Question 26b

Showing comments and forms 1 to 11 of 11

Comment

Cambridge Northern Fringe East AAP - Issues and Options

Representation ID: 29245

Received: 08/12/2014

Respondent: Ben Cofield

Representation Summary:

I would like to see a hotel here, or 2 hotels, and consider a mixed-used area essential. We should most certainly consider conference accommodation, as people would more than likely use this hotel than central ones, meaning less traffic and easier access for residents of East Anglia.

Full text:

I would like to see a hotel here, or 2 hotels, and consider a mixed-used area essential. We should most certainly consider conference accommodation, as people would more than likely use this hotel than central ones, meaning less traffic and easier access for residents of East Anglia.

Support

Cambridge Northern Fringe East AAP - Issues and Options

Representation ID: 29443

Received: 17/01/2015

Respondent: Nicky Morland

Representation Summary:

Important to provide hotel facilities in this development

Full text:

Important to provide hotel facilities in this development

Support

Cambridge Northern Fringe East AAP - Issues and Options

Representation ID: 29565

Received: 23/01/2015

Respondent: Mrs Sasha Wilson

Representation Summary:

Should be included

Full text:

Should be included

Support

Cambridge Northern Fringe East AAP - Issues and Options

Representation ID: 29675

Received: 02/02/2015

Respondent: Brookgate

Agent: Bidwells

Representation Summary:

Support, however subject to viability conference facilities could also be provided. The development of the new railway station and regeneration of the wider CNFE area will create a demand for a hotel in this location. The land adjacent to the new station provides a sustainable and accessible location for a hotel to serve business users associated with the large number of existing and proposed businesses in the CNFE area. The proposed vision for the CNFE states that the area will embrace modern commercial business needs and ensure that the new area is supported with the right social and community infrastructure.

Full text:

Support, however subject to viability conference facilities could also be provided. The development of the new railway station and regeneration of the wider CNFE area will create a demand for a hotel in this location. The land adjacent to the new station provides a sustainable and accessible location for a hotel to serve business users associated with the large number of existing and proposed businesses in the CNFE area. The proposed vision for the CNFE states that the area will embrace modern commercial business needs and ensure that the new area is supported with the right social and community infrastructure.

Support

Cambridge Northern Fringe East AAP - Issues and Options

Representation ID: 29783

Received: 30/01/2015

Respondent: CODE Development Planners Ltd

Agent: CODE Development Planners Ltd

Representation Summary:

An area of land close to the railway station should be provided with dual use allocation of either residential or hotel. If the market demands are great enough the hotel will be developed. The provision of a conference centre could be integrated into the hotel as an ancillary use.

Full text:

An area of land close to the railway station should be provided with dual use allocation of either residential or hotel. If the market demands are great enough the hotel will be developed. The provision of a conference centre could be integrated into the hotel as an ancillary use.

Comment

Cambridge Northern Fringe East AAP - Issues and Options

Representation ID: 29902

Received: 02/02/2015

Respondent: Cambridgeshire County Council

Representation Summary:

If a hotel is provided it should be in a location where amenity issues from the Water Recycling Centre, aggregate railheads and existing and planned waste uses will not arise and / or can be satisfactorily mitigated.

Support either option B or C but may depend on whether development of a hotel at the entrance to the Science Park goes ahead. Any provision allocation in the AAP needs to be kept flexible if no demand materialises.

Full text:

If a hotel is provided it should be in a location where amenity issues from the Water Recycling Centre, aggregate railheads and existing and planned waste uses will not arise and / or can be satisfactorily mitigated.

Support either option B or C but may depend on whether development of a hotel at the entrance to the Science Park goes ahead. Any provision allocation in the AAP needs to be kept flexible if no demand materialises.

Support

Cambridge Northern Fringe East AAP - Issues and Options

Representation ID: 30030

Received: 02/02/2015

Respondent: Orchard Street Investment Management LLP

Agent: Beacon Planning

Representation Summary:

Would support business uses on CNFE and Science Park.

Full text:

Would support business uses on CNFE and Science Park.

Object

Cambridge Northern Fringe East AAP - Issues and Options

Representation ID: 30169

Received: 02/02/2015

Respondent: Grosvenor Developments

Agent: AECOM

Representation Summary:

No additional comment

Full text:

No additional comment

Object

Cambridge Northern Fringe East AAP - Issues and Options

Representation ID: 30324

Received: 02/02/2015

Respondent: Coulson Building Group

Representation Summary:

I support Option C.

Full text:

I support Option C.

Support

Cambridge Northern Fringe East AAP - Issues and Options

Representation ID: 30479

Received: 02/02/2015

Respondent: Indigo Planning Ltd

Representation Summary:

TCE support the provision of a hotel and/or conference facilities within the mixed-use development of land around the proposed new railway station, on the basis that this would be a supporting use with the focus remaining on employment and office floor space.

Full text:

See attached document

Support

Cambridge Northern Fringe East AAP - Issues and Options

Representation ID: 30592

Received: 19/01/2015

Respondent: Silke Scheler

Representation Summary:

Yes.

Full text:

I find all proposed options to be too restricted with the use of space. A mix of residential use, offices and industry would be preferable to give it a more natural feel. For example, leave the Nuffield Road industrial area and more residential use development further north. Also consider a more modular approach that allows to develop toward a future goal, but doesn't depend on things (like moving the water recycling centre) from the get go.

*******************


9) Objective 3 shouldn't get highest priority.
14) 11-13 are too divided in to use of space, a more natural mix of residential, offices and industrial would be better. Also, re-use as much of what is already there as possible.
15, 16, 17) No clear explanations, which means meaning will be defined later.
18b) Would destroy the feeling of that part of the city.
23c) Science Park should be independent.
24d) This should only be considered if there are no other options. Moving the businesses will be expesive, so leave them there and build the residential area somewhere else.
30e) Student accomodation should be integrated so they won't all be in the same area.
36) Whatever makes best sense for transport at the current stage of the project.