Support
Land North of Cherry Hinton SPD
Representation ID: 31624
Received: 21/08/2017
Respondent: Peter Tribble
It is important that cycle infrastructure is complete. The viability of a route is often determined by its weakest point, not it's strongest.
Specifically here, a segregated path alongside Coldham's lane would link well with existing cycle paths along Barnwell Road and Coldham's lane the other side of the Sainsbury's roundabout.
More needs to be done to improve cycle routes into Cambridge centre, though.
It is important that cycle infrastructure is complete. The viability of a route is often determined by its weakest point, not it's strongest.
Specifically here, a segregated path alongside Coldham's lane would link well with existing cycle paths along Barnwell Road and Coldham's lane the other side of the Sainsbury's roundabout.
More needs to be done to improve cycle routes into Cambridge centre, though.