4.8.5
Object
Mill Road Depot Draft Planning and Development Brief SPD
Representation ID: 31000
Received: 13/07/2016
Respondent: Mr Edward Leigh
Support - Consideration should be given to providing piped access to underground rainwater reservoirs so that property owners with gardens and park attendants can draw on it (using a pump and a flexible pipe). This would obviate the need for ugly water butts, which quickly run dry in the summer.
Support - Consideration should be given to providing piped access to underground rainwater reservoirs so that property owners with gardens and park attendants can draw on it (using a pump and a flexible pipe). This would obviate the need for ugly water butts, which quickly run dry in the summer.
Object
Mill Road Depot Draft Planning and Development Brief SPD
Representation ID: 31055
Received: 21/07/2016
Respondent: Cambridge Association of Architects
Above ground water storage should be allocated, or at least allocated on the illustrative plan
Above ground water storage should be allocated, or at least allocated on the illustrative plan