The relocation of Waste Water Recycling Centre site is not realistic within the plan period.
The Waste Water Recycling Centre would be heavily contaminated and costs of remediating that land would not be attractive to investors.
The delivery of this quantum of development could allow for the development principles outlined in the Issues and Options paper to be implemented.
The development outcome would be for 630 dwellings in an area which would provide for 27,600 jobs. This is not considered to be a sustainable balance of homes to jobs.

Full text:

The relocation of the Waste Water Recycling Centre site is not realistic within the plan period. The operator has committed to an investment programme of circa £20m to upgrade the operations to meet with the demands from a growing Cambridge population. It is extremely unlikely that the operator would be prepared to sell a key asset in an area of population growth when there is no clear and deliverable plan on the relocation of this essential infrastructure asset.
The Waste Water Recycling Centre which is identified for redevelopment would be heavily contaminated and the costs of remediating that land would not be attractive to investors given that the returns gained from the development would be for B2 and/or B8 Uses.
The delivery of this quantum of development could allow for the development principles outlined in the Issues and Options paper to be implemented. However, the positioning of B1(b) uses adjacent to the railway line, the aggregates railhead, industrial areas and access routes for HGV's will not be attractive to the R&D market. These sites will be subject to issues associated with noise, vibration, odour and dust which does not indicate that they would be suitable for R&D purposes. It would be more appropriate if these sites where allocated directly for general office use or intensification of B2 and B8 uses.
The land uses section of the analysis table does not take into account the loss of the golf driving range. As per NPPF and Sport England requirements should a facility of equal or greater value not be sourced within a short distance of the site?
The delivery of the development proposed will be subject to the delivery of the necessary infrastructure upgrades such as the Milton Road interchange. There is significant doubt on whether these will all be in place on time to meet with the residential, office and R&D sector demands. The concerns are related to how the infrastructure improvements will be funded and how long they will take to be implemented, given that many have not reached a final design stage.
The development outcome would be for 630 dwellings in an area which would provide for 27,600 jobs. This is not considered to be a sustainable balance of homes to jobs.