Map Fig 22: shows the proposed new site allocations, including North East Cambridge (Policy S/NEC).
As outlined within proposed Policy S/NEC, the corresponding Waste Water Treatment Works relocation is being led by Anglian Water under a separate process. However, map Fig 22 should also display for reference the proposed relocation site for the Waste Water Treatment Works to provide proper context for the S/NEC Policy in terms of future land use and corresponding Green Belt cost, or neither until the DCO is approved.

Full text:

Map Fig 22: shows the proposed new site allocations, including North East Cambridge (Policy S/NEC).
As outlined within proposed Policy S/NEC, the corresponding Waste Water Treatment Works relocation is being led by Anglian Water under a separate process. However, map Fig 22 should also display for reference the proposed relocation site for the Waste Water Treatment Works to provide proper context for the S/NEC Policy in terms of future land use and corresponding Green Belt cost, or neither until the DCO is approved.