Representation ID: 168403
Received: 14/10/2019
Respondent: Middle Level Commissioners
It must be understood that whilst a planning application may be acceptable to your Council it also needs to be appropriate to other parties if the development is to be delivered and developed with the minimum of delay yet maximising our respective limited resources. Decision makers, including your Council, need to be held more accountable for their involvement in the water level management, surface water disposal and flood risk elements of a development. The inappropriate raising of a developer's expectations and chasing LPA housing numbers is considered to be the start of poor solutions which, if not considered and acknowledged at an early stage, could increase flood risk.
The Board is no longer prepared to resolve, at its expense, problems created by others.
It must be appreciated that water level and flood risk management goes beyond a site being within the indicative floodplain. Therefore, landowners, house builders, developers, agents and the Council need to fully consider and act upon this.
Comment
Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document
5. Conclusions
Representation ID: 168404
Received: 14/10/2019
Respondent: Middle Level Commissioners
It is reassuring that a 5-year plan has been achieved as this will minimise the number of speculative sites and thus reduce the amount of abortive works and hence costs on our respective ratepayers.
Comment
Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document
Appendix B: Assessment of Sites included in the Greater Cambridge Housing Trajectory - Allocations at New Settlements
Representation ID: 168405
Received: 14/10/2019
Respondent: Middle Level Commissioners
Northstowe - Phase 3 and later phases
It is noted that no dwellings have been included until after 2033.
Several issues remain outstanding concerning this development and the detrimental effect on the downstream water level management systems which if unresolved will increase the risk of flooding in the area. The Board consider it appropriate that its requirements are met before work commences on site.
Discussions have commenced with the applicant's engineering consultant but meaningful proposals have yet to be received.
Comment
Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document
Appendix B: Assessment of Sites included in the Greater Cambridge Housing Trajectory - Unallocated Sites with Planning Permission
Representation ID: 168406
Received: 14/10/2019
Respondent: Middle Level Commissioners
Land rear of Cygnus Business Park, Swavesey
It is understood that three dwellings remain to be built within the next year.
Please note that Discharge Consent, as required under the Board's Byelaws, has not been sought for the existing development which is, therefore, illegal.
Comment
Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document
Appendix B: Assessment of Sites included in the Greater Cambridge Housing Trajectory - Unallocated Sites with Planning Permission
Representation ID: 168407
Received: 14/10/2019
Respondent: Middle Level Commissioners
18 Boxworth End, Swavesey
It is noted that this development will be constructed during 2021/22.
This development will require the provision of infrastructure possibly including a telemetry system to control the discharge into the adjacent Award Drain. The Board considers it appropriate that its requirements are met before work commences on site.
Whilst some initial discussion has occurred the developer has not yet provided any meaningful proposals or sought the Board's approval.
Comment
Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document
Appendix B: Assessment of Sites included in the Greater Cambridge Housing Trajectory - Unallocated Sites with Planning Permission
Representation ID: 168408
Received: 14/10/2019
Respondent: Middle Level Commissioners
Land rear of 130 Middlewatch, Swavesey
It is noted that this development will be constructed during 2021/23.
This development will require the provision of infrastructure possibly including a telemetry system to control the discharge into the adjacent Award Drain. The Board considers it appropriate that its requirements are met before work commences on site.
Whilst a meeting has been held with the developer's consultant and discussion has occurred, the developer has not yet provided any meaningful proposals or sought the Board's approval.
Comment
Greater Cambridge Housing Trajectory and Five Year Housing Land Supply - Main Document
Appendix B: Assessment of Sites included in the Greater Cambridge Housing Trajectory - Unallocated Sites with Planning Permission
Representation ID: 168409
Received: 14/10/2019
Respondent: Middle Level Commissioners
Land south of Fen Drayton Road, Swavesey
It is noted that this development will be constructed during 2020/23.
This development will require the provision of infrastructure possibly including a telemetry system to control the discharge into the adjacent Flood Risk Management System. The Board considers it appropriate that its requirements are met before work commences on site.
Whilst a meeting has been held with the developer's consultant and discussion has occurred the developer has not yet provided any meaningful proposals or sought the Board's approval.