Support
Cambridge Northern Fringe East AAP - Issues and Options
Representation ID: 30521
Received: 02/02/2015
Respondent: Cambridge City Council
Representation Summary:
Support. Transport will be a key issue for this area given the pressures on capacity locally. Transport and improvements to infrastructure need to consider the whole CNFE AAP area so that any improvements needed reflect the future needs of the whole area and not individual land ownerships. Incremental improvements by various land owners based on demand and phasing related only to that land ownership should be resisted as that may lead to greater disruption over the period in which the CNFE is developed, both to those with the CNFE area and outside as offsite improvements are likely to be required.
Full text:
See attached document