Representation Summary:

Land at Meldreth Road, Shepreth

Lack of any conditions discharged. Not clear whether developer is involved. Council has used their own assumed trajectory figure.

Therefore -25 dwellings.

Object

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168439

Received: 14/10/2019

Respondent: Abbey Properties Cambridgeshire Limited

Representation Summary:

Land off Grafton Drive, Caldecote

No Reserved Matters application. Landowners says site needs to be sold.

Therefore -30 dwellings.

Object

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168440

Received: 14/10/2019

Respondent: Abbey Properties Cambridgeshire Limited

Representation Summary:

Horseheath Road, Linton

Pending Outline planning application (2017 application). Landowner says site needs to be sold.

Therefore -42 dwellings.

Object

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168441

Received: 14/10/2019

Respondent: Abbey Properties Cambridgeshire Limited

Representation Summary:

Land off Fen End, Over

Need for replan of the scheme according to landowner. No further planning applications or discharge of conditions.

Therefore -20 dwellings.

Object

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168442

Received: 14/10/2019

Respondent: Abbey Properties Cambridgeshire Limited

Representation Summary:

Land north east of Rampton Road, Cottenham

No reserved matters application. Not clear whether a developer is involved. Council has used their own assumed trajectory figure. Delivery of 74 dwellings in one year is very unrealistic.

Therefore -154 dwellings.

Object

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168443

Received: 14/10/2019

Respondent: Abbey Properties Cambridgeshire Limited

Representation Summary:

Rear of 46-56 The Moor, Melbourn

No progress with planning conditions. No landowner response. Council has used their own assumed trajectory figure.

Therefore -23 dwellings.

Object

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168458

Received: 14/10/2019

Respondent: Pigeon Land Ltd

Agent: Savills

Representation Summary:

Land south of 1b Over Road, Willingham

We consider there might very well not be sufficient clear evidence of deliverability for 26 dwellings within the five year supply.

Object

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168459

Received: 14/10/2019

Respondent: Pigeon Land Ltd

Agent: Savills

Representation Summary:

South of Thompsons Meadow, Trap Road, Guilden Morden

We consider there might very well not be sufficient clear evidence of deliverability for 8 dwellings within the five year supply.

Object

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168460

Received: 14/10/2019

Respondent: Pigeon Land Ltd

Agent: Savills

Representation Summary:

Rear of 79 High Street, Meldreth

We consider there might very well not be sufficient clear evidence of deliverability for 18 dwellings within the five year supply.

Object

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168461

Received: 14/10/2019

Respondent: Pigeon Land Ltd

Agent: Savills

Representation Summary:

Land at Teversham Road, Fulbourn

We consider there might very well not be sufficient clear evidence of deliverability for 110 dwellings within the five year supply.

Object

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168462

Received: 14/10/2019

Respondent: Pigeon Land Ltd

Agent: Savills

Representation Summary:

Land north east of Rampton Road, Cottenham

We consider there might very well not be sufficient clear evidence of deliverability for 154 dwellings within the five year supply.