Comment
Greater Cambridge Local Plan Preferred Options
Representation ID: 57492
Received: 10/12/2021
Respondent: Mrs Catherine Martin
Representation Summary:
Rebuilding an industrial scale sewage plant with 20 meter towers on a flat fen landscape is totally at odds with this policy. It will be clearly visible from many PRoWs in this area including the walk from the River Cam at historic Baits Bite Lock.
Full text:
Rebuilding an industrial scale sewage plant with 20 meter towers on a flat fen landscape is totally at odds with this policy. It will be clearly visible from many PRoWs in this area including the walk from the River Cam at historic Baits Bite Lock.