Greater Cambridge Local Plan Preferred Options

Search representations

Results for Southern & Regional Developments Ltd search

New search New search

Comment

Greater Cambridge Local Plan Preferred Options

STRATEGY

Representation ID: 57147

Received: 10/12/2021

Respondent: Southern & Regional Developments Ltd

Agent: Claremont Planning Consultancy

Representation Summary:

The delivery of environmental objectives should not be to the detriment of other elements of sustainable development. In respect of new homes and development of existing communities, it is vital that the new Plan includes sufficient land and sites to meet Greater Cambridge’s needs including housing that is affordable to rent and buy. This will require sites to be identified in the rural areas as well as Cambridge City and ensure that the plan positively addresses the needs of every community in Greater Cambridge.

Comment

Greater Cambridge Local Plan Preferred Options

How much development and where?

Representation ID: 57148

Received: 10/12/2021

Respondent: Southern & Regional Developments Ltd

Agent: Claremont Planning Consultancy

Representation Summary:

It is essential for the Plan to provide more supply into the local housing market area, at appropriate locations that meet the needs of the new employees and in-migration residents. The most effective way for the Council’s development strategy to respond to these influences is through a substantial increase in housing provision, which is recommended to be at least 15% above that currently proposed. The correlation between economic growth and housing provision must be recognised for the strategy to be effective, positively prepared and aspirational.

Comment

Greater Cambridge Local Plan Preferred Options

S/JH: New jobs and homes

Representation ID: 57149

Received: 10/12/2021

Respondent: Southern & Regional Developments Ltd

Agent: Claremont Planning Consultancy

Representation Summary:

Policy S/JH should adequately address the housing and employment requirements for the plan area. Greater Cambridge should reconsider planning for a higher quantum of housing.

Comment

Greater Cambridge Local Plan Preferred Options

S/DS: Development strategy

Representation ID: 57150

Received: 10/12/2021

Respondent: Southern & Regional Developments Ltd

Agent: Claremont Planning Consultancy

Representation Summary:

Summary: Land at Bannold Road Waterbeach (HELAA site 40466); Land off Kingfisher Way, Cottenham (HELAA site 40472); Land to the north of Cottenham (HELAA site 59386); Land at Boxworth End Swavesey (HELAA site 40506); and Land at Priest Lane, Willingham (HELAA site 40468)

Policy S/JH should ensure that housing is provided across the settlement hierarchies; so in larger settlements as well as smaller rural communities to ensure that the policy meets the objectives of supporting and promoting the provision of balanced and mixed communities. The current strategic approach to accommodating development is not considered to be in accordance with the principles outlined in the National Planning Policy Framework.

Comment

Greater Cambridge Local Plan Preferred Options

S/SH: Settlement hierarchy

Representation ID: 57151

Received: 10/12/2021

Respondent: Southern & Regional Developments Ltd

Agent: Claremont Planning Consultancy

Representation Summary:

Objection is raised to the proposed changes to the settlement hierarchy as set out in the emerging Policy S/SH. Waterbeach is identified as a ‘Minor Rural Centre’ this is now considered an inappropriate category for a settlement that has experienced such large growth to the north. This is particularly pertinent given the sustainable pedestrian and green links from the settlement to the new town and the linked trips associated with the facilities and services between the two areas. Objection is also raised to the re-categorisation of Cottenham from a ‘Rural Centre’ to a ‘Minor Rural Centre’.

Comment

Greater Cambridge Local Plan Preferred Options

S/SB: Settlement boundaries

Representation ID: 57152

Received: 10/12/2021

Respondent: Southern & Regional Developments Ltd

Agent: Claremont Planning Consultancy

Representation Summary:

It will be important to ensure that the Settlement Boundaries are not drawn too tightly around the built-up areas of settlements, as this could result in an inflexible approach to delivering housing sites. The Local Plan should provide a more flexible approach to housing delivery to ensure that a mix of development scales are provided for. This will help to sustain the delivery of homes if some of the larger sites allocated in the plan do not meet the housing delivery expectations then additional sites should be allowed to come forward for development

Comment

Greater Cambridge Local Plan Preferred Options

The city of Cambridge

Representation ID: 57154

Received: 10/12/2021

Respondent: Southern & Regional Developments Ltd

Agent: Claremont Planning Consultancy

Representation Summary:

Whilst it is recognised that locating development within the Cambridge urban area is a sustainable development option, it is considered that too much emphasis is placed on this as a location within the emerging Local Plan. This focus of providing larger sites in this location could lead to problems associated with infrastructure provision and housing delivery. There needs to be a better balance with more housing being apportioned to the rural area.

Comment

Greater Cambridge Local Plan Preferred Options

S/NEC: North east Cambridge

Representation ID: 57155

Received: 10/12/2021

Respondent: Southern & Regional Developments Ltd

Agent: Claremont Planning Consultancy

Representation Summary:

Greater Cambridge is reliant on 8,350 new homes being provided at North-East Cambridge under Policy S/NEC. This is a significant level of housing to be provided on a brownfield site, part of which is contaminated and comprises a sewage works. There are likely to be significant costs associated with remediating the site and potential time delays on bringing development forward on the site. It is considered that the Council should look at providing more of a range of smaller and medium sites that have the ability to come forward at a faster rate than strategic sites of this size.

Comment

Greater Cambridge Local Plan Preferred Options

S/LAC: Land allocations in Cambridge

Representation ID: 57156

Received: 10/12/2021

Respondent: Southern & Regional Developments Ltd

Agent: Claremont Planning Consultancy

Representation Summary:

The housing and mixed-use allocations that are being proposed to be carried forward from the Cambridge Local Plan 2018 and the South Cambridgeshire Local Plan 2018 should be reviewed and not automatically carried forward through this emerging plan. Where site allocations have been granted consent since the Local Plans were adopted, these allocations should not be repeated and instead the sites integrated within the urban area. On such occasions the emerging plan should seek to add to the allocations proposed and replace those sites from the 2018 Plans that have been delivered/ implemented.

Comment

Greater Cambridge Local Plan Preferred Options

The edge of Cambridge

Representation ID: 57157

Received: 10/12/2021

Respondent: Southern & Regional Developments Ltd

Agent: Claremont Planning Consultancy

Representation Summary:

Whilst it is recognised that locating development on the edge of Cambridge is a sustainable development option it is considered that too much emphasis is placed on this as a location within the emerging Local Plan. This focus of providing larger sites in this location could lead to problems associated with infrastructure provision and housing delivery. There needs to be a better balance with more housing being apportioned to the rural area.

For instructions on how to use the system and make comments, please see our help guide.