Object
Waterbeach New Town Supplementary Planning Document
Representation ID: 167482
Received: 26/10/2018
Respondent: Waterbeach and District Bridleways Group
Representation Summary:
4.2 KEY STRUCTURING ELEMENTS (FIXES)
Public Transport
Until the outcome of the A10 Corridor study is known, the viability of proposed transport mitigation cannot be assessed. If mitigation is delayed until 1400 dwellings have been occupied any construction traffic needed to change the A10 will add to the congestion.