Waterbeach New Town Supplementary Planning Document
Search representations
Results for The National Trust search
New searchComment
Waterbeach New Town Supplementary Planning Document
Waterbeach New Town SPD
Representation ID: 167286
Received: 23/10/2018
Respondent: The National Trust
2.3 ACCESS, MOVEMENT & CONNECTIVITY
Comment: Comprehensive sustainable movement framework and a potential connection to Cycle Route 11 shown in Figure 6 is noted.
Please refer to uploaded document.
2.3 ACCESS, MOVEMENT AND CONNECTIVITY
Comment: Comprehensive sustainable movement framework and a potential connection to Cycle Route 11 shown in Figure 6 is noted.
2.6 SURROUNDING CONTEXT
Support: Reference to the Wicken Fen Vision.
Objection: Opportunities have been missed to look beyond the immediate site boundaries and to integrate the site
effectively with the surrounding countryside. The site also has a relationship to rural parts of East Cambridgeshire, located to the
north east of the development.
4.2 KEY STRUCTURING ELEMENTS
Support: Broadly support the proposed approach to Structuring Elements and Guiding Principles.
4.2.3 PRIMARY MOVEMENT ACCESS
Objection: Primary movement and Access: The proposals for cycling and pedestrian movement omit reference to:
- pedestrian and cycle links the north to the north and east, including the Fen Rivers Way;
- and Lodes Way (National Cycle Route 11).
Support: Inclusion of the 'missing link', which would connect Waterbeach to Wicken. The Trust is supportive of this scheme subject to being satisfied that measures are in place to protect ecologically sensitive parts of the Wicken Fen reserve.
4.2.6 PUBLIC SPACES
Support: Green infrastructure; delivery of high quality multifunctional green spaces and wider connectivity.
4.2.10 EDGE TREATMENTS
Comment: Principle 7 Greenways and Corridors should consider specific enhancement opportunities, and articulate a long term vision for enhancing the Fen Edge and Rail corridor.
5.5 GUIDING PRINCIPLES - 20 Create a multifunctional Green Network
Objection: Commitment needed in SPD to this Guiding Principle otherwise SPD is not fully compliant with Local Plan Policy NH4 in terms of aiding the delivery of the Cambridgeshire Green Infrastructure Strategy.
6.2 INFRASTRUCTURE DELIVERY PLAN
Comment: The SPD should endorse the use of the Natural Cambridgeshire Local Nature Partnership's (LNP) Developing with Nature Toolkit in the design and delivery of multi-functional habitats at Waterbeach.
Support
Waterbeach New Town Supplementary Planning Document
Waterbeach New Town SPD
Representation ID: 167388
Received: 23/10/2018
Respondent: The National Trust
2.6 SURROUNDING CONTEXT
Support: Reference to the Wicken Fen Vision.
Please refer to uploaded document.
2.3 ACCESS, MOVEMENT AND CONNECTIVITY
Comment: Comprehensive sustainable movement framework and a potential connection to Cycle Route 11 shown in Figure 6 is noted.
2.6 SURROUNDING CONTEXT
Support: Reference to the Wicken Fen Vision.
Objection: Opportunities have been missed to look beyond the immediate site boundaries and to integrate the site
effectively with the surrounding countryside. The site also has a relationship to rural parts of East Cambridgeshire, located to the
north east of the development.
4.2 KEY STRUCTURING ELEMENTS
Support: Broadly support the proposed approach to Structuring Elements and Guiding Principles.
4.2.3 PRIMARY MOVEMENT ACCESS
Objection: Primary movement and Access: The proposals for cycling and pedestrian movement omit reference to:
- pedestrian and cycle links the north to the north and east, including the Fen Rivers Way;
- and Lodes Way (National Cycle Route 11).
Support: Inclusion of the 'missing link', which would connect Waterbeach to Wicken. The Trust is supportive of this scheme subject to being satisfied that measures are in place to protect ecologically sensitive parts of the Wicken Fen reserve.
4.2.6 PUBLIC SPACES
Support: Green infrastructure; delivery of high quality multifunctional green spaces and wider connectivity.
4.2.10 EDGE TREATMENTS
Comment: Principle 7 Greenways and Corridors should consider specific enhancement opportunities, and articulate a long term vision for enhancing the Fen Edge and Rail corridor.
5.5 GUIDING PRINCIPLES - 20 Create a multifunctional Green Network
Objection: Commitment needed in SPD to this Guiding Principle otherwise SPD is not fully compliant with Local Plan Policy NH4 in terms of aiding the delivery of the Cambridgeshire Green Infrastructure Strategy.
6.2 INFRASTRUCTURE DELIVERY PLAN
Comment: The SPD should endorse the use of the Natural Cambridgeshire Local Nature Partnership's (LNP) Developing with Nature Toolkit in the design and delivery of multi-functional habitats at Waterbeach.
Object
Waterbeach New Town Supplementary Planning Document
Waterbeach New Town SPD
Representation ID: 167389
Received: 23/10/2018
Respondent: The National Trust
2.6 SURROUNDING CONTEXT
Objection: Opportunities have been missed to look beyond the immediate site boundaries and to integrate the site effectively with the surrounding countryside. The site also has a relationship to rural parts of East Cambridgeshire, located to the
north east of the development.
Please refer to uploaded document.
2.3 ACCESS, MOVEMENT AND CONNECTIVITY
Comment: Comprehensive sustainable movement framework and a potential connection to Cycle Route 11 shown in Figure 6 is noted.
2.6 SURROUNDING CONTEXT
Support: Reference to the Wicken Fen Vision.
Objection: Opportunities have been missed to look beyond the immediate site boundaries and to integrate the site
effectively with the surrounding countryside. The site also has a relationship to rural parts of East Cambridgeshire, located to the
north east of the development.
4.2 KEY STRUCTURING ELEMENTS
Support: Broadly support the proposed approach to Structuring Elements and Guiding Principles.
4.2.3 PRIMARY MOVEMENT ACCESS
Objection: Primary movement and Access: The proposals for cycling and pedestrian movement omit reference to:
- pedestrian and cycle links the north to the north and east, including the Fen Rivers Way;
- and Lodes Way (National Cycle Route 11).
Support: Inclusion of the 'missing link', which would connect Waterbeach to Wicken. The Trust is supportive of this scheme subject to being satisfied that measures are in place to protect ecologically sensitive parts of the Wicken Fen reserve.
4.2.6 PUBLIC SPACES
Support: Green infrastructure; delivery of high quality multifunctional green spaces and wider connectivity.
4.2.10 EDGE TREATMENTS
Comment: Principle 7 Greenways and Corridors should consider specific enhancement opportunities, and articulate a long term vision for enhancing the Fen Edge and Rail corridor.
5.5 GUIDING PRINCIPLES - 20 Create a multifunctional Green Network
Objection: Commitment needed in SPD to this Guiding Principle otherwise SPD is not fully compliant with Local Plan Policy NH4 in terms of aiding the delivery of the Cambridgeshire Green Infrastructure Strategy.
6.2 INFRASTRUCTURE DELIVERY PLAN
Comment: The SPD should endorse the use of the Natural Cambridgeshire Local Nature Partnership's (LNP) Developing with Nature Toolkit in the design and delivery of multi-functional habitats at Waterbeach.
Support
Waterbeach New Town Supplementary Planning Document
Waterbeach New Town SPD
Representation ID: 167390
Received: 23/10/2018
Respondent: The National Trust
4.2 KEY STRUCTURING ELEMENTS (FIXES)
Support: Broadly support the proposed approach to Structuring Elements and Guiding Principles.
Please refer to uploaded document.
2.3 ACCESS, MOVEMENT AND CONNECTIVITY
Comment: Comprehensive sustainable movement framework and a potential connection to Cycle Route 11 shown in Figure 6 is noted.
2.6 SURROUNDING CONTEXT
Support: Reference to the Wicken Fen Vision.
Objection: Opportunities have been missed to look beyond the immediate site boundaries and to integrate the site
effectively with the surrounding countryside. The site also has a relationship to rural parts of East Cambridgeshire, located to the
north east of the development.
4.2 KEY STRUCTURING ELEMENTS
Support: Broadly support the proposed approach to Structuring Elements and Guiding Principles.
4.2.3 PRIMARY MOVEMENT ACCESS
Objection: Primary movement and Access: The proposals for cycling and pedestrian movement omit reference to:
- pedestrian and cycle links the north to the north and east, including the Fen Rivers Way;
- and Lodes Way (National Cycle Route 11).
Support: Inclusion of the 'missing link', which would connect Waterbeach to Wicken. The Trust is supportive of this scheme subject to being satisfied that measures are in place to protect ecologically sensitive parts of the Wicken Fen reserve.
4.2.6 PUBLIC SPACES
Support: Green infrastructure; delivery of high quality multifunctional green spaces and wider connectivity.
4.2.10 EDGE TREATMENTS
Comment: Principle 7 Greenways and Corridors should consider specific enhancement opportunities, and articulate a long term vision for enhancing the Fen Edge and Rail corridor.
5.5 GUIDING PRINCIPLES - 20 Create a multifunctional Green Network
Objection: Commitment needed in SPD to this Guiding Principle otherwise SPD is not fully compliant with Local Plan Policy NH4 in terms of aiding the delivery of the Cambridgeshire Green Infrastructure Strategy.
6.2 INFRASTRUCTURE DELIVERY PLAN
Comment: The SPD should endorse the use of the Natural Cambridgeshire Local Nature Partnership's (LNP) Developing with Nature Toolkit in the design and delivery of multi-functional habitats at Waterbeach.
Object
Waterbeach New Town Supplementary Planning Document
Waterbeach New Town SPD
Representation ID: 167391
Received: 23/10/2018
Respondent: The National Trust
4.2 KEY STRUCTURING ELEMENTS (FIXES)
PRIMARY MOVEMENT AND ACCESS
Objection: Primary movement and Access: The proposals for cycling and pedestrian movement omit reference to:
- pedestrian and cycle links the north to the north and east, including the Fen Rivers Way;
- and Lodes Way (National Cycle Route 11).
Please refer to uploaded document.
2.3 ACCESS, MOVEMENT AND CONNECTIVITY
Comment: Comprehensive sustainable movement framework and a potential connection to Cycle Route 11 shown in Figure 6 is noted.
2.6 SURROUNDING CONTEXT
Support: Reference to the Wicken Fen Vision.
Objection: Opportunities have been missed to look beyond the immediate site boundaries and to integrate the site
effectively with the surrounding countryside. The site also has a relationship to rural parts of East Cambridgeshire, located to the
north east of the development.
4.2 KEY STRUCTURING ELEMENTS
Support: Broadly support the proposed approach to Structuring Elements and Guiding Principles.
4.2.3 PRIMARY MOVEMENT ACCESS
Objection: Primary movement and Access: The proposals for cycling and pedestrian movement omit reference to:
- pedestrian and cycle links the north to the north and east, including the Fen Rivers Way;
- and Lodes Way (National Cycle Route 11).
Support: Inclusion of the 'missing link', which would connect Waterbeach to Wicken. The Trust is supportive of this scheme subject to being satisfied that measures are in place to protect ecologically sensitive parts of the Wicken Fen reserve.
4.2.6 PUBLIC SPACES
Support: Green infrastructure; delivery of high quality multifunctional green spaces and wider connectivity.
4.2.10 EDGE TREATMENTS
Comment: Principle 7 Greenways and Corridors should consider specific enhancement opportunities, and articulate a long term vision for enhancing the Fen Edge and Rail corridor.
5.5 GUIDING PRINCIPLES - 20 Create a multifunctional Green Network
Objection: Commitment needed in SPD to this Guiding Principle otherwise SPD is not fully compliant with Local Plan Policy NH4 in terms of aiding the delivery of the Cambridgeshire Green Infrastructure Strategy.
6.2 INFRASTRUCTURE DELIVERY PLAN
Comment: The SPD should endorse the use of the Natural Cambridgeshire Local Nature Partnership's (LNP) Developing with Nature Toolkit in the design and delivery of multi-functional habitats at Waterbeach.
Support
Waterbeach New Town Supplementary Planning Document
Waterbeach New Town SPD
Representation ID: 167393
Received: 23/10/2018
Respondent: The National Trust
4.2 KEY STRUCTURING ELEMENTS (FIXES)
PRIMARY MOVEMENT AND ACCESS
Support: Inclusion of the 'missing link', which would connect Waterbeach to Wicken. The Trust is supportive of this scheme subject to being satisfied that measures are in place to protect ecologically sensitive parts of the Wicken Fen reserve.
Please refer to uploaded document.
2.3 ACCESS, MOVEMENT AND CONNECTIVITY
Comment: Comprehensive sustainable movement framework and a potential connection to Cycle Route 11 shown in Figure 6 is noted.
2.6 SURROUNDING CONTEXT
Support: Reference to the Wicken Fen Vision.
Objection: Opportunities have been missed to look beyond the immediate site boundaries and to integrate the site
effectively with the surrounding countryside. The site also has a relationship to rural parts of East Cambridgeshire, located to the
north east of the development.
4.2 KEY STRUCTURING ELEMENTS
Support: Broadly support the proposed approach to Structuring Elements and Guiding Principles.
4.2.3 PRIMARY MOVEMENT ACCESS
Objection: Primary movement and Access: The proposals for cycling and pedestrian movement omit reference to:
- pedestrian and cycle links the north to the north and east, including the Fen Rivers Way;
- and Lodes Way (National Cycle Route 11).
Support: Inclusion of the 'missing link', which would connect Waterbeach to Wicken. The Trust is supportive of this scheme subject to being satisfied that measures are in place to protect ecologically sensitive parts of the Wicken Fen reserve.
4.2.6 PUBLIC SPACES
Support: Green infrastructure; delivery of high quality multifunctional green spaces and wider connectivity.
4.2.10 EDGE TREATMENTS
Comment: Principle 7 Greenways and Corridors should consider specific enhancement opportunities, and articulate a long term vision for enhancing the Fen Edge and Rail corridor.
5.5 GUIDING PRINCIPLES - 20 Create a multifunctional Green Network
Objection: Commitment needed in SPD to this Guiding Principle otherwise SPD is not fully compliant with Local Plan Policy NH4 in terms of aiding the delivery of the Cambridgeshire Green Infrastructure Strategy.
6.2 INFRASTRUCTURE DELIVERY PLAN
Comment: The SPD should endorse the use of the Natural Cambridgeshire Local Nature Partnership's (LNP) Developing with Nature Toolkit in the design and delivery of multi-functional habitats at Waterbeach.
Support
Waterbeach New Town Supplementary Planning Document
Waterbeach New Town SPD
Representation ID: 167394
Received: 23/10/2018
Respondent: The National Trust
4.2 KEY STRUCTURING ELEMENTS (FIXES)
PUBLIC SPACES
Support: Green infrastructure; delivery of high quality multifunctional green spaces and wider connectivity.
Please refer to uploaded document.
2.3 ACCESS, MOVEMENT AND CONNECTIVITY
Comment: Comprehensive sustainable movement framework and a potential connection to Cycle Route 11 shown in Figure 6 is noted.
2.6 SURROUNDING CONTEXT
Support: Reference to the Wicken Fen Vision.
Objection: Opportunities have been missed to look beyond the immediate site boundaries and to integrate the site
effectively with the surrounding countryside. The site also has a relationship to rural parts of East Cambridgeshire, located to the
north east of the development.
4.2 KEY STRUCTURING ELEMENTS
Support: Broadly support the proposed approach to Structuring Elements and Guiding Principles.
4.2.3 PRIMARY MOVEMENT ACCESS
Objection: Primary movement and Access: The proposals for cycling and pedestrian movement omit reference to:
- pedestrian and cycle links the north to the north and east, including the Fen Rivers Way;
- and Lodes Way (National Cycle Route 11).
Support: Inclusion of the 'missing link', which would connect Waterbeach to Wicken. The Trust is supportive of this scheme subject to being satisfied that measures are in place to protect ecologically sensitive parts of the Wicken Fen reserve.
4.2.6 PUBLIC SPACES
Support: Green infrastructure; delivery of high quality multifunctional green spaces and wider connectivity.
4.2.10 EDGE TREATMENTS
Comment: Principle 7 Greenways and Corridors should consider specific enhancement opportunities, and articulate a long term vision for enhancing the Fen Edge and Rail corridor.
5.5 GUIDING PRINCIPLES - 20 Create a multifunctional Green Network
Objection: Commitment needed in SPD to this Guiding Principle otherwise SPD is not fully compliant with Local Plan Policy NH4 in terms of aiding the delivery of the Cambridgeshire Green Infrastructure Strategy.
6.2 INFRASTRUCTURE DELIVERY PLAN
Comment: The SPD should endorse the use of the Natural Cambridgeshire Local Nature Partnership's (LNP) Developing with Nature Toolkit in the design and delivery of multi-functional habitats at Waterbeach.
Comment
Waterbeach New Town Supplementary Planning Document
Waterbeach New Town SPD
Representation ID: 167395
Received: 23/10/2018
Respondent: The National Trust
4.2 KEY STRUCTURING ELEMENTS (FIXES)
EDGE TREATMENTS
Comment: Principle 7 Greenways and Corridors should consider specific enhancement opportunities, and articulate a long term vision for enhancing the Fen Edge and Rail corridor.
Please refer to uploaded document.
2.3 ACCESS, MOVEMENT AND CONNECTIVITY
Comment: Comprehensive sustainable movement framework and a potential connection to Cycle Route 11 shown in Figure 6 is noted.
2.6 SURROUNDING CONTEXT
Support: Reference to the Wicken Fen Vision.
Objection: Opportunities have been missed to look beyond the immediate site boundaries and to integrate the site
effectively with the surrounding countryside. The site also has a relationship to rural parts of East Cambridgeshire, located to the
north east of the development.
4.2 KEY STRUCTURING ELEMENTS
Support: Broadly support the proposed approach to Structuring Elements and Guiding Principles.
4.2.3 PRIMARY MOVEMENT ACCESS
Objection: Primary movement and Access: The proposals for cycling and pedestrian movement omit reference to:
- pedestrian and cycle links the north to the north and east, including the Fen Rivers Way;
- and Lodes Way (National Cycle Route 11).
Support: Inclusion of the 'missing link', which would connect Waterbeach to Wicken. The Trust is supportive of this scheme subject to being satisfied that measures are in place to protect ecologically sensitive parts of the Wicken Fen reserve.
4.2.6 PUBLIC SPACES
Support: Green infrastructure; delivery of high quality multifunctional green spaces and wider connectivity.
4.2.10 EDGE TREATMENTS
Comment: Principle 7 Greenways and Corridors should consider specific enhancement opportunities, and articulate a long term vision for enhancing the Fen Edge and Rail corridor.
5.5 GUIDING PRINCIPLES - 20 Create a multifunctional Green Network
Objection: Commitment needed in SPD to this Guiding Principle otherwise SPD is not fully compliant with Local Plan Policy NH4 in terms of aiding the delivery of the Cambridgeshire Green Infrastructure Strategy.
6.2 INFRASTRUCTURE DELIVERY PLAN
Comment: The SPD should endorse the use of the Natural Cambridgeshire Local Nature Partnership's (LNP) Developing with Nature Toolkit in the design and delivery of multi-functional habitats at Waterbeach.
Object
Waterbeach New Town Supplementary Planning Document
Waterbeach New Town SPD
Representation ID: 167396
Received: 23/10/2018
Respondent: The National Trust
5.5 OPEN SPACE, PLAY AND SPORT
Create a multifunctional Green Network
Objection: Commitment needed in SPD to this Guiding Principle otherwise SPD is not fully compliant with Local Plan Policy NH4 in terms of aiding the delivery of the Cambridgeshire Green Infrastructure Strategy.
Please refer to uploaded document.
2.3 ACCESS, MOVEMENT AND CONNECTIVITY
Comment: Comprehensive sustainable movement framework and a potential connection to Cycle Route 11 shown in Figure 6 is noted.
2.6 SURROUNDING CONTEXT
Support: Reference to the Wicken Fen Vision.
Objection: Opportunities have been missed to look beyond the immediate site boundaries and to integrate the site
effectively with the surrounding countryside. The site also has a relationship to rural parts of East Cambridgeshire, located to the
north east of the development.
4.2 KEY STRUCTURING ELEMENTS
Support: Broadly support the proposed approach to Structuring Elements and Guiding Principles.
4.2.3 PRIMARY MOVEMENT ACCESS
Objection: Primary movement and Access: The proposals for cycling and pedestrian movement omit reference to:
- pedestrian and cycle links the north to the north and east, including the Fen Rivers Way;
- and Lodes Way (National Cycle Route 11).
Support: Inclusion of the 'missing link', which would connect Waterbeach to Wicken. The Trust is supportive of this scheme subject to being satisfied that measures are in place to protect ecologically sensitive parts of the Wicken Fen reserve.
4.2.6 PUBLIC SPACES
Support: Green infrastructure; delivery of high quality multifunctional green spaces and wider connectivity.
4.2.10 EDGE TREATMENTS
Comment: Principle 7 Greenways and Corridors should consider specific enhancement opportunities, and articulate a long term vision for enhancing the Fen Edge and Rail corridor.
5.5 GUIDING PRINCIPLES - 20 Create a multifunctional Green Network
Objection: Commitment needed in SPD to this Guiding Principle otherwise SPD is not fully compliant with Local Plan Policy NH4 in terms of aiding the delivery of the Cambridgeshire Green Infrastructure Strategy.
6.2 INFRASTRUCTURE DELIVERY PLAN
Comment: The SPD should endorse the use of the Natural Cambridgeshire Local Nature Partnership's (LNP) Developing with Nature Toolkit in the design and delivery of multi-functional habitats at Waterbeach.
Comment
Waterbeach New Town Supplementary Planning Document
Waterbeach New Town SPD
Representation ID: 167397
Received: 23/10/2018
Respondent: The National Trust
6.2 INFRASTRUCTURE DELIVERY PLAN
Comment: The SPD should endorse the use of the Natural Cambridgeshire Local Nature Partnership's (LNP) Developing with Nature Toolkit in the design and delivery of multi-functional habitats at Waterbeach.
Please refer to uploaded document.
2.3 ACCESS, MOVEMENT AND CONNECTIVITY
Comment: Comprehensive sustainable movement framework and a potential connection to Cycle Route 11 shown in Figure 6 is noted.
2.6 SURROUNDING CONTEXT
Support: Reference to the Wicken Fen Vision.
Objection: Opportunities have been missed to look beyond the immediate site boundaries and to integrate the site
effectively with the surrounding countryside. The site also has a relationship to rural parts of East Cambridgeshire, located to the
north east of the development.
4.2 KEY STRUCTURING ELEMENTS
Support: Broadly support the proposed approach to Structuring Elements and Guiding Principles.
4.2.3 PRIMARY MOVEMENT ACCESS
Objection: Primary movement and Access: The proposals for cycling and pedestrian movement omit reference to:
- pedestrian and cycle links the north to the north and east, including the Fen Rivers Way;
- and Lodes Way (National Cycle Route 11).
Support: Inclusion of the 'missing link', which would connect Waterbeach to Wicken. The Trust is supportive of this scheme subject to being satisfied that measures are in place to protect ecologically sensitive parts of the Wicken Fen reserve.
4.2.6 PUBLIC SPACES
Support: Green infrastructure; delivery of high quality multifunctional green spaces and wider connectivity.
4.2.10 EDGE TREATMENTS
Comment: Principle 7 Greenways and Corridors should consider specific enhancement opportunities, and articulate a long term vision for enhancing the Fen Edge and Rail corridor.
5.5 GUIDING PRINCIPLES - 20 Create a multifunctional Green Network
Objection: Commitment needed in SPD to this Guiding Principle otherwise SPD is not fully compliant with Local Plan Policy NH4 in terms of aiding the delivery of the Cambridgeshire Green Infrastructure Strategy.
6.2 INFRASTRUCTURE DELIVERY PLAN
Comment: The SPD should endorse the use of the Natural Cambridgeshire Local Nature Partnership's (LNP) Developing with Nature Toolkit in the design and delivery of multi-functional habitats at Waterbeach.