Waterbeach New Town Supplementary Planning Document

Representation ID: 167607

Received: 25/10/2018

Respondent: mr jonathan taylor

Representation Summary:

4.2 KEY STRUCTURING ELEMENTS (FIXES)
EDGE TREATMENTS
More green space should be provided at the southern end of the new town to ensure the existing village continues to benefit from a fen edge landscape.

Full text:

The SPD does not provide sufficient guidance to encourage non motor vehicle transport use. The Waterbeach Cycling Campaign has proposed an alternative plan for a ring road and prioritised cross site routes for cyclists and pedestrians. I support this alternative plan. https://drive.google.com/file/d/1-J6qULLZyibevSF5mB6ISzfybDUDsq8I/view

Roads within the new town should be clearly programmed to ensure construction traffic and users traffic for the new station do not access the station through the existing village.

More green space should be provided at the southern end of the new town to ensure the existing village continues to benefit from a fen edge landscape.