5.6.10
Object
Draft Planning Obligations SPD
Representation ID: 28559
Received: 14/07/2014
Respondent: Carter Jonas
Agent: Carter Jonas
If this means, as per section 5.7 of the strategy, that the expectation is that full open space provision (informal space) is made available on all sites, and no element of the required provision can be commuted through planning obligation then I object to this most vigorously. The current system of negotiating an appropriate level of on-site provision having regard to a range of factors is sensible and should be continued.
If this means, as per section 5.7 of the strategy, that the expectation is that full open space provision (informal space) is made available on all sites, and no element of the required provision can be commuted through planning obligation then I object to this most vigorously. The current system of negotiating an appropriate level of on-site provision having regard to a range of factors is sensible and should be continued.