Comment
Draft Bourn Airfield Supplementary Planning Document - June 2019
Representation ID: 168179
Received: 29/07/2019
Respondent: Aitchison Developments Ltd. on behalf of Savills Investment Management
Agent: Neame Sutton Ltd
Representation Summary:
FIX B STRATEGIC WALKING AND CYCLING CONNECTIONS
Fix B (page 39) identifies a strategic pedestrian and cycle network cutting through the existing employment site to link the proposed public transport corridor to the north with residential areas to the south. Whilst this is not objected to in principle, and indeed is provided within the Development proposals for the site, the spatial fix needs to be applied flexibly to allow the proposed employment layout to make the most efficient use of the space available.