Comment

Draft Bourn Airfield Supplementary Planning Document - June 2019

Representation ID: 168179

Received: 29/07/2019

Respondent: Aitchison Developments Ltd. on behalf of Savills Investment Management

Agent: Neame Sutton Ltd

Representation Summary:

FIX B STRATEGIC WALKING AND CYCLING CONNECTIONS

Fix B (page 39) identifies a strategic pedestrian and cycle network cutting through the existing employment site to link the proposed public transport corridor to the north with residential areas to the south. Whilst this is not objected to in principle, and indeed is provided within the Development proposals for the site, the spatial fix needs to be applied flexibly to allow the proposed employment layout to make the most efficient use of the space available.

Attachments: