Waterbeach New Town Supplementary Planning Document

Search representations

Results for The National Trust search

New search New search

Comment

Waterbeach New Town Supplementary Planning Document

Waterbeach New Town SPD

Representation ID: 167286

Received: 23/10/2018

Respondent: The National Trust

Representation Summary:

2.3 ACCESS, MOVEMENT & CONNECTIVITY
Comment: Comprehensive sustainable movement framework and a potential connection to Cycle Route 11 shown in Figure 6 is noted.

Full text:

Please refer to uploaded document.

2.3 ACCESS, MOVEMENT AND CONNECTIVITY
Comment: Comprehensive sustainable movement framework and a potential connection to Cycle Route 11 shown in Figure 6 is noted.

2.6 SURROUNDING CONTEXT
Support: Reference to the Wicken Fen Vision.
Objection: Opportunities have been missed to look beyond the immediate site boundaries and to integrate the site
effectively with the surrounding countryside. The site also has a relationship to rural parts of East Cambridgeshire, located to the
north east of the development.

4.2 KEY STRUCTURING ELEMENTS
Support: Broadly support the proposed approach to Structuring Elements and Guiding Principles.

4.2.3 PRIMARY MOVEMENT ACCESS
Objection: Primary movement and Access: The proposals for cycling and pedestrian movement omit reference to:
- pedestrian and cycle links the north to the north and east, including the Fen Rivers Way;
- and Lodes Way (National Cycle Route 11).
Support: Inclusion of the 'missing link', which would connect Waterbeach to Wicken. The Trust is supportive of this scheme subject to being satisfied that measures are in place to protect ecologically sensitive parts of the Wicken Fen reserve.

4.2.6 PUBLIC SPACES
Support: Green infrastructure; delivery of high quality multifunctional green spaces and wider connectivity.

4.2.10 EDGE TREATMENTS
Comment: Principle 7 Greenways and Corridors should consider specific enhancement opportunities, and articulate a long term vision for enhancing the Fen Edge and Rail corridor.

5.5 GUIDING PRINCIPLES - 20 Create a multifunctional Green Network
Objection: Commitment needed in SPD to this Guiding Principle otherwise SPD is not fully compliant with Local Plan Policy NH4 in terms of aiding the delivery of the Cambridgeshire Green Infrastructure Strategy.

6.2 INFRASTRUCTURE DELIVERY PLAN
Comment: The SPD should endorse the use of the Natural Cambridgeshire Local Nature Partnership's (LNP) Developing with Nature Toolkit in the design and delivery of multi-functional habitats at Waterbeach.

Support

Waterbeach New Town Supplementary Planning Document

Waterbeach New Town SPD

Representation ID: 167388

Received: 23/10/2018

Respondent: The National Trust

Representation Summary:

2.6 SURROUNDING CONTEXT
Support: Reference to the Wicken Fen Vision.

Full text:

Please refer to uploaded document.

2.3 ACCESS, MOVEMENT AND CONNECTIVITY
Comment: Comprehensive sustainable movement framework and a potential connection to Cycle Route 11 shown in Figure 6 is noted.

2.6 SURROUNDING CONTEXT
Support: Reference to the Wicken Fen Vision.
Objection: Opportunities have been missed to look beyond the immediate site boundaries and to integrate the site
effectively with the surrounding countryside. The site also has a relationship to rural parts of East Cambridgeshire, located to the
north east of the development.

4.2 KEY STRUCTURING ELEMENTS
Support: Broadly support the proposed approach to Structuring Elements and Guiding Principles.

4.2.3 PRIMARY MOVEMENT ACCESS
Objection: Primary movement and Access: The proposals for cycling and pedestrian movement omit reference to:
- pedestrian and cycle links the north to the north and east, including the Fen Rivers Way;
- and Lodes Way (National Cycle Route 11).
Support: Inclusion of the 'missing link', which would connect Waterbeach to Wicken. The Trust is supportive of this scheme subject to being satisfied that measures are in place to protect ecologically sensitive parts of the Wicken Fen reserve.

4.2.6 PUBLIC SPACES
Support: Green infrastructure; delivery of high quality multifunctional green spaces and wider connectivity.

4.2.10 EDGE TREATMENTS
Comment: Principle 7 Greenways and Corridors should consider specific enhancement opportunities, and articulate a long term vision for enhancing the Fen Edge and Rail corridor.

5.5 GUIDING PRINCIPLES - 20 Create a multifunctional Green Network
Objection: Commitment needed in SPD to this Guiding Principle otherwise SPD is not fully compliant with Local Plan Policy NH4 in terms of aiding the delivery of the Cambridgeshire Green Infrastructure Strategy.

6.2 INFRASTRUCTURE DELIVERY PLAN
Comment: The SPD should endorse the use of the Natural Cambridgeshire Local Nature Partnership's (LNP) Developing with Nature Toolkit in the design and delivery of multi-functional habitats at Waterbeach.

Object

Waterbeach New Town Supplementary Planning Document

Waterbeach New Town SPD

Representation ID: 167389

Received: 23/10/2018

Respondent: The National Trust

Representation Summary:

2.6 SURROUNDING CONTEXT
Objection: Opportunities have been missed to look beyond the immediate site boundaries and to integrate the site effectively with the surrounding countryside. The site also has a relationship to rural parts of East Cambridgeshire, located to the
north east of the development.

Full text:

Please refer to uploaded document.

2.3 ACCESS, MOVEMENT AND CONNECTIVITY
Comment: Comprehensive sustainable movement framework and a potential connection to Cycle Route 11 shown in Figure 6 is noted.

2.6 SURROUNDING CONTEXT
Support: Reference to the Wicken Fen Vision.
Objection: Opportunities have been missed to look beyond the immediate site boundaries and to integrate the site
effectively with the surrounding countryside. The site also has a relationship to rural parts of East Cambridgeshire, located to the
north east of the development.

4.2 KEY STRUCTURING ELEMENTS
Support: Broadly support the proposed approach to Structuring Elements and Guiding Principles.

4.2.3 PRIMARY MOVEMENT ACCESS
Objection: Primary movement and Access: The proposals for cycling and pedestrian movement omit reference to:
- pedestrian and cycle links the north to the north and east, including the Fen Rivers Way;
- and Lodes Way (National Cycle Route 11).
Support: Inclusion of the 'missing link', which would connect Waterbeach to Wicken. The Trust is supportive of this scheme subject to being satisfied that measures are in place to protect ecologically sensitive parts of the Wicken Fen reserve.

4.2.6 PUBLIC SPACES
Support: Green infrastructure; delivery of high quality multifunctional green spaces and wider connectivity.

4.2.10 EDGE TREATMENTS
Comment: Principle 7 Greenways and Corridors should consider specific enhancement opportunities, and articulate a long term vision for enhancing the Fen Edge and Rail corridor.

5.5 GUIDING PRINCIPLES - 20 Create a multifunctional Green Network
Objection: Commitment needed in SPD to this Guiding Principle otherwise SPD is not fully compliant with Local Plan Policy NH4 in terms of aiding the delivery of the Cambridgeshire Green Infrastructure Strategy.

6.2 INFRASTRUCTURE DELIVERY PLAN
Comment: The SPD should endorse the use of the Natural Cambridgeshire Local Nature Partnership's (LNP) Developing with Nature Toolkit in the design and delivery of multi-functional habitats at Waterbeach.

Support

Waterbeach New Town Supplementary Planning Document

Waterbeach New Town SPD

Representation ID: 167390

Received: 23/10/2018

Respondent: The National Trust

Representation Summary:

4.2 KEY STRUCTURING ELEMENTS (FIXES)
Support: Broadly support the proposed approach to Structuring Elements and Guiding Principles.

Full text:

Please refer to uploaded document.

2.3 ACCESS, MOVEMENT AND CONNECTIVITY
Comment: Comprehensive sustainable movement framework and a potential connection to Cycle Route 11 shown in Figure 6 is noted.

2.6 SURROUNDING CONTEXT
Support: Reference to the Wicken Fen Vision.
Objection: Opportunities have been missed to look beyond the immediate site boundaries and to integrate the site
effectively with the surrounding countryside. The site also has a relationship to rural parts of East Cambridgeshire, located to the
north east of the development.

4.2 KEY STRUCTURING ELEMENTS
Support: Broadly support the proposed approach to Structuring Elements and Guiding Principles.

4.2.3 PRIMARY MOVEMENT ACCESS
Objection: Primary movement and Access: The proposals for cycling and pedestrian movement omit reference to:
- pedestrian and cycle links the north to the north and east, including the Fen Rivers Way;
- and Lodes Way (National Cycle Route 11).
Support: Inclusion of the 'missing link', which would connect Waterbeach to Wicken. The Trust is supportive of this scheme subject to being satisfied that measures are in place to protect ecologically sensitive parts of the Wicken Fen reserve.

4.2.6 PUBLIC SPACES
Support: Green infrastructure; delivery of high quality multifunctional green spaces and wider connectivity.

4.2.10 EDGE TREATMENTS
Comment: Principle 7 Greenways and Corridors should consider specific enhancement opportunities, and articulate a long term vision for enhancing the Fen Edge and Rail corridor.

5.5 GUIDING PRINCIPLES - 20 Create a multifunctional Green Network
Objection: Commitment needed in SPD to this Guiding Principle otherwise SPD is not fully compliant with Local Plan Policy NH4 in terms of aiding the delivery of the Cambridgeshire Green Infrastructure Strategy.

6.2 INFRASTRUCTURE DELIVERY PLAN
Comment: The SPD should endorse the use of the Natural Cambridgeshire Local Nature Partnership's (LNP) Developing with Nature Toolkit in the design and delivery of multi-functional habitats at Waterbeach.

Object

Waterbeach New Town Supplementary Planning Document

Waterbeach New Town SPD

Representation ID: 167391

Received: 23/10/2018

Respondent: The National Trust

Representation Summary:

4.2 KEY STRUCTURING ELEMENTS (FIXES)
PRIMARY MOVEMENT AND ACCESS
Objection: Primary movement and Access: The proposals for cycling and pedestrian movement omit reference to:
- pedestrian and cycle links the north to the north and east, including the Fen Rivers Way;
- and Lodes Way (National Cycle Route 11).

Full text:

Please refer to uploaded document.

2.3 ACCESS, MOVEMENT AND CONNECTIVITY
Comment: Comprehensive sustainable movement framework and a potential connection to Cycle Route 11 shown in Figure 6 is noted.

2.6 SURROUNDING CONTEXT
Support: Reference to the Wicken Fen Vision.
Objection: Opportunities have been missed to look beyond the immediate site boundaries and to integrate the site
effectively with the surrounding countryside. The site also has a relationship to rural parts of East Cambridgeshire, located to the
north east of the development.

4.2 KEY STRUCTURING ELEMENTS
Support: Broadly support the proposed approach to Structuring Elements and Guiding Principles.

4.2.3 PRIMARY MOVEMENT ACCESS
Objection: Primary movement and Access: The proposals for cycling and pedestrian movement omit reference to:
- pedestrian and cycle links the north to the north and east, including the Fen Rivers Way;
- and Lodes Way (National Cycle Route 11).
Support: Inclusion of the 'missing link', which would connect Waterbeach to Wicken. The Trust is supportive of this scheme subject to being satisfied that measures are in place to protect ecologically sensitive parts of the Wicken Fen reserve.

4.2.6 PUBLIC SPACES
Support: Green infrastructure; delivery of high quality multifunctional green spaces and wider connectivity.

4.2.10 EDGE TREATMENTS
Comment: Principle 7 Greenways and Corridors should consider specific enhancement opportunities, and articulate a long term vision for enhancing the Fen Edge and Rail corridor.

5.5 GUIDING PRINCIPLES - 20 Create a multifunctional Green Network
Objection: Commitment needed in SPD to this Guiding Principle otherwise SPD is not fully compliant with Local Plan Policy NH4 in terms of aiding the delivery of the Cambridgeshire Green Infrastructure Strategy.

6.2 INFRASTRUCTURE DELIVERY PLAN
Comment: The SPD should endorse the use of the Natural Cambridgeshire Local Nature Partnership's (LNP) Developing with Nature Toolkit in the design and delivery of multi-functional habitats at Waterbeach.

Support

Waterbeach New Town Supplementary Planning Document

Waterbeach New Town SPD

Representation ID: 167393

Received: 23/10/2018

Respondent: The National Trust

Representation Summary:

4.2 KEY STRUCTURING ELEMENTS (FIXES)
PRIMARY MOVEMENT AND ACCESS
Support: Inclusion of the 'missing link', which would connect Waterbeach to Wicken. The Trust is supportive of this scheme subject to being satisfied that measures are in place to protect ecologically sensitive parts of the Wicken Fen reserve.

Full text:

Please refer to uploaded document.

2.3 ACCESS, MOVEMENT AND CONNECTIVITY
Comment: Comprehensive sustainable movement framework and a potential connection to Cycle Route 11 shown in Figure 6 is noted.

2.6 SURROUNDING CONTEXT
Support: Reference to the Wicken Fen Vision.
Objection: Opportunities have been missed to look beyond the immediate site boundaries and to integrate the site
effectively with the surrounding countryside. The site also has a relationship to rural parts of East Cambridgeshire, located to the
north east of the development.

4.2 KEY STRUCTURING ELEMENTS
Support: Broadly support the proposed approach to Structuring Elements and Guiding Principles.

4.2.3 PRIMARY MOVEMENT ACCESS
Objection: Primary movement and Access: The proposals for cycling and pedestrian movement omit reference to:
- pedestrian and cycle links the north to the north and east, including the Fen Rivers Way;
- and Lodes Way (National Cycle Route 11).
Support: Inclusion of the 'missing link', which would connect Waterbeach to Wicken. The Trust is supportive of this scheme subject to being satisfied that measures are in place to protect ecologically sensitive parts of the Wicken Fen reserve.

4.2.6 PUBLIC SPACES
Support: Green infrastructure; delivery of high quality multifunctional green spaces and wider connectivity.

4.2.10 EDGE TREATMENTS
Comment: Principle 7 Greenways and Corridors should consider specific enhancement opportunities, and articulate a long term vision for enhancing the Fen Edge and Rail corridor.

5.5 GUIDING PRINCIPLES - 20 Create a multifunctional Green Network
Objection: Commitment needed in SPD to this Guiding Principle otherwise SPD is not fully compliant with Local Plan Policy NH4 in terms of aiding the delivery of the Cambridgeshire Green Infrastructure Strategy.

6.2 INFRASTRUCTURE DELIVERY PLAN
Comment: The SPD should endorse the use of the Natural Cambridgeshire Local Nature Partnership's (LNP) Developing with Nature Toolkit in the design and delivery of multi-functional habitats at Waterbeach.

Support

Waterbeach New Town Supplementary Planning Document

Waterbeach New Town SPD

Representation ID: 167394

Received: 23/10/2018

Respondent: The National Trust

Representation Summary:

4.2 KEY STRUCTURING ELEMENTS (FIXES)
PUBLIC SPACES
Support: Green infrastructure; delivery of high quality multifunctional green spaces and wider connectivity.

Full text:

Please refer to uploaded document.

2.3 ACCESS, MOVEMENT AND CONNECTIVITY
Comment: Comprehensive sustainable movement framework and a potential connection to Cycle Route 11 shown in Figure 6 is noted.

2.6 SURROUNDING CONTEXT
Support: Reference to the Wicken Fen Vision.
Objection: Opportunities have been missed to look beyond the immediate site boundaries and to integrate the site
effectively with the surrounding countryside. The site also has a relationship to rural parts of East Cambridgeshire, located to the
north east of the development.

4.2 KEY STRUCTURING ELEMENTS
Support: Broadly support the proposed approach to Structuring Elements and Guiding Principles.

4.2.3 PRIMARY MOVEMENT ACCESS
Objection: Primary movement and Access: The proposals for cycling and pedestrian movement omit reference to:
- pedestrian and cycle links the north to the north and east, including the Fen Rivers Way;
- and Lodes Way (National Cycle Route 11).
Support: Inclusion of the 'missing link', which would connect Waterbeach to Wicken. The Trust is supportive of this scheme subject to being satisfied that measures are in place to protect ecologically sensitive parts of the Wicken Fen reserve.

4.2.6 PUBLIC SPACES
Support: Green infrastructure; delivery of high quality multifunctional green spaces and wider connectivity.

4.2.10 EDGE TREATMENTS
Comment: Principle 7 Greenways and Corridors should consider specific enhancement opportunities, and articulate a long term vision for enhancing the Fen Edge and Rail corridor.

5.5 GUIDING PRINCIPLES - 20 Create a multifunctional Green Network
Objection: Commitment needed in SPD to this Guiding Principle otherwise SPD is not fully compliant with Local Plan Policy NH4 in terms of aiding the delivery of the Cambridgeshire Green Infrastructure Strategy.

6.2 INFRASTRUCTURE DELIVERY PLAN
Comment: The SPD should endorse the use of the Natural Cambridgeshire Local Nature Partnership's (LNP) Developing with Nature Toolkit in the design and delivery of multi-functional habitats at Waterbeach.

Comment

Waterbeach New Town Supplementary Planning Document

Waterbeach New Town SPD

Representation ID: 167395

Received: 23/10/2018

Respondent: The National Trust

Representation Summary:

4.2 KEY STRUCTURING ELEMENTS (FIXES)
EDGE TREATMENTS
Comment: Principle 7 Greenways and Corridors should consider specific enhancement opportunities, and articulate a long term vision for enhancing the Fen Edge and Rail corridor.

Full text:

Please refer to uploaded document.

2.3 ACCESS, MOVEMENT AND CONNECTIVITY
Comment: Comprehensive sustainable movement framework and a potential connection to Cycle Route 11 shown in Figure 6 is noted.

2.6 SURROUNDING CONTEXT
Support: Reference to the Wicken Fen Vision.
Objection: Opportunities have been missed to look beyond the immediate site boundaries and to integrate the site
effectively with the surrounding countryside. The site also has a relationship to rural parts of East Cambridgeshire, located to the
north east of the development.

4.2 KEY STRUCTURING ELEMENTS
Support: Broadly support the proposed approach to Structuring Elements and Guiding Principles.

4.2.3 PRIMARY MOVEMENT ACCESS
Objection: Primary movement and Access: The proposals for cycling and pedestrian movement omit reference to:
- pedestrian and cycle links the north to the north and east, including the Fen Rivers Way;
- and Lodes Way (National Cycle Route 11).
Support: Inclusion of the 'missing link', which would connect Waterbeach to Wicken. The Trust is supportive of this scheme subject to being satisfied that measures are in place to protect ecologically sensitive parts of the Wicken Fen reserve.

4.2.6 PUBLIC SPACES
Support: Green infrastructure; delivery of high quality multifunctional green spaces and wider connectivity.

4.2.10 EDGE TREATMENTS
Comment: Principle 7 Greenways and Corridors should consider specific enhancement opportunities, and articulate a long term vision for enhancing the Fen Edge and Rail corridor.

5.5 GUIDING PRINCIPLES - 20 Create a multifunctional Green Network
Objection: Commitment needed in SPD to this Guiding Principle otherwise SPD is not fully compliant with Local Plan Policy NH4 in terms of aiding the delivery of the Cambridgeshire Green Infrastructure Strategy.

6.2 INFRASTRUCTURE DELIVERY PLAN
Comment: The SPD should endorse the use of the Natural Cambridgeshire Local Nature Partnership's (LNP) Developing with Nature Toolkit in the design and delivery of multi-functional habitats at Waterbeach.

Object

Waterbeach New Town Supplementary Planning Document

Waterbeach New Town SPD

Representation ID: 167396

Received: 23/10/2018

Respondent: The National Trust

Representation Summary:

5.5 OPEN SPACE, PLAY AND SPORT
Create a multifunctional Green Network
Objection: Commitment needed in SPD to this Guiding Principle otherwise SPD is not fully compliant with Local Plan Policy NH4 in terms of aiding the delivery of the Cambridgeshire Green Infrastructure Strategy.

Full text:

Please refer to uploaded document.

2.3 ACCESS, MOVEMENT AND CONNECTIVITY
Comment: Comprehensive sustainable movement framework and a potential connection to Cycle Route 11 shown in Figure 6 is noted.

2.6 SURROUNDING CONTEXT
Support: Reference to the Wicken Fen Vision.
Objection: Opportunities have been missed to look beyond the immediate site boundaries and to integrate the site
effectively with the surrounding countryside. The site also has a relationship to rural parts of East Cambridgeshire, located to the
north east of the development.

4.2 KEY STRUCTURING ELEMENTS
Support: Broadly support the proposed approach to Structuring Elements and Guiding Principles.

4.2.3 PRIMARY MOVEMENT ACCESS
Objection: Primary movement and Access: The proposals for cycling and pedestrian movement omit reference to:
- pedestrian and cycle links the north to the north and east, including the Fen Rivers Way;
- and Lodes Way (National Cycle Route 11).
Support: Inclusion of the 'missing link', which would connect Waterbeach to Wicken. The Trust is supportive of this scheme subject to being satisfied that measures are in place to protect ecologically sensitive parts of the Wicken Fen reserve.

4.2.6 PUBLIC SPACES
Support: Green infrastructure; delivery of high quality multifunctional green spaces and wider connectivity.

4.2.10 EDGE TREATMENTS
Comment: Principle 7 Greenways and Corridors should consider specific enhancement opportunities, and articulate a long term vision for enhancing the Fen Edge and Rail corridor.

5.5 GUIDING PRINCIPLES - 20 Create a multifunctional Green Network
Objection: Commitment needed in SPD to this Guiding Principle otherwise SPD is not fully compliant with Local Plan Policy NH4 in terms of aiding the delivery of the Cambridgeshire Green Infrastructure Strategy.

6.2 INFRASTRUCTURE DELIVERY PLAN
Comment: The SPD should endorse the use of the Natural Cambridgeshire Local Nature Partnership's (LNP) Developing with Nature Toolkit in the design and delivery of multi-functional habitats at Waterbeach.

Comment

Waterbeach New Town Supplementary Planning Document

Waterbeach New Town SPD

Representation ID: 167397

Received: 23/10/2018

Respondent: The National Trust

Representation Summary:

6.2 INFRASTRUCTURE DELIVERY PLAN
Comment: The SPD should endorse the use of the Natural Cambridgeshire Local Nature Partnership's (LNP) Developing with Nature Toolkit in the design and delivery of multi-functional habitats at Waterbeach.

Full text:

Please refer to uploaded document.

2.3 ACCESS, MOVEMENT AND CONNECTIVITY
Comment: Comprehensive sustainable movement framework and a potential connection to Cycle Route 11 shown in Figure 6 is noted.

2.6 SURROUNDING CONTEXT
Support: Reference to the Wicken Fen Vision.
Objection: Opportunities have been missed to look beyond the immediate site boundaries and to integrate the site
effectively with the surrounding countryside. The site also has a relationship to rural parts of East Cambridgeshire, located to the
north east of the development.

4.2 KEY STRUCTURING ELEMENTS
Support: Broadly support the proposed approach to Structuring Elements and Guiding Principles.

4.2.3 PRIMARY MOVEMENT ACCESS
Objection: Primary movement and Access: The proposals for cycling and pedestrian movement omit reference to:
- pedestrian and cycle links the north to the north and east, including the Fen Rivers Way;
- and Lodes Way (National Cycle Route 11).
Support: Inclusion of the 'missing link', which would connect Waterbeach to Wicken. The Trust is supportive of this scheme subject to being satisfied that measures are in place to protect ecologically sensitive parts of the Wicken Fen reserve.

4.2.6 PUBLIC SPACES
Support: Green infrastructure; delivery of high quality multifunctional green spaces and wider connectivity.

4.2.10 EDGE TREATMENTS
Comment: Principle 7 Greenways and Corridors should consider specific enhancement opportunities, and articulate a long term vision for enhancing the Fen Edge and Rail corridor.

5.5 GUIDING PRINCIPLES - 20 Create a multifunctional Green Network
Objection: Commitment needed in SPD to this Guiding Principle otherwise SPD is not fully compliant with Local Plan Policy NH4 in terms of aiding the delivery of the Cambridgeshire Green Infrastructure Strategy.

6.2 INFRASTRUCTURE DELIVERY PLAN
Comment: The SPD should endorse the use of the Natural Cambridgeshire Local Nature Partnership's (LNP) Developing with Nature Toolkit in the design and delivery of multi-functional habitats at Waterbeach.

For instructions on how to use the system and make comments, please see our help guide.