Comment
Greater Cambridge Local Plan Preferred Options
Representation ID: 58134
Received: 12/12/2021
Respondent: Mr Matthew Asplin
Policy BG/RC is supported, noting that the proposed development under Policy S/NEC and the green belt site proposed for the corresponding relocation of the current operational Waste Water Treatment Works will both be very clearly visible from the river corridor and surrounding landscape.
This does not appear to be reflected under Policy S/NEC.
Policy BG/RC is supported, noting that the proposed development under Policy S/NEC and the green belt site proposed for the corresponding relocation of the current operational Waste Water Treatment Works will both be very clearly visible from the river corridor and surrounding landscape.
This does not appear to be reflected under Policy S/NEC.