Object

Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document

Representation ID: 168444

Received: 14/10/2019

Respondent: Abbey Properties Cambridgeshire Limited

Representation Summary:

We consider that the 5 year supply of housing within South Cambridgeshire has been over estimated by 2,164 dwellings. The impact of this over estimation is such that the asserted supply reduces below 5 years for South Cambridgeshire to 3.82 years using the Liverpool method, 3.20 years using the Sedgefield method and 3.89 years using the National Methodology. The impact on the Greater Cambridge figures would be similar and in all circumstances below 5 years also.