Comment

Cambridge Northern Fringe East AAP - Issues and Options

Representation ID: 29953

Received: 02/02/2015

Respondent: Cambridgeshire County Council

Representation Summary:

Option B may be difficult to deliver given that a developer of the early phases may not be aware of issues and constraints in areas they do not propose to develop, and therefore it may not be appropriate to propose detailed master planning proposals for other areas of the CNFE. In particular the reduction in size and enclosure of the Water Recycling Centre in Option 3 could take different forms and be located in different ways on the site depending on the constraints placed on the redevelopment by the inlet works and other technical aspects of the development.

Full text:

Option B may be difficult to deliver given that a developer of the early phases may not be aware of issues and constraints in areas they do not propose to develop, and therefore it may not be appropriate to propose detailed master planning proposals for other areas of the CNFE. In particular the reduction in size and enclosure of the Water Recycling Centre in Option 3 could take different forms and be located in different ways on the site depending on the constraints placed on the redevelopment by the inlet works and other technical aspects of the development.