Greater Cambridge Local Plan Preferred Options

Search representations

Results for Campaign to Protect Rural England (CPRE) search

New search New search

Comment

Greater Cambridge Local Plan Preferred Options

STRATEGY

Representation ID: 59540

Received: 13/12/2021

Respondent: Campaign to Protect Rural England (CPRE)

Representation Summary:

Consultation Process
Concerned regarding focus on electronic responses, limited deposit points, and complexity of documents.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

STRATEGY

Representation ID: 59545

Received: 13/12/2021

Respondent: Campaign to Protect Rural England (CPRE)

Representation Summary:

Timing of the Consultation
There are several questionable issues of timing associated with this consultation. This includes timing in relation to GCP consultations, the Local Transport & Connectivity Plan, and the Water Resources East plan, the and the relationship with the Ox Cam arc.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

S/DS: Development strategy

Representation ID: 59548

Received: 13/12/2021

Respondent: Campaign to Protect Rural England (CPRE)

Representation Summary:

Vision is not matched by the development strategy.
Entire strategy is predicated on growth of both
population and employment. It is not consistent with the
government’s Levelling Up agenda.
The level of housing and business development proposed will cause
significant increases in both embedded carbon due to construction and emitted carbon due to the increased population living in the area and the additional infrastructure needed to support them. A vision
which sought to spread Cambridge expertise to other areas of the country, which could benefit from
refurbishment and redevelopment, would be far more forward-looking socially and climatically.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

S/NEC: North east Cambridge

Representation ID: 59551

Received: 13/12/2021

Respondent: Campaign to Protect Rural England (CPRE)

Representation Summary:

CPRE considers that some of the regeneration proposed within the Cambridge urban area, for example the
Travis Perkins site, is welcome. However, there are other proposals which seem badly thought out and not
in the best interest of the city or its residents. CPRE are most concerned about the nature and scale of the North East Cambridge proposals. Also concerned that the area around Shire Hall and in particular the Castle Mound, with its view of Ely Cathedral on a clear day, will not be damaged by the type of unsympathetic development.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

S/CE: Cambridge east

Representation ID: 59553

Received: 13/12/2021

Respondent: Campaign to Protect Rural England (CPRE)

Representation Summary:

Cambridge East is predicated on closure of Cambridge Airport. The airport area is one of, if not the largest employers in Cambridge. Where will these skilled engineering staff find employment?
Additionally, if Cambridge is to be such a significant centre of international business, why would it not need
its own airport, providing flights to national and international hub destinations?

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

S/NWC: North west Cambridge

Representation ID: 59554

Received: 13/12/2021

Respondent: Campaign to Protect Rural England (CPRE)

Representation Summary:

Further development in North West Cambridge will cause development to completely dominate this green
space between Huntingdon Road and the M11. This green space is important for the existing residents and
to the character of the area. Further major development in this area polluted by the M11 and A14 and
their major intersection is unwise.
With respect to Policy S/WC: West Cambridge, this area is already well developed and further infill within
the outlined boundary is sensible. However, CPRE is concerned to ensure there will be no further spread
south onto the green fields between Cambridge and the M11.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

S/CBC: Cambridge Biomedical Campus (including Addenbrooke's Hospital)

Representation ID: 59555

Received: 13/12/2021

Respondent: Campaign to Protect Rural England (CPRE)

Representation Summary:

Objects strongly to the release of further Greenbelt land, identified as the area S/CBC-A. The existing allocation of land around the Addenbrokes site has not been built out. There is indication that since BREXIT and the
move of the European Medicines Agency from London to Amsterdam, there will be less interest by major
pharmaceutical companies in moving to anywhere in the UK including Cambridge. CPRE agrees with the findings of the Greater Cambridge Green Belt Study (2021) which identifies that release of the areas proposed would result in very high harm to the Green Belt and that there are concerns regarding biodiversity and landscape impacts from the scale of development proposed by the Campus.
CPRE also objects to the apparent attempt to turn the “Proposed Area of Major Change” into some kind of
greenwashed country park as compensation.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

S/EOC: Other existing allocations on the edge of Cambridge

Representation ID: 59556

Received: 13/12/2021

Respondent: Campaign to Protect Rural England (CPRE)

Representation Summary:

CPRE are concerned by the retention of the two allocations between Huntingdon Road and Histon Road
(Darwin Green). These are significant areas of green space on the northern edge of the city which help
retain the character of the city’s integration with its rural surroundings.
CPRE are concerned by proposed further development along Fulbourn Road on highly productive farm land at S/EOC/E/3: Fulbourn Road East, even though this is a retained policy.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

S/CB: Cambourne

Representation ID: 59558

Received: 13/12/2021

Respondent: Campaign to Protect Rural England (CPRE)

Representation Summary:

CPRE objects strongly to Policy S/CB: Cambourne and the proposed further expansion of Cambourne West.
This is an object lesson in how urban sprawl occurs when there are no insurmountable natural barriers to
stop it. Cambourne was designed as a discrete ‘village’ development to take up overflow from Cambridge
in order that the City’s character could be retained. This policy will take up further productive farm land
and will lead to a never-ending cycle of demand for additional development. Our concern is that in the
longer term, the extension of Cambourne and proposed and current developments around St Neots
towards Bedford along the A428/A421 main route will generate further pressure for development until
Cambridge is joined to Bedford in one long urban sprawl.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

S/NS: Existing new settlements

Representation ID: 59559

Received: 13/12/2021

Respondent: Campaign to Protect Rural England (CPRE)

Representation Summary:

CPRE understands Policy S/NS to carry forward the existing allocations for new settlements Northstowe,
Waterbeach and Bourn Airfield. However, CPRE is very concerned indeed by the poor building control, lack
of democratic control of detailed planning decisions, the damage to underground water bodies, increasing
flood risk, lack of engagement with local communities and lack of engagement with local expert and
statutory bodies such as the local Internal Drainage Boards which is occurring as development proceeds at
two of these sites, Northstowe and Waterbeach. This approach to planning is going to lead to disaster for
the planning authorities, for residents and for the custodians of the water resources. Before, any further
permissions are given within these allocations, CPRE considers it absolutely essential that these issues are
addressed and any problems resolved.

Attachments:

For instructions on how to use the system and make comments, please see our help guide.