Support
Cambridge Northern Fringe East AAP - Issues and Options
Representation ID: 30362
Received: 02/02/2015
Respondent: Cambridge Past, Present and Future
Representation Summary:
This is our second preference option. We support it as a reserve option in the event that Option 4 is not deliverable. Reconfiguring the water treatment plant as proposed will greatly improve the development potential of the overall site, but not as optimally as Option 4.
Full text:
This is our second preference option. We support it as a reserve option in the event that Option 4 is not deliverable. Reconfiguring the water treatment plant as proposed will greatly improve the development potential of the overall site, but not as optimally as Option 4.