Greater Cambridge Local Plan Preferred Options

Search representations

Results for Guilden Morden Parish Council search

New search New search

Comment

Greater Cambridge Local Plan Preferred Options

H/ES: Exception sites for affordable housing

Representation ID: 60096

Received: 12/12/2021

Respondent: Guilden Morden Parish Council

Representation Summary:

Support but all types of sites should retain local connection and permanence criteria

Full text:

Firstly, the Form To Assist gives a comment column for Vision and Aims.
We have numerous comments to make under this heading but I have not been able to locate this on the online system.
Secondly, the online system asks "Did you raise the matter that is the subject of your representation with the LPA earlier in the process?"
Guilden Morden Parish Council have not been involved earlier in the process. I have therefore clicked "No" but the system will not allow me to proceed further.
The online system allows only 100 words for each comment and to summarise the comments to avoid exceeding 100 words. It would have been helpful if the Form To Assist had stated that.
Vision and development strategy
Section / Policy Your comments
Vision and aims 1.Guilden MordenParish Council has concerns that the increase in population resulting from the additional homes target of 44,000 will have a negative impact on an already struggling traffic, school and healthcare infrastructure.
Specifically on traffic and congestion:
Commuting into and out of Cambridge at peak times already attracts significant congestion and delay for commuters.
This not only effects commuting by car but also bus and the Park&Ride buses as these typically use the same roads as the other commuters and the bus lane network doesn’t extend to where it’s needed.
Links between the train stations and the city centre are also currently inadequate and equally effected by commuter congestion.
The guided busway is too infrequent to be a viable alternative and typically the Park& Ride parking is at capacity leaving commuters with little alternative other than to drive into the city centre.
All of the above describes the current situation which will clearly be significantly worsened by the addition of 44,000 homes by 2041.
2. Is the methodology used in arriving at the figure of 44,000 defendable?

How much development, and where – general comments Support that the proposed developments are to be in major clusters in areas with good public transport.
S/JH: New jobs and homes
S/DS: Development strategy Support to the extent that development should be very restricted in smaller rural villages with limited public transport.
S/SH: Settlement hierarchy Support. Guilden Morden is a group village and should remain in this category. It is well down the sustainability hierarchy.
S/SB: Settlement boundaries Support. Tightly drawn development boundaries are important to reduce encroachment into the countryside.

Cambridge urban area
Policy Your comments
Cambridge urban area - general comments
S/NEC: North East Cambridge
S/AMC: Areas of Major Change
S/OA: Opportunity Areas in Cambridge
S/LAC: Land allocations in Cambridge

Edge of Cambridge
Policy Your comments
Edge of Cambridge - general comments
S/CE: Cambridge East
S/NWC: North West Cambridge
S/CBC: Cambridge Biomedical Campus
S/WC: West Cambridge
S/EOC: Other existing allocations on the edge of Cambridge

New settlements
Policy Your comments
New settlements - general comments
S/CB: Cambourne
S/NS: Existing new settlements

Rural southern cluster
Policy Your comments
Rural southern cluster - general comments
S/GC: Genome Campus, Hinxton
S/BRC: Babraham Research Campus
S/RSC: Village allocations in the rural southern cluster
S/SCP: Policy areas in the rural southern cluster

Rest of the rural area
Policy Your comments
Rest of the rural area - general comments
S/RRA: Allocations in the rest of the rural area
S/RRP: Policy areas in the rest of the rural area

Climate change
Policy Your comments
Climate change - general comments Future development and trends will increase the use of electricity. Where might this be generated locally by solar and/or wind?
CC/NZ: Net zero carbon new buildings Support
CC/WE: Water efficiency in new developments Absolutely necessary
CC/DC: Designing for a changing climate
CC/FM: Flooding and integrated water management Infrastructure should be operational before housing occupation
CC/RE: Renewable energy projects and infrastructure Support for community led projects but should include access to funding
CC/CE: Reducing waste and supporting the circular economy
CC/CS: Supporting land based carbon sequestration

Biodiversity and green spaces
Policy Your comments
Biodiversity and green spaces - general comments
BG/BG: Biodiversity and geodiversity Biodiversity Net Gain conditions should include developer funds for monitoring and remedial action if required
BG/GI: Green infrastructure Support for recognition of pollinator corridors. Strategic Green Infrastructure should include protection and enhancement of chalk aquifer spring line.
BG/TC: Improving Tree canopy cover and the tree population Support
BG/RC: River corridors Support
BG/PO: Protecting open spaces Support
BG/EO: Providing and enhancing open spaces Support

Wellbeing and inclusion
Policy Your comments
Wellbeing and inclusion - general comments
WS/HD: Creating healthy new developments
WS/CF: Community, sports, and leisure facilities Support
WS/MU: Meanwhile uses during long term redevelopments
WS/IO: Creating inclusive employment and business opportunities through new developments
WS/HS: Pollution, health and safety

Great places policies
Policy Your comments
Great places – general comments
GP/PP: People and place responsive design Support
GP/LC: Protection and enhancement of landscape character Support. Need to ensure protection of landscape setting of villages and penetration of countryside gaps as an important element of character.
GP/GB: Protection and enhancement of the Cambridge Green Belt
GP/QD: Achieving high quality development Support
GP/QP: Establishing high quality landscape and public realm Support
GP/HA: Conservation and enhancement of heritage assets Support
GP/CC: Adapting heritage assets to climate change
GP/PH8: Protection of Public Houses Support

Jobs policies
Policy Your comments
Jobs – general comments
J/NE: New employment development proposals
J/RE: Supporting the rural Economy Support
J/AL: Protecting the best agricultural land Support
J/PB: Protecting existing business space
J/RW: Enabling remote working Support
J/AW: Affordable workspace and creative industries
J/EP: Supporting a range of facilities in employment parks
J/RC: Retail and centres
J/VA: Visitor accommodation, attractions and facilities
J/FD: Faculty development and specialist / language schools

Homes policies
Policy Your comments
Homes – general comments
H/AH: Affordable housing
H/ES: Exception sites for affordable housing Support but all types of sites should retain local connection and permanence criteria
H/HM: Housing mix
H/HD: Housing density
H/GL: Garden land and subdivision of existing plots Support
H/SS: Residential space standards and accessible homes
H/SH: Specialist housing and homes for older people
H/CB: Self- and custom-build homes
H/BR: Build to rent homes
H/MO: Houses in multiple occupation (HMOs)
H/SA: Student accommodation
H/DC: Dwellings in the countryside Support
H/RM: Residential moorings
H/RC: Residential caravans
H/GT: Gypsy and Traveller and Travelling Show People sites
H/CH: Community led housing Support

Infrastructure policies
Policy Your comments
Infrastructure – general comments Agree there should be support for community led projects but should describe what form the support should take.
Infrastructure should be operational before occupation of new housing particularly the need to manage surface water runoff fromhard surfacesto minimise the amount of sewage being released into the waterways
I/ST: Sustainable transport and connectivity Support but improvements required rural public transport and congestion into Cambridge (see comments under Vision and Aims)
I/EV: Parking and electric vehicles Support
I/FD: Freight and delivery consolidation
I/SI: Safeguarding important infrastructure Support
I/AD: Aviation development Support
I/EI: Energy infrastructure master planning
I/ID: Infrastructure and delivery Greater Cambridge is in a severely water stressed area and is causing environmental damage. Development should be curtailed until new water supply and sewage infrastructure is operational.
I/DI: Digital infrastructure Need for enhancement of mobile phone coverage in villages with poor reception by well sited and suitably camouflaged masts.

Comment

Greater Cambridge Local Plan Preferred Options

H/GL: Garden land and subdivision of existing plots

Representation ID: 60097

Received: 12/12/2021

Respondent: Guilden Morden Parish Council

Representation Summary:

Support

Full text:

Firstly, the Form To Assist gives a comment column for Vision and Aims.
We have numerous comments to make under this heading but I have not been able to locate this on the online system.
Secondly, the online system asks "Did you raise the matter that is the subject of your representation with the LPA earlier in the process?"
Guilden Morden Parish Council have not been involved earlier in the process. I have therefore clicked "No" but the system will not allow me to proceed further.
The online system allows only 100 words for each comment and to summarise the comments to avoid exceeding 100 words. It would have been helpful if the Form To Assist had stated that.
Vision and development strategy
Section / Policy Your comments
Vision and aims 1.Guilden MordenParish Council has concerns that the increase in population resulting from the additional homes target of 44,000 will have a negative impact on an already struggling traffic, school and healthcare infrastructure.
Specifically on traffic and congestion:
Commuting into and out of Cambridge at peak times already attracts significant congestion and delay for commuters.
This not only effects commuting by car but also bus and the Park&Ride buses as these typically use the same roads as the other commuters and the bus lane network doesn’t extend to where it’s needed.
Links between the train stations and the city centre are also currently inadequate and equally effected by commuter congestion.
The guided busway is too infrequent to be a viable alternative and typically the Park& Ride parking is at capacity leaving commuters with little alternative other than to drive into the city centre.
All of the above describes the current situation which will clearly be significantly worsened by the addition of 44,000 homes by 2041.
2. Is the methodology used in arriving at the figure of 44,000 defendable?

How much development, and where – general comments Support that the proposed developments are to be in major clusters in areas with good public transport.
S/JH: New jobs and homes
S/DS: Development strategy Support to the extent that development should be very restricted in smaller rural villages with limited public transport.
S/SH: Settlement hierarchy Support. Guilden Morden is a group village and should remain in this category. It is well down the sustainability hierarchy.
S/SB: Settlement boundaries Support. Tightly drawn development boundaries are important to reduce encroachment into the countryside.

Cambridge urban area
Policy Your comments
Cambridge urban area - general comments
S/NEC: North East Cambridge
S/AMC: Areas of Major Change
S/OA: Opportunity Areas in Cambridge
S/LAC: Land allocations in Cambridge

Edge of Cambridge
Policy Your comments
Edge of Cambridge - general comments
S/CE: Cambridge East
S/NWC: North West Cambridge
S/CBC: Cambridge Biomedical Campus
S/WC: West Cambridge
S/EOC: Other existing allocations on the edge of Cambridge

New settlements
Policy Your comments
New settlements - general comments
S/CB: Cambourne
S/NS: Existing new settlements

Rural southern cluster
Policy Your comments
Rural southern cluster - general comments
S/GC: Genome Campus, Hinxton
S/BRC: Babraham Research Campus
S/RSC: Village allocations in the rural southern cluster
S/SCP: Policy areas in the rural southern cluster

Rest of the rural area
Policy Your comments
Rest of the rural area - general comments
S/RRA: Allocations in the rest of the rural area
S/RRP: Policy areas in the rest of the rural area

Climate change
Policy Your comments
Climate change - general comments Future development and trends will increase the use of electricity. Where might this be generated locally by solar and/or wind?
CC/NZ: Net zero carbon new buildings Support
CC/WE: Water efficiency in new developments Absolutely necessary
CC/DC: Designing for a changing climate
CC/FM: Flooding and integrated water management Infrastructure should be operational before housing occupation
CC/RE: Renewable energy projects and infrastructure Support for community led projects but should include access to funding
CC/CE: Reducing waste and supporting the circular economy
CC/CS: Supporting land based carbon sequestration

Biodiversity and green spaces
Policy Your comments
Biodiversity and green spaces - general comments
BG/BG: Biodiversity and geodiversity Biodiversity Net Gain conditions should include developer funds for monitoring and remedial action if required
BG/GI: Green infrastructure Support for recognition of pollinator corridors. Strategic Green Infrastructure should include protection and enhancement of chalk aquifer spring line.
BG/TC: Improving Tree canopy cover and the tree population Support
BG/RC: River corridors Support
BG/PO: Protecting open spaces Support
BG/EO: Providing and enhancing open spaces Support

Wellbeing and inclusion
Policy Your comments
Wellbeing and inclusion - general comments
WS/HD: Creating healthy new developments
WS/CF: Community, sports, and leisure facilities Support
WS/MU: Meanwhile uses during long term redevelopments
WS/IO: Creating inclusive employment and business opportunities through new developments
WS/HS: Pollution, health and safety

Great places policies
Policy Your comments
Great places – general comments
GP/PP: People and place responsive design Support
GP/LC: Protection and enhancement of landscape character Support. Need to ensure protection of landscape setting of villages and penetration of countryside gaps as an important element of character.
GP/GB: Protection and enhancement of the Cambridge Green Belt
GP/QD: Achieving high quality development Support
GP/QP: Establishing high quality landscape and public realm Support
GP/HA: Conservation and enhancement of heritage assets Support
GP/CC: Adapting heritage assets to climate change
GP/PH8: Protection of Public Houses Support

Jobs policies
Policy Your comments
Jobs – general comments
J/NE: New employment development proposals
J/RE: Supporting the rural Economy Support
J/AL: Protecting the best agricultural land Support
J/PB: Protecting existing business space
J/RW: Enabling remote working Support
J/AW: Affordable workspace and creative industries
J/EP: Supporting a range of facilities in employment parks
J/RC: Retail and centres
J/VA: Visitor accommodation, attractions and facilities
J/FD: Faculty development and specialist / language schools

Homes policies
Policy Your comments
Homes – general comments
H/AH: Affordable housing
H/ES: Exception sites for affordable housing Support but all types of sites should retain local connection and permanence criteria
H/HM: Housing mix
H/HD: Housing density
H/GL: Garden land and subdivision of existing plots Support
H/SS: Residential space standards and accessible homes
H/SH: Specialist housing and homes for older people
H/CB: Self- and custom-build homes
H/BR: Build to rent homes
H/MO: Houses in multiple occupation (HMOs)
H/SA: Student accommodation
H/DC: Dwellings in the countryside Support
H/RM: Residential moorings
H/RC: Residential caravans
H/GT: Gypsy and Traveller and Travelling Show People sites
H/CH: Community led housing Support

Infrastructure policies
Policy Your comments
Infrastructure – general comments Agree there should be support for community led projects but should describe what form the support should take.
Infrastructure should be operational before occupation of new housing particularly the need to manage surface water runoff fromhard surfacesto minimise the amount of sewage being released into the waterways
I/ST: Sustainable transport and connectivity Support but improvements required rural public transport and congestion into Cambridge (see comments under Vision and Aims)
I/EV: Parking and electric vehicles Support
I/FD: Freight and delivery consolidation
I/SI: Safeguarding important infrastructure Support
I/AD: Aviation development Support
I/EI: Energy infrastructure master planning
I/ID: Infrastructure and delivery Greater Cambridge is in a severely water stressed area and is causing environmental damage. Development should be curtailed until new water supply and sewage infrastructure is operational.
I/DI: Digital infrastructure Need for enhancement of mobile phone coverage in villages with poor reception by well sited and suitably camouflaged masts.

Comment

Greater Cambridge Local Plan Preferred Options

H/DC: Dwellings in the countryside

Representation ID: 60098

Received: 12/12/2021

Respondent: Guilden Morden Parish Council

Representation Summary:

Support

Full text:

Firstly, the Form To Assist gives a comment column for Vision and Aims.
We have numerous comments to make under this heading but I have not been able to locate this on the online system.
Secondly, the online system asks "Did you raise the matter that is the subject of your representation with the LPA earlier in the process?"
Guilden Morden Parish Council have not been involved earlier in the process. I have therefore clicked "No" but the system will not allow me to proceed further.
The online system allows only 100 words for each comment and to summarise the comments to avoid exceeding 100 words. It would have been helpful if the Form To Assist had stated that.
Vision and development strategy
Section / Policy Your comments
Vision and aims 1.Guilden MordenParish Council has concerns that the increase in population resulting from the additional homes target of 44,000 will have a negative impact on an already struggling traffic, school and healthcare infrastructure.
Specifically on traffic and congestion:
Commuting into and out of Cambridge at peak times already attracts significant congestion and delay for commuters.
This not only effects commuting by car but also bus and the Park&Ride buses as these typically use the same roads as the other commuters and the bus lane network doesn’t extend to where it’s needed.
Links between the train stations and the city centre are also currently inadequate and equally effected by commuter congestion.
The guided busway is too infrequent to be a viable alternative and typically the Park& Ride parking is at capacity leaving commuters with little alternative other than to drive into the city centre.
All of the above describes the current situation which will clearly be significantly worsened by the addition of 44,000 homes by 2041.
2. Is the methodology used in arriving at the figure of 44,000 defendable?

How much development, and where – general comments Support that the proposed developments are to be in major clusters in areas with good public transport.
S/JH: New jobs and homes
S/DS: Development strategy Support to the extent that development should be very restricted in smaller rural villages with limited public transport.
S/SH: Settlement hierarchy Support. Guilden Morden is a group village and should remain in this category. It is well down the sustainability hierarchy.
S/SB: Settlement boundaries Support. Tightly drawn development boundaries are important to reduce encroachment into the countryside.

Cambridge urban area
Policy Your comments
Cambridge urban area - general comments
S/NEC: North East Cambridge
S/AMC: Areas of Major Change
S/OA: Opportunity Areas in Cambridge
S/LAC: Land allocations in Cambridge

Edge of Cambridge
Policy Your comments
Edge of Cambridge - general comments
S/CE: Cambridge East
S/NWC: North West Cambridge
S/CBC: Cambridge Biomedical Campus
S/WC: West Cambridge
S/EOC: Other existing allocations on the edge of Cambridge

New settlements
Policy Your comments
New settlements - general comments
S/CB: Cambourne
S/NS: Existing new settlements

Rural southern cluster
Policy Your comments
Rural southern cluster - general comments
S/GC: Genome Campus, Hinxton
S/BRC: Babraham Research Campus
S/RSC: Village allocations in the rural southern cluster
S/SCP: Policy areas in the rural southern cluster

Rest of the rural area
Policy Your comments
Rest of the rural area - general comments
S/RRA: Allocations in the rest of the rural area
S/RRP: Policy areas in the rest of the rural area

Climate change
Policy Your comments
Climate change - general comments Future development and trends will increase the use of electricity. Where might this be generated locally by solar and/or wind?
CC/NZ: Net zero carbon new buildings Support
CC/WE: Water efficiency in new developments Absolutely necessary
CC/DC: Designing for a changing climate
CC/FM: Flooding and integrated water management Infrastructure should be operational before housing occupation
CC/RE: Renewable energy projects and infrastructure Support for community led projects but should include access to funding
CC/CE: Reducing waste and supporting the circular economy
CC/CS: Supporting land based carbon sequestration

Biodiversity and green spaces
Policy Your comments
Biodiversity and green spaces - general comments
BG/BG: Biodiversity and geodiversity Biodiversity Net Gain conditions should include developer funds for monitoring and remedial action if required
BG/GI: Green infrastructure Support for recognition of pollinator corridors. Strategic Green Infrastructure should include protection and enhancement of chalk aquifer spring line.
BG/TC: Improving Tree canopy cover and the tree population Support
BG/RC: River corridors Support
BG/PO: Protecting open spaces Support
BG/EO: Providing and enhancing open spaces Support

Wellbeing and inclusion
Policy Your comments
Wellbeing and inclusion - general comments
WS/HD: Creating healthy new developments
WS/CF: Community, sports, and leisure facilities Support
WS/MU: Meanwhile uses during long term redevelopments
WS/IO: Creating inclusive employment and business opportunities through new developments
WS/HS: Pollution, health and safety

Great places policies
Policy Your comments
Great places – general comments
GP/PP: People and place responsive design Support
GP/LC: Protection and enhancement of landscape character Support. Need to ensure protection of landscape setting of villages and penetration of countryside gaps as an important element of character.
GP/GB: Protection and enhancement of the Cambridge Green Belt
GP/QD: Achieving high quality development Support
GP/QP: Establishing high quality landscape and public realm Support
GP/HA: Conservation and enhancement of heritage assets Support
GP/CC: Adapting heritage assets to climate change
GP/PH8: Protection of Public Houses Support

Jobs policies
Policy Your comments
Jobs – general comments
J/NE: New employment development proposals
J/RE: Supporting the rural Economy Support
J/AL: Protecting the best agricultural land Support
J/PB: Protecting existing business space
J/RW: Enabling remote working Support
J/AW: Affordable workspace and creative industries
J/EP: Supporting a range of facilities in employment parks
J/RC: Retail and centres
J/VA: Visitor accommodation, attractions and facilities
J/FD: Faculty development and specialist / language schools

Homes policies
Policy Your comments
Homes – general comments
H/AH: Affordable housing
H/ES: Exception sites for affordable housing Support but all types of sites should retain local connection and permanence criteria
H/HM: Housing mix
H/HD: Housing density
H/GL: Garden land and subdivision of existing plots Support
H/SS: Residential space standards and accessible homes
H/SH: Specialist housing and homes for older people
H/CB: Self- and custom-build homes
H/BR: Build to rent homes
H/MO: Houses in multiple occupation (HMOs)
H/SA: Student accommodation
H/DC: Dwellings in the countryside Support
H/RM: Residential moorings
H/RC: Residential caravans
H/GT: Gypsy and Traveller and Travelling Show People sites
H/CH: Community led housing Support

Infrastructure policies
Policy Your comments
Infrastructure – general comments Agree there should be support for community led projects but should describe what form the support should take.
Infrastructure should be operational before occupation of new housing particularly the need to manage surface water runoff fromhard surfacesto minimise the amount of sewage being released into the waterways
I/ST: Sustainable transport and connectivity Support but improvements required rural public transport and congestion into Cambridge (see comments under Vision and Aims)
I/EV: Parking and electric vehicles Support
I/FD: Freight and delivery consolidation
I/SI: Safeguarding important infrastructure Support
I/AD: Aviation development Support
I/EI: Energy infrastructure master planning
I/ID: Infrastructure and delivery Greater Cambridge is in a severely water stressed area and is causing environmental damage. Development should be curtailed until new water supply and sewage infrastructure is operational.
I/DI: Digital infrastructure Need for enhancement of mobile phone coverage in villages with poor reception by well sited and suitably camouflaged masts.

Comment

Greater Cambridge Local Plan Preferred Options

H/CH: Community led housing

Representation ID: 60099

Received: 12/12/2021

Respondent: Guilden Morden Parish Council

Representation Summary:

Support

Full text:

Firstly, the Form To Assist gives a comment column for Vision and Aims.
We have numerous comments to make under this heading but I have not been able to locate this on the online system.
Secondly, the online system asks "Did you raise the matter that is the subject of your representation with the LPA earlier in the process?"
Guilden Morden Parish Council have not been involved earlier in the process. I have therefore clicked "No" but the system will not allow me to proceed further.
The online system allows only 100 words for each comment and to summarise the comments to avoid exceeding 100 words. It would have been helpful if the Form To Assist had stated that.
Vision and development strategy
Section / Policy Your comments
Vision and aims 1.Guilden MordenParish Council has concerns that the increase in population resulting from the additional homes target of 44,000 will have a negative impact on an already struggling traffic, school and healthcare infrastructure.
Specifically on traffic and congestion:
Commuting into and out of Cambridge at peak times already attracts significant congestion and delay for commuters.
This not only effects commuting by car but also bus and the Park&Ride buses as these typically use the same roads as the other commuters and the bus lane network doesn’t extend to where it’s needed.
Links between the train stations and the city centre are also currently inadequate and equally effected by commuter congestion.
The guided busway is too infrequent to be a viable alternative and typically the Park& Ride parking is at capacity leaving commuters with little alternative other than to drive into the city centre.
All of the above describes the current situation which will clearly be significantly worsened by the addition of 44,000 homes by 2041.
2. Is the methodology used in arriving at the figure of 44,000 defendable?

How much development, and where – general comments Support that the proposed developments are to be in major clusters in areas with good public transport.
S/JH: New jobs and homes
S/DS: Development strategy Support to the extent that development should be very restricted in smaller rural villages with limited public transport.
S/SH: Settlement hierarchy Support. Guilden Morden is a group village and should remain in this category. It is well down the sustainability hierarchy.
S/SB: Settlement boundaries Support. Tightly drawn development boundaries are important to reduce encroachment into the countryside.

Cambridge urban area
Policy Your comments
Cambridge urban area - general comments
S/NEC: North East Cambridge
S/AMC: Areas of Major Change
S/OA: Opportunity Areas in Cambridge
S/LAC: Land allocations in Cambridge

Edge of Cambridge
Policy Your comments
Edge of Cambridge - general comments
S/CE: Cambridge East
S/NWC: North West Cambridge
S/CBC: Cambridge Biomedical Campus
S/WC: West Cambridge
S/EOC: Other existing allocations on the edge of Cambridge

New settlements
Policy Your comments
New settlements - general comments
S/CB: Cambourne
S/NS: Existing new settlements

Rural southern cluster
Policy Your comments
Rural southern cluster - general comments
S/GC: Genome Campus, Hinxton
S/BRC: Babraham Research Campus
S/RSC: Village allocations in the rural southern cluster
S/SCP: Policy areas in the rural southern cluster

Rest of the rural area
Policy Your comments
Rest of the rural area - general comments
S/RRA: Allocations in the rest of the rural area
S/RRP: Policy areas in the rest of the rural area

Climate change
Policy Your comments
Climate change - general comments Future development and trends will increase the use of electricity. Where might this be generated locally by solar and/or wind?
CC/NZ: Net zero carbon new buildings Support
CC/WE: Water efficiency in new developments Absolutely necessary
CC/DC: Designing for a changing climate
CC/FM: Flooding and integrated water management Infrastructure should be operational before housing occupation
CC/RE: Renewable energy projects and infrastructure Support for community led projects but should include access to funding
CC/CE: Reducing waste and supporting the circular economy
CC/CS: Supporting land based carbon sequestration

Biodiversity and green spaces
Policy Your comments
Biodiversity and green spaces - general comments
BG/BG: Biodiversity and geodiversity Biodiversity Net Gain conditions should include developer funds for monitoring and remedial action if required
BG/GI: Green infrastructure Support for recognition of pollinator corridors. Strategic Green Infrastructure should include protection and enhancement of chalk aquifer spring line.
BG/TC: Improving Tree canopy cover and the tree population Support
BG/RC: River corridors Support
BG/PO: Protecting open spaces Support
BG/EO: Providing and enhancing open spaces Support

Wellbeing and inclusion
Policy Your comments
Wellbeing and inclusion - general comments
WS/HD: Creating healthy new developments
WS/CF: Community, sports, and leisure facilities Support
WS/MU: Meanwhile uses during long term redevelopments
WS/IO: Creating inclusive employment and business opportunities through new developments
WS/HS: Pollution, health and safety

Great places policies
Policy Your comments
Great places – general comments
GP/PP: People and place responsive design Support
GP/LC: Protection and enhancement of landscape character Support. Need to ensure protection of landscape setting of villages and penetration of countryside gaps as an important element of character.
GP/GB: Protection and enhancement of the Cambridge Green Belt
GP/QD: Achieving high quality development Support
GP/QP: Establishing high quality landscape and public realm Support
GP/HA: Conservation and enhancement of heritage assets Support
GP/CC: Adapting heritage assets to climate change
GP/PH8: Protection of Public Houses Support

Jobs policies
Policy Your comments
Jobs – general comments
J/NE: New employment development proposals
J/RE: Supporting the rural Economy Support
J/AL: Protecting the best agricultural land Support
J/PB: Protecting existing business space
J/RW: Enabling remote working Support
J/AW: Affordable workspace and creative industries
J/EP: Supporting a range of facilities in employment parks
J/RC: Retail and centres
J/VA: Visitor accommodation, attractions and facilities
J/FD: Faculty development and specialist / language schools

Homes policies
Policy Your comments
Homes – general comments
H/AH: Affordable housing
H/ES: Exception sites for affordable housing Support but all types of sites should retain local connection and permanence criteria
H/HM: Housing mix
H/HD: Housing density
H/GL: Garden land and subdivision of existing plots Support
H/SS: Residential space standards and accessible homes
H/SH: Specialist housing and homes for older people
H/CB: Self- and custom-build homes
H/BR: Build to rent homes
H/MO: Houses in multiple occupation (HMOs)
H/SA: Student accommodation
H/DC: Dwellings in the countryside Support
H/RM: Residential moorings
H/RC: Residential caravans
H/GT: Gypsy and Traveller and Travelling Show People sites
H/CH: Community led housing Support

Infrastructure policies
Policy Your comments
Infrastructure – general comments Agree there should be support for community led projects but should describe what form the support should take.
Infrastructure should be operational before occupation of new housing particularly the need to manage surface water runoff fromhard surfacesto minimise the amount of sewage being released into the waterways
I/ST: Sustainable transport and connectivity Support but improvements required rural public transport and congestion into Cambridge (see comments under Vision and Aims)
I/EV: Parking and electric vehicles Support
I/FD: Freight and delivery consolidation
I/SI: Safeguarding important infrastructure Support
I/AD: Aviation development Support
I/EI: Energy infrastructure master planning
I/ID: Infrastructure and delivery Greater Cambridge is in a severely water stressed area and is causing environmental damage. Development should be curtailed until new water supply and sewage infrastructure is operational.
I/DI: Digital infrastructure Need for enhancement of mobile phone coverage in villages with poor reception by well sited and suitably camouflaged masts.

Comment

Greater Cambridge Local Plan Preferred Options

Infrastructure

Representation ID: 60100

Received: 12/12/2021

Respondent: Guilden Morden Parish Council

Representation Summary:

Agree there should be support for community led projects but should describe what form the support should take.
Infrastructure should be operational before occupation of new housing particularly the need to manage surface water runoff fromhard surfacesto minimise the amount of sewage being released into the waterways

Full text:

Firstly, the Form To Assist gives a comment column for Vision and Aims.
We have numerous comments to make under this heading but I have not been able to locate this on the online system.
Secondly, the online system asks "Did you raise the matter that is the subject of your representation with the LPA earlier in the process?"
Guilden Morden Parish Council have not been involved earlier in the process. I have therefore clicked "No" but the system will not allow me to proceed further.
The online system allows only 100 words for each comment and to summarise the comments to avoid exceeding 100 words. It would have been helpful if the Form To Assist had stated that.
Vision and development strategy
Section / Policy Your comments
Vision and aims 1.Guilden MordenParish Council has concerns that the increase in population resulting from the additional homes target of 44,000 will have a negative impact on an already struggling traffic, school and healthcare infrastructure.
Specifically on traffic and congestion:
Commuting into and out of Cambridge at peak times already attracts significant congestion and delay for commuters.
This not only effects commuting by car but also bus and the Park&Ride buses as these typically use the same roads as the other commuters and the bus lane network doesn’t extend to where it’s needed.
Links between the train stations and the city centre are also currently inadequate and equally effected by commuter congestion.
The guided busway is too infrequent to be a viable alternative and typically the Park& Ride parking is at capacity leaving commuters with little alternative other than to drive into the city centre.
All of the above describes the current situation which will clearly be significantly worsened by the addition of 44,000 homes by 2041.
2. Is the methodology used in arriving at the figure of 44,000 defendable?

How much development, and where – general comments Support that the proposed developments are to be in major clusters in areas with good public transport.
S/JH: New jobs and homes
S/DS: Development strategy Support to the extent that development should be very restricted in smaller rural villages with limited public transport.
S/SH: Settlement hierarchy Support. Guilden Morden is a group village and should remain in this category. It is well down the sustainability hierarchy.
S/SB: Settlement boundaries Support. Tightly drawn development boundaries are important to reduce encroachment into the countryside.

Cambridge urban area
Policy Your comments
Cambridge urban area - general comments
S/NEC: North East Cambridge
S/AMC: Areas of Major Change
S/OA: Opportunity Areas in Cambridge
S/LAC: Land allocations in Cambridge

Edge of Cambridge
Policy Your comments
Edge of Cambridge - general comments
S/CE: Cambridge East
S/NWC: North West Cambridge
S/CBC: Cambridge Biomedical Campus
S/WC: West Cambridge
S/EOC: Other existing allocations on the edge of Cambridge

New settlements
Policy Your comments
New settlements - general comments
S/CB: Cambourne
S/NS: Existing new settlements

Rural southern cluster
Policy Your comments
Rural southern cluster - general comments
S/GC: Genome Campus, Hinxton
S/BRC: Babraham Research Campus
S/RSC: Village allocations in the rural southern cluster
S/SCP: Policy areas in the rural southern cluster

Rest of the rural area
Policy Your comments
Rest of the rural area - general comments
S/RRA: Allocations in the rest of the rural area
S/RRP: Policy areas in the rest of the rural area

Climate change
Policy Your comments
Climate change - general comments Future development and trends will increase the use of electricity. Where might this be generated locally by solar and/or wind?
CC/NZ: Net zero carbon new buildings Support
CC/WE: Water efficiency in new developments Absolutely necessary
CC/DC: Designing for a changing climate
CC/FM: Flooding and integrated water management Infrastructure should be operational before housing occupation
CC/RE: Renewable energy projects and infrastructure Support for community led projects but should include access to funding
CC/CE: Reducing waste and supporting the circular economy
CC/CS: Supporting land based carbon sequestration

Biodiversity and green spaces
Policy Your comments
Biodiversity and green spaces - general comments
BG/BG: Biodiversity and geodiversity Biodiversity Net Gain conditions should include developer funds for monitoring and remedial action if required
BG/GI: Green infrastructure Support for recognition of pollinator corridors. Strategic Green Infrastructure should include protection and enhancement of chalk aquifer spring line.
BG/TC: Improving Tree canopy cover and the tree population Support
BG/RC: River corridors Support
BG/PO: Protecting open spaces Support
BG/EO: Providing and enhancing open spaces Support

Wellbeing and inclusion
Policy Your comments
Wellbeing and inclusion - general comments
WS/HD: Creating healthy new developments
WS/CF: Community, sports, and leisure facilities Support
WS/MU: Meanwhile uses during long term redevelopments
WS/IO: Creating inclusive employment and business opportunities through new developments
WS/HS: Pollution, health and safety

Great places policies
Policy Your comments
Great places – general comments
GP/PP: People and place responsive design Support
GP/LC: Protection and enhancement of landscape character Support. Need to ensure protection of landscape setting of villages and penetration of countryside gaps as an important element of character.
GP/GB: Protection and enhancement of the Cambridge Green Belt
GP/QD: Achieving high quality development Support
GP/QP: Establishing high quality landscape and public realm Support
GP/HA: Conservation and enhancement of heritage assets Support
GP/CC: Adapting heritage assets to climate change
GP/PH8: Protection of Public Houses Support

Jobs policies
Policy Your comments
Jobs – general comments
J/NE: New employment development proposals
J/RE: Supporting the rural Economy Support
J/AL: Protecting the best agricultural land Support
J/PB: Protecting existing business space
J/RW: Enabling remote working Support
J/AW: Affordable workspace and creative industries
J/EP: Supporting a range of facilities in employment parks
J/RC: Retail and centres
J/VA: Visitor accommodation, attractions and facilities
J/FD: Faculty development and specialist / language schools

Homes policies
Policy Your comments
Homes – general comments
H/AH: Affordable housing
H/ES: Exception sites for affordable housing Support but all types of sites should retain local connection and permanence criteria
H/HM: Housing mix
H/HD: Housing density
H/GL: Garden land and subdivision of existing plots Support
H/SS: Residential space standards and accessible homes
H/SH: Specialist housing and homes for older people
H/CB: Self- and custom-build homes
H/BR: Build to rent homes
H/MO: Houses in multiple occupation (HMOs)
H/SA: Student accommodation
H/DC: Dwellings in the countryside Support
H/RM: Residential moorings
H/RC: Residential caravans
H/GT: Gypsy and Traveller and Travelling Show People sites
H/CH: Community led housing Support

Infrastructure policies
Policy Your comments
Infrastructure – general comments Agree there should be support for community led projects but should describe what form the support should take.
Infrastructure should be operational before occupation of new housing particularly the need to manage surface water runoff fromhard surfacesto minimise the amount of sewage being released into the waterways
I/ST: Sustainable transport and connectivity Support but improvements required rural public transport and congestion into Cambridge (see comments under Vision and Aims)
I/EV: Parking and electric vehicles Support
I/FD: Freight and delivery consolidation
I/SI: Safeguarding important infrastructure Support
I/AD: Aviation development Support
I/EI: Energy infrastructure master planning
I/ID: Infrastructure and delivery Greater Cambridge is in a severely water stressed area and is causing environmental damage. Development should be curtailed until new water supply and sewage infrastructure is operational.
I/DI: Digital infrastructure Need for enhancement of mobile phone coverage in villages with poor reception by well sited and suitably camouflaged masts.

Comment

Greater Cambridge Local Plan Preferred Options

I/ST: Sustainable transport and connectivity

Representation ID: 60101

Received: 12/12/2021

Respondent: Guilden Morden Parish Council

Representation Summary:

Support but improvements required rural public transport and congestion into Cambridge (see comments under Vision and Aims)

Full text:

Firstly, the Form To Assist gives a comment column for Vision and Aims.
We have numerous comments to make under this heading but I have not been able to locate this on the online system.
Secondly, the online system asks "Did you raise the matter that is the subject of your representation with the LPA earlier in the process?"
Guilden Morden Parish Council have not been involved earlier in the process. I have therefore clicked "No" but the system will not allow me to proceed further.
The online system allows only 100 words for each comment and to summarise the comments to avoid exceeding 100 words. It would have been helpful if the Form To Assist had stated that.
Vision and development strategy
Section / Policy Your comments
Vision and aims 1.Guilden MordenParish Council has concerns that the increase in population resulting from the additional homes target of 44,000 will have a negative impact on an already struggling traffic, school and healthcare infrastructure.
Specifically on traffic and congestion:
Commuting into and out of Cambridge at peak times already attracts significant congestion and delay for commuters.
This not only effects commuting by car but also bus and the Park&Ride buses as these typically use the same roads as the other commuters and the bus lane network doesn’t extend to where it’s needed.
Links between the train stations and the city centre are also currently inadequate and equally effected by commuter congestion.
The guided busway is too infrequent to be a viable alternative and typically the Park& Ride parking is at capacity leaving commuters with little alternative other than to drive into the city centre.
All of the above describes the current situation which will clearly be significantly worsened by the addition of 44,000 homes by 2041.
2. Is the methodology used in arriving at the figure of 44,000 defendable?

How much development, and where – general comments Support that the proposed developments are to be in major clusters in areas with good public transport.
S/JH: New jobs and homes
S/DS: Development strategy Support to the extent that development should be very restricted in smaller rural villages with limited public transport.
S/SH: Settlement hierarchy Support. Guilden Morden is a group village and should remain in this category. It is well down the sustainability hierarchy.
S/SB: Settlement boundaries Support. Tightly drawn development boundaries are important to reduce encroachment into the countryside.

Cambridge urban area
Policy Your comments
Cambridge urban area - general comments
S/NEC: North East Cambridge
S/AMC: Areas of Major Change
S/OA: Opportunity Areas in Cambridge
S/LAC: Land allocations in Cambridge

Edge of Cambridge
Policy Your comments
Edge of Cambridge - general comments
S/CE: Cambridge East
S/NWC: North West Cambridge
S/CBC: Cambridge Biomedical Campus
S/WC: West Cambridge
S/EOC: Other existing allocations on the edge of Cambridge

New settlements
Policy Your comments
New settlements - general comments
S/CB: Cambourne
S/NS: Existing new settlements

Rural southern cluster
Policy Your comments
Rural southern cluster - general comments
S/GC: Genome Campus, Hinxton
S/BRC: Babraham Research Campus
S/RSC: Village allocations in the rural southern cluster
S/SCP: Policy areas in the rural southern cluster

Rest of the rural area
Policy Your comments
Rest of the rural area - general comments
S/RRA: Allocations in the rest of the rural area
S/RRP: Policy areas in the rest of the rural area

Climate change
Policy Your comments
Climate change - general comments Future development and trends will increase the use of electricity. Where might this be generated locally by solar and/or wind?
CC/NZ: Net zero carbon new buildings Support
CC/WE: Water efficiency in new developments Absolutely necessary
CC/DC: Designing for a changing climate
CC/FM: Flooding and integrated water management Infrastructure should be operational before housing occupation
CC/RE: Renewable energy projects and infrastructure Support for community led projects but should include access to funding
CC/CE: Reducing waste and supporting the circular economy
CC/CS: Supporting land based carbon sequestration

Biodiversity and green spaces
Policy Your comments
Biodiversity and green spaces - general comments
BG/BG: Biodiversity and geodiversity Biodiversity Net Gain conditions should include developer funds for monitoring and remedial action if required
BG/GI: Green infrastructure Support for recognition of pollinator corridors. Strategic Green Infrastructure should include protection and enhancement of chalk aquifer spring line.
BG/TC: Improving Tree canopy cover and the tree population Support
BG/RC: River corridors Support
BG/PO: Protecting open spaces Support
BG/EO: Providing and enhancing open spaces Support

Wellbeing and inclusion
Policy Your comments
Wellbeing and inclusion - general comments
WS/HD: Creating healthy new developments
WS/CF: Community, sports, and leisure facilities Support
WS/MU: Meanwhile uses during long term redevelopments
WS/IO: Creating inclusive employment and business opportunities through new developments
WS/HS: Pollution, health and safety

Great places policies
Policy Your comments
Great places – general comments
GP/PP: People and place responsive design Support
GP/LC: Protection and enhancement of landscape character Support. Need to ensure protection of landscape setting of villages and penetration of countryside gaps as an important element of character.
GP/GB: Protection and enhancement of the Cambridge Green Belt
GP/QD: Achieving high quality development Support
GP/QP: Establishing high quality landscape and public realm Support
GP/HA: Conservation and enhancement of heritage assets Support
GP/CC: Adapting heritage assets to climate change
GP/PH8: Protection of Public Houses Support

Jobs policies
Policy Your comments
Jobs – general comments
J/NE: New employment development proposals
J/RE: Supporting the rural Economy Support
J/AL: Protecting the best agricultural land Support
J/PB: Protecting existing business space
J/RW: Enabling remote working Support
J/AW: Affordable workspace and creative industries
J/EP: Supporting a range of facilities in employment parks
J/RC: Retail and centres
J/VA: Visitor accommodation, attractions and facilities
J/FD: Faculty development and specialist / language schools

Homes policies
Policy Your comments
Homes – general comments
H/AH: Affordable housing
H/ES: Exception sites for affordable housing Support but all types of sites should retain local connection and permanence criteria
H/HM: Housing mix
H/HD: Housing density
H/GL: Garden land and subdivision of existing plots Support
H/SS: Residential space standards and accessible homes
H/SH: Specialist housing and homes for older people
H/CB: Self- and custom-build homes
H/BR: Build to rent homes
H/MO: Houses in multiple occupation (HMOs)
H/SA: Student accommodation
H/DC: Dwellings in the countryside Support
H/RM: Residential moorings
H/RC: Residential caravans
H/GT: Gypsy and Traveller and Travelling Show People sites
H/CH: Community led housing Support

Infrastructure policies
Policy Your comments
Infrastructure – general comments Agree there should be support for community led projects but should describe what form the support should take.
Infrastructure should be operational before occupation of new housing particularly the need to manage surface water runoff fromhard surfacesto minimise the amount of sewage being released into the waterways
I/ST: Sustainable transport and connectivity Support but improvements required rural public transport and congestion into Cambridge (see comments under Vision and Aims)
I/EV: Parking and electric vehicles Support
I/FD: Freight and delivery consolidation
I/SI: Safeguarding important infrastructure Support
I/AD: Aviation development Support
I/EI: Energy infrastructure master planning
I/ID: Infrastructure and delivery Greater Cambridge is in a severely water stressed area and is causing environmental damage. Development should be curtailed until new water supply and sewage infrastructure is operational.
I/DI: Digital infrastructure Need for enhancement of mobile phone coverage in villages with poor reception by well sited and suitably camouflaged masts.

Comment

Greater Cambridge Local Plan Preferred Options

I/EV: Parking and electric vehicles

Representation ID: 60102

Received: 12/12/2021

Respondent: Guilden Morden Parish Council

Representation Summary:

Support

Full text:

Firstly, the Form To Assist gives a comment column for Vision and Aims.
We have numerous comments to make under this heading but I have not been able to locate this on the online system.
Secondly, the online system asks "Did you raise the matter that is the subject of your representation with the LPA earlier in the process?"
Guilden Morden Parish Council have not been involved earlier in the process. I have therefore clicked "No" but the system will not allow me to proceed further.
The online system allows only 100 words for each comment and to summarise the comments to avoid exceeding 100 words. It would have been helpful if the Form To Assist had stated that.
Vision and development strategy
Section / Policy Your comments
Vision and aims 1.Guilden MordenParish Council has concerns that the increase in population resulting from the additional homes target of 44,000 will have a negative impact on an already struggling traffic, school and healthcare infrastructure.
Specifically on traffic and congestion:
Commuting into and out of Cambridge at peak times already attracts significant congestion and delay for commuters.
This not only effects commuting by car but also bus and the Park&Ride buses as these typically use the same roads as the other commuters and the bus lane network doesn’t extend to where it’s needed.
Links between the train stations and the city centre are also currently inadequate and equally effected by commuter congestion.
The guided busway is too infrequent to be a viable alternative and typically the Park& Ride parking is at capacity leaving commuters with little alternative other than to drive into the city centre.
All of the above describes the current situation which will clearly be significantly worsened by the addition of 44,000 homes by 2041.
2. Is the methodology used in arriving at the figure of 44,000 defendable?

How much development, and where – general comments Support that the proposed developments are to be in major clusters in areas with good public transport.
S/JH: New jobs and homes
S/DS: Development strategy Support to the extent that development should be very restricted in smaller rural villages with limited public transport.
S/SH: Settlement hierarchy Support. Guilden Morden is a group village and should remain in this category. It is well down the sustainability hierarchy.
S/SB: Settlement boundaries Support. Tightly drawn development boundaries are important to reduce encroachment into the countryside.

Cambridge urban area
Policy Your comments
Cambridge urban area - general comments
S/NEC: North East Cambridge
S/AMC: Areas of Major Change
S/OA: Opportunity Areas in Cambridge
S/LAC: Land allocations in Cambridge

Edge of Cambridge
Policy Your comments
Edge of Cambridge - general comments
S/CE: Cambridge East
S/NWC: North West Cambridge
S/CBC: Cambridge Biomedical Campus
S/WC: West Cambridge
S/EOC: Other existing allocations on the edge of Cambridge

New settlements
Policy Your comments
New settlements - general comments
S/CB: Cambourne
S/NS: Existing new settlements

Rural southern cluster
Policy Your comments
Rural southern cluster - general comments
S/GC: Genome Campus, Hinxton
S/BRC: Babraham Research Campus
S/RSC: Village allocations in the rural southern cluster
S/SCP: Policy areas in the rural southern cluster

Rest of the rural area
Policy Your comments
Rest of the rural area - general comments
S/RRA: Allocations in the rest of the rural area
S/RRP: Policy areas in the rest of the rural area

Climate change
Policy Your comments
Climate change - general comments Future development and trends will increase the use of electricity. Where might this be generated locally by solar and/or wind?
CC/NZ: Net zero carbon new buildings Support
CC/WE: Water efficiency in new developments Absolutely necessary
CC/DC: Designing for a changing climate
CC/FM: Flooding and integrated water management Infrastructure should be operational before housing occupation
CC/RE: Renewable energy projects and infrastructure Support for community led projects but should include access to funding
CC/CE: Reducing waste and supporting the circular economy
CC/CS: Supporting land based carbon sequestration

Biodiversity and green spaces
Policy Your comments
Biodiversity and green spaces - general comments
BG/BG: Biodiversity and geodiversity Biodiversity Net Gain conditions should include developer funds for monitoring and remedial action if required
BG/GI: Green infrastructure Support for recognition of pollinator corridors. Strategic Green Infrastructure should include protection and enhancement of chalk aquifer spring line.
BG/TC: Improving Tree canopy cover and the tree population Support
BG/RC: River corridors Support
BG/PO: Protecting open spaces Support
BG/EO: Providing and enhancing open spaces Support

Wellbeing and inclusion
Policy Your comments
Wellbeing and inclusion - general comments
WS/HD: Creating healthy new developments
WS/CF: Community, sports, and leisure facilities Support
WS/MU: Meanwhile uses during long term redevelopments
WS/IO: Creating inclusive employment and business opportunities through new developments
WS/HS: Pollution, health and safety

Great places policies
Policy Your comments
Great places – general comments
GP/PP: People and place responsive design Support
GP/LC: Protection and enhancement of landscape character Support. Need to ensure protection of landscape setting of villages and penetration of countryside gaps as an important element of character.
GP/GB: Protection and enhancement of the Cambridge Green Belt
GP/QD: Achieving high quality development Support
GP/QP: Establishing high quality landscape and public realm Support
GP/HA: Conservation and enhancement of heritage assets Support
GP/CC: Adapting heritage assets to climate change
GP/PH8: Protection of Public Houses Support

Jobs policies
Policy Your comments
Jobs – general comments
J/NE: New employment development proposals
J/RE: Supporting the rural Economy Support
J/AL: Protecting the best agricultural land Support
J/PB: Protecting existing business space
J/RW: Enabling remote working Support
J/AW: Affordable workspace and creative industries
J/EP: Supporting a range of facilities in employment parks
J/RC: Retail and centres
J/VA: Visitor accommodation, attractions and facilities
J/FD: Faculty development and specialist / language schools

Homes policies
Policy Your comments
Homes – general comments
H/AH: Affordable housing
H/ES: Exception sites for affordable housing Support but all types of sites should retain local connection and permanence criteria
H/HM: Housing mix
H/HD: Housing density
H/GL: Garden land and subdivision of existing plots Support
H/SS: Residential space standards and accessible homes
H/SH: Specialist housing and homes for older people
H/CB: Self- and custom-build homes
H/BR: Build to rent homes
H/MO: Houses in multiple occupation (HMOs)
H/SA: Student accommodation
H/DC: Dwellings in the countryside Support
H/RM: Residential moorings
H/RC: Residential caravans
H/GT: Gypsy and Traveller and Travelling Show People sites
H/CH: Community led housing Support

Infrastructure policies
Policy Your comments
Infrastructure – general comments Agree there should be support for community led projects but should describe what form the support should take.
Infrastructure should be operational before occupation of new housing particularly the need to manage surface water runoff fromhard surfacesto minimise the amount of sewage being released into the waterways
I/ST: Sustainable transport and connectivity Support but improvements required rural public transport and congestion into Cambridge (see comments under Vision and Aims)
I/EV: Parking and electric vehicles Support
I/FD: Freight and delivery consolidation
I/SI: Safeguarding important infrastructure Support
I/AD: Aviation development Support
I/EI: Energy infrastructure master planning
I/ID: Infrastructure and delivery Greater Cambridge is in a severely water stressed area and is causing environmental damage. Development should be curtailed until new water supply and sewage infrastructure is operational.
I/DI: Digital infrastructure Need for enhancement of mobile phone coverage in villages with poor reception by well sited and suitably camouflaged masts.

Comment

Greater Cambridge Local Plan Preferred Options

I/SI: Safeguarding important infrastructure

Representation ID: 60103

Received: 12/12/2021

Respondent: Guilden Morden Parish Council

Representation Summary:

Support

Full text:

Firstly, the Form To Assist gives a comment column for Vision and Aims.
We have numerous comments to make under this heading but I have not been able to locate this on the online system.
Secondly, the online system asks "Did you raise the matter that is the subject of your representation with the LPA earlier in the process?"
Guilden Morden Parish Council have not been involved earlier in the process. I have therefore clicked "No" but the system will not allow me to proceed further.
The online system allows only 100 words for each comment and to summarise the comments to avoid exceeding 100 words. It would have been helpful if the Form To Assist had stated that.
Vision and development strategy
Section / Policy Your comments
Vision and aims 1.Guilden MordenParish Council has concerns that the increase in population resulting from the additional homes target of 44,000 will have a negative impact on an already struggling traffic, school and healthcare infrastructure.
Specifically on traffic and congestion:
Commuting into and out of Cambridge at peak times already attracts significant congestion and delay for commuters.
This not only effects commuting by car but also bus and the Park&Ride buses as these typically use the same roads as the other commuters and the bus lane network doesn’t extend to where it’s needed.
Links between the train stations and the city centre are also currently inadequate and equally effected by commuter congestion.
The guided busway is too infrequent to be a viable alternative and typically the Park& Ride parking is at capacity leaving commuters with little alternative other than to drive into the city centre.
All of the above describes the current situation which will clearly be significantly worsened by the addition of 44,000 homes by 2041.
2. Is the methodology used in arriving at the figure of 44,000 defendable?

How much development, and where – general comments Support that the proposed developments are to be in major clusters in areas with good public transport.
S/JH: New jobs and homes
S/DS: Development strategy Support to the extent that development should be very restricted in smaller rural villages with limited public transport.
S/SH: Settlement hierarchy Support. Guilden Morden is a group village and should remain in this category. It is well down the sustainability hierarchy.
S/SB: Settlement boundaries Support. Tightly drawn development boundaries are important to reduce encroachment into the countryside.

Cambridge urban area
Policy Your comments
Cambridge urban area - general comments
S/NEC: North East Cambridge
S/AMC: Areas of Major Change
S/OA: Opportunity Areas in Cambridge
S/LAC: Land allocations in Cambridge

Edge of Cambridge
Policy Your comments
Edge of Cambridge - general comments
S/CE: Cambridge East
S/NWC: North West Cambridge
S/CBC: Cambridge Biomedical Campus
S/WC: West Cambridge
S/EOC: Other existing allocations on the edge of Cambridge

New settlements
Policy Your comments
New settlements - general comments
S/CB: Cambourne
S/NS: Existing new settlements

Rural southern cluster
Policy Your comments
Rural southern cluster - general comments
S/GC: Genome Campus, Hinxton
S/BRC: Babraham Research Campus
S/RSC: Village allocations in the rural southern cluster
S/SCP: Policy areas in the rural southern cluster

Rest of the rural area
Policy Your comments
Rest of the rural area - general comments
S/RRA: Allocations in the rest of the rural area
S/RRP: Policy areas in the rest of the rural area

Climate change
Policy Your comments
Climate change - general comments Future development and trends will increase the use of electricity. Where might this be generated locally by solar and/or wind?
CC/NZ: Net zero carbon new buildings Support
CC/WE: Water efficiency in new developments Absolutely necessary
CC/DC: Designing for a changing climate
CC/FM: Flooding and integrated water management Infrastructure should be operational before housing occupation
CC/RE: Renewable energy projects and infrastructure Support for community led projects but should include access to funding
CC/CE: Reducing waste and supporting the circular economy
CC/CS: Supporting land based carbon sequestration

Biodiversity and green spaces
Policy Your comments
Biodiversity and green spaces - general comments
BG/BG: Biodiversity and geodiversity Biodiversity Net Gain conditions should include developer funds for monitoring and remedial action if required
BG/GI: Green infrastructure Support for recognition of pollinator corridors. Strategic Green Infrastructure should include protection and enhancement of chalk aquifer spring line.
BG/TC: Improving Tree canopy cover and the tree population Support
BG/RC: River corridors Support
BG/PO: Protecting open spaces Support
BG/EO: Providing and enhancing open spaces Support

Wellbeing and inclusion
Policy Your comments
Wellbeing and inclusion - general comments
WS/HD: Creating healthy new developments
WS/CF: Community, sports, and leisure facilities Support
WS/MU: Meanwhile uses during long term redevelopments
WS/IO: Creating inclusive employment and business opportunities through new developments
WS/HS: Pollution, health and safety

Great places policies
Policy Your comments
Great places – general comments
GP/PP: People and place responsive design Support
GP/LC: Protection and enhancement of landscape character Support. Need to ensure protection of landscape setting of villages and penetration of countryside gaps as an important element of character.
GP/GB: Protection and enhancement of the Cambridge Green Belt
GP/QD: Achieving high quality development Support
GP/QP: Establishing high quality landscape and public realm Support
GP/HA: Conservation and enhancement of heritage assets Support
GP/CC: Adapting heritage assets to climate change
GP/PH8: Protection of Public Houses Support

Jobs policies
Policy Your comments
Jobs – general comments
J/NE: New employment development proposals
J/RE: Supporting the rural Economy Support
J/AL: Protecting the best agricultural land Support
J/PB: Protecting existing business space
J/RW: Enabling remote working Support
J/AW: Affordable workspace and creative industries
J/EP: Supporting a range of facilities in employment parks
J/RC: Retail and centres
J/VA: Visitor accommodation, attractions and facilities
J/FD: Faculty development and specialist / language schools

Homes policies
Policy Your comments
Homes – general comments
H/AH: Affordable housing
H/ES: Exception sites for affordable housing Support but all types of sites should retain local connection and permanence criteria
H/HM: Housing mix
H/HD: Housing density
H/GL: Garden land and subdivision of existing plots Support
H/SS: Residential space standards and accessible homes
H/SH: Specialist housing and homes for older people
H/CB: Self- and custom-build homes
H/BR: Build to rent homes
H/MO: Houses in multiple occupation (HMOs)
H/SA: Student accommodation
H/DC: Dwellings in the countryside Support
H/RM: Residential moorings
H/RC: Residential caravans
H/GT: Gypsy and Traveller and Travelling Show People sites
H/CH: Community led housing Support

Infrastructure policies
Policy Your comments
Infrastructure – general comments Agree there should be support for community led projects but should describe what form the support should take.
Infrastructure should be operational before occupation of new housing particularly the need to manage surface water runoff fromhard surfacesto minimise the amount of sewage being released into the waterways
I/ST: Sustainable transport and connectivity Support but improvements required rural public transport and congestion into Cambridge (see comments under Vision and Aims)
I/EV: Parking and electric vehicles Support
I/FD: Freight and delivery consolidation
I/SI: Safeguarding important infrastructure Support
I/AD: Aviation development Support
I/EI: Energy infrastructure master planning
I/ID: Infrastructure and delivery Greater Cambridge is in a severely water stressed area and is causing environmental damage. Development should be curtailed until new water supply and sewage infrastructure is operational.
I/DI: Digital infrastructure Need for enhancement of mobile phone coverage in villages with poor reception by well sited and suitably camouflaged masts.

Comment

Greater Cambridge Local Plan Preferred Options

I/AD: Aviation development

Representation ID: 60104

Received: 12/12/2021

Respondent: Guilden Morden Parish Council

Representation Summary:

Support

Full text:

Firstly, the Form To Assist gives a comment column for Vision and Aims.
We have numerous comments to make under this heading but I have not been able to locate this on the online system.
Secondly, the online system asks "Did you raise the matter that is the subject of your representation with the LPA earlier in the process?"
Guilden Morden Parish Council have not been involved earlier in the process. I have therefore clicked "No" but the system will not allow me to proceed further.
The online system allows only 100 words for each comment and to summarise the comments to avoid exceeding 100 words. It would have been helpful if the Form To Assist had stated that.
Vision and development strategy
Section / Policy Your comments
Vision and aims 1.Guilden MordenParish Council has concerns that the increase in population resulting from the additional homes target of 44,000 will have a negative impact on an already struggling traffic, school and healthcare infrastructure.
Specifically on traffic and congestion:
Commuting into and out of Cambridge at peak times already attracts significant congestion and delay for commuters.
This not only effects commuting by car but also bus and the Park&Ride buses as these typically use the same roads as the other commuters and the bus lane network doesn’t extend to where it’s needed.
Links between the train stations and the city centre are also currently inadequate and equally effected by commuter congestion.
The guided busway is too infrequent to be a viable alternative and typically the Park& Ride parking is at capacity leaving commuters with little alternative other than to drive into the city centre.
All of the above describes the current situation which will clearly be significantly worsened by the addition of 44,000 homes by 2041.
2. Is the methodology used in arriving at the figure of 44,000 defendable?

How much development, and where – general comments Support that the proposed developments are to be in major clusters in areas with good public transport.
S/JH: New jobs and homes
S/DS: Development strategy Support to the extent that development should be very restricted in smaller rural villages with limited public transport.
S/SH: Settlement hierarchy Support. Guilden Morden is a group village and should remain in this category. It is well down the sustainability hierarchy.
S/SB: Settlement boundaries Support. Tightly drawn development boundaries are important to reduce encroachment into the countryside.

Cambridge urban area
Policy Your comments
Cambridge urban area - general comments
S/NEC: North East Cambridge
S/AMC: Areas of Major Change
S/OA: Opportunity Areas in Cambridge
S/LAC: Land allocations in Cambridge

Edge of Cambridge
Policy Your comments
Edge of Cambridge - general comments
S/CE: Cambridge East
S/NWC: North West Cambridge
S/CBC: Cambridge Biomedical Campus
S/WC: West Cambridge
S/EOC: Other existing allocations on the edge of Cambridge

New settlements
Policy Your comments
New settlements - general comments
S/CB: Cambourne
S/NS: Existing new settlements

Rural southern cluster
Policy Your comments
Rural southern cluster - general comments
S/GC: Genome Campus, Hinxton
S/BRC: Babraham Research Campus
S/RSC: Village allocations in the rural southern cluster
S/SCP: Policy areas in the rural southern cluster

Rest of the rural area
Policy Your comments
Rest of the rural area - general comments
S/RRA: Allocations in the rest of the rural area
S/RRP: Policy areas in the rest of the rural area

Climate change
Policy Your comments
Climate change - general comments Future development and trends will increase the use of electricity. Where might this be generated locally by solar and/or wind?
CC/NZ: Net zero carbon new buildings Support
CC/WE: Water efficiency in new developments Absolutely necessary
CC/DC: Designing for a changing climate
CC/FM: Flooding and integrated water management Infrastructure should be operational before housing occupation
CC/RE: Renewable energy projects and infrastructure Support for community led projects but should include access to funding
CC/CE: Reducing waste and supporting the circular economy
CC/CS: Supporting land based carbon sequestration

Biodiversity and green spaces
Policy Your comments
Biodiversity and green spaces - general comments
BG/BG: Biodiversity and geodiversity Biodiversity Net Gain conditions should include developer funds for monitoring and remedial action if required
BG/GI: Green infrastructure Support for recognition of pollinator corridors. Strategic Green Infrastructure should include protection and enhancement of chalk aquifer spring line.
BG/TC: Improving Tree canopy cover and the tree population Support
BG/RC: River corridors Support
BG/PO: Protecting open spaces Support
BG/EO: Providing and enhancing open spaces Support

Wellbeing and inclusion
Policy Your comments
Wellbeing and inclusion - general comments
WS/HD: Creating healthy new developments
WS/CF: Community, sports, and leisure facilities Support
WS/MU: Meanwhile uses during long term redevelopments
WS/IO: Creating inclusive employment and business opportunities through new developments
WS/HS: Pollution, health and safety

Great places policies
Policy Your comments
Great places – general comments
GP/PP: People and place responsive design Support
GP/LC: Protection and enhancement of landscape character Support. Need to ensure protection of landscape setting of villages and penetration of countryside gaps as an important element of character.
GP/GB: Protection and enhancement of the Cambridge Green Belt
GP/QD: Achieving high quality development Support
GP/QP: Establishing high quality landscape and public realm Support
GP/HA: Conservation and enhancement of heritage assets Support
GP/CC: Adapting heritage assets to climate change
GP/PH8: Protection of Public Houses Support

Jobs policies
Policy Your comments
Jobs – general comments
J/NE: New employment development proposals
J/RE: Supporting the rural Economy Support
J/AL: Protecting the best agricultural land Support
J/PB: Protecting existing business space
J/RW: Enabling remote working Support
J/AW: Affordable workspace and creative industries
J/EP: Supporting a range of facilities in employment parks
J/RC: Retail and centres
J/VA: Visitor accommodation, attractions and facilities
J/FD: Faculty development and specialist / language schools

Homes policies
Policy Your comments
Homes – general comments
H/AH: Affordable housing
H/ES: Exception sites for affordable housing Support but all types of sites should retain local connection and permanence criteria
H/HM: Housing mix
H/HD: Housing density
H/GL: Garden land and subdivision of existing plots Support
H/SS: Residential space standards and accessible homes
H/SH: Specialist housing and homes for older people
H/CB: Self- and custom-build homes
H/BR: Build to rent homes
H/MO: Houses in multiple occupation (HMOs)
H/SA: Student accommodation
H/DC: Dwellings in the countryside Support
H/RM: Residential moorings
H/RC: Residential caravans
H/GT: Gypsy and Traveller and Travelling Show People sites
H/CH: Community led housing Support

Infrastructure policies
Policy Your comments
Infrastructure – general comments Agree there should be support for community led projects but should describe what form the support should take.
Infrastructure should be operational before occupation of new housing particularly the need to manage surface water runoff fromhard surfacesto minimise the amount of sewage being released into the waterways
I/ST: Sustainable transport and connectivity Support but improvements required rural public transport and congestion into Cambridge (see comments under Vision and Aims)
I/EV: Parking and electric vehicles Support
I/FD: Freight and delivery consolidation
I/SI: Safeguarding important infrastructure Support
I/AD: Aviation development Support
I/EI: Energy infrastructure master planning
I/ID: Infrastructure and delivery Greater Cambridge is in a severely water stressed area and is causing environmental damage. Development should be curtailed until new water supply and sewage infrastructure is operational.
I/DI: Digital infrastructure Need for enhancement of mobile phone coverage in villages with poor reception by well sited and suitably camouflaged masts.

Comment

Greater Cambridge Local Plan Preferred Options

I/ID: Infrastructure and delivery

Representation ID: 60105

Received: 12/12/2021

Respondent: Guilden Morden Parish Council

Representation Summary:

Greater Cambridge is in a severely water stressed area and is causing environmental damage. Development should be curtailed until new water supply and sewage infrastructure is operational.

Full text:

Firstly, the Form To Assist gives a comment column for Vision and Aims.
We have numerous comments to make under this heading but I have not been able to locate this on the online system.
Secondly, the online system asks "Did you raise the matter that is the subject of your representation with the LPA earlier in the process?"
Guilden Morden Parish Council have not been involved earlier in the process. I have therefore clicked "No" but the system will not allow me to proceed further.
The online system allows only 100 words for each comment and to summarise the comments to avoid exceeding 100 words. It would have been helpful if the Form To Assist had stated that.
Vision and development strategy
Section / Policy Your comments
Vision and aims 1.Guilden MordenParish Council has concerns that the increase in population resulting from the additional homes target of 44,000 will have a negative impact on an already struggling traffic, school and healthcare infrastructure.
Specifically on traffic and congestion:
Commuting into and out of Cambridge at peak times already attracts significant congestion and delay for commuters.
This not only effects commuting by car but also bus and the Park&Ride buses as these typically use the same roads as the other commuters and the bus lane network doesn’t extend to where it’s needed.
Links between the train stations and the city centre are also currently inadequate and equally effected by commuter congestion.
The guided busway is too infrequent to be a viable alternative and typically the Park& Ride parking is at capacity leaving commuters with little alternative other than to drive into the city centre.
All of the above describes the current situation which will clearly be significantly worsened by the addition of 44,000 homes by 2041.
2. Is the methodology used in arriving at the figure of 44,000 defendable?

How much development, and where – general comments Support that the proposed developments are to be in major clusters in areas with good public transport.
S/JH: New jobs and homes
S/DS: Development strategy Support to the extent that development should be very restricted in smaller rural villages with limited public transport.
S/SH: Settlement hierarchy Support. Guilden Morden is a group village and should remain in this category. It is well down the sustainability hierarchy.
S/SB: Settlement boundaries Support. Tightly drawn development boundaries are important to reduce encroachment into the countryside.

Cambridge urban area
Policy Your comments
Cambridge urban area - general comments
S/NEC: North East Cambridge
S/AMC: Areas of Major Change
S/OA: Opportunity Areas in Cambridge
S/LAC: Land allocations in Cambridge

Edge of Cambridge
Policy Your comments
Edge of Cambridge - general comments
S/CE: Cambridge East
S/NWC: North West Cambridge
S/CBC: Cambridge Biomedical Campus
S/WC: West Cambridge
S/EOC: Other existing allocations on the edge of Cambridge

New settlements
Policy Your comments
New settlements - general comments
S/CB: Cambourne
S/NS: Existing new settlements

Rural southern cluster
Policy Your comments
Rural southern cluster - general comments
S/GC: Genome Campus, Hinxton
S/BRC: Babraham Research Campus
S/RSC: Village allocations in the rural southern cluster
S/SCP: Policy areas in the rural southern cluster

Rest of the rural area
Policy Your comments
Rest of the rural area - general comments
S/RRA: Allocations in the rest of the rural area
S/RRP: Policy areas in the rest of the rural area

Climate change
Policy Your comments
Climate change - general comments Future development and trends will increase the use of electricity. Where might this be generated locally by solar and/or wind?
CC/NZ: Net zero carbon new buildings Support
CC/WE: Water efficiency in new developments Absolutely necessary
CC/DC: Designing for a changing climate
CC/FM: Flooding and integrated water management Infrastructure should be operational before housing occupation
CC/RE: Renewable energy projects and infrastructure Support for community led projects but should include access to funding
CC/CE: Reducing waste and supporting the circular economy
CC/CS: Supporting land based carbon sequestration

Biodiversity and green spaces
Policy Your comments
Biodiversity and green spaces - general comments
BG/BG: Biodiversity and geodiversity Biodiversity Net Gain conditions should include developer funds for monitoring and remedial action if required
BG/GI: Green infrastructure Support for recognition of pollinator corridors. Strategic Green Infrastructure should include protection and enhancement of chalk aquifer spring line.
BG/TC: Improving Tree canopy cover and the tree population Support
BG/RC: River corridors Support
BG/PO: Protecting open spaces Support
BG/EO: Providing and enhancing open spaces Support

Wellbeing and inclusion
Policy Your comments
Wellbeing and inclusion - general comments
WS/HD: Creating healthy new developments
WS/CF: Community, sports, and leisure facilities Support
WS/MU: Meanwhile uses during long term redevelopments
WS/IO: Creating inclusive employment and business opportunities through new developments
WS/HS: Pollution, health and safety

Great places policies
Policy Your comments
Great places – general comments
GP/PP: People and place responsive design Support
GP/LC: Protection and enhancement of landscape character Support. Need to ensure protection of landscape setting of villages and penetration of countryside gaps as an important element of character.
GP/GB: Protection and enhancement of the Cambridge Green Belt
GP/QD: Achieving high quality development Support
GP/QP: Establishing high quality landscape and public realm Support
GP/HA: Conservation and enhancement of heritage assets Support
GP/CC: Adapting heritage assets to climate change
GP/PH8: Protection of Public Houses Support

Jobs policies
Policy Your comments
Jobs – general comments
J/NE: New employment development proposals
J/RE: Supporting the rural Economy Support
J/AL: Protecting the best agricultural land Support
J/PB: Protecting existing business space
J/RW: Enabling remote working Support
J/AW: Affordable workspace and creative industries
J/EP: Supporting a range of facilities in employment parks
J/RC: Retail and centres
J/VA: Visitor accommodation, attractions and facilities
J/FD: Faculty development and specialist / language schools

Homes policies
Policy Your comments
Homes – general comments
H/AH: Affordable housing
H/ES: Exception sites for affordable housing Support but all types of sites should retain local connection and permanence criteria
H/HM: Housing mix
H/HD: Housing density
H/GL: Garden land and subdivision of existing plots Support
H/SS: Residential space standards and accessible homes
H/SH: Specialist housing and homes for older people
H/CB: Self- and custom-build homes
H/BR: Build to rent homes
H/MO: Houses in multiple occupation (HMOs)
H/SA: Student accommodation
H/DC: Dwellings in the countryside Support
H/RM: Residential moorings
H/RC: Residential caravans
H/GT: Gypsy and Traveller and Travelling Show People sites
H/CH: Community led housing Support

Infrastructure policies
Policy Your comments
Infrastructure – general comments Agree there should be support for community led projects but should describe what form the support should take.
Infrastructure should be operational before occupation of new housing particularly the need to manage surface water runoff fromhard surfacesto minimise the amount of sewage being released into the waterways
I/ST: Sustainable transport and connectivity Support but improvements required rural public transport and congestion into Cambridge (see comments under Vision and Aims)
I/EV: Parking and electric vehicles Support
I/FD: Freight and delivery consolidation
I/SI: Safeguarding important infrastructure Support
I/AD: Aviation development Support
I/EI: Energy infrastructure master planning
I/ID: Infrastructure and delivery Greater Cambridge is in a severely water stressed area and is causing environmental damage. Development should be curtailed until new water supply and sewage infrastructure is operational.
I/DI: Digital infrastructure Need for enhancement of mobile phone coverage in villages with poor reception by well sited and suitably camouflaged masts.

For instructions on how to use the system and make comments, please see our help guide.