Greater Cambridge Local Plan Preferred Options

Search representations

Results for Environment Agency search

New search New search

Comment

Greater Cambridge Local Plan Preferred Options

STRATEGY

Representation ID: 59718

Received: 13/12/2021

Respondent: Environment Agency

Representation Summary:

Vision and aims
The vision on page 20 is positive bringing to the forefront decreasing climate impacts, minimising carbon emissions, increasing nature, wildlife and green spaces. Reflecting on the paragraph on page 18, you outline the aim for the Local Plan is simple: to ensure sustainable development. This means planning for homes, jobs and supporting infrastructure in the right places, alongside protecting and enhancing the environment. We recommend the vision reflects this objective of ‘sustainable development.’ For example, we suggest the following revision as follows: New development must be sustainable: minimise carbon emissions and reliance on the private car; create thriving neighbourhoods with the variety of jobs and homes we need; increase nature, wildlife and green spaces; and safeguard our unique heritage and landscapes. This will align closely to the aims of the NPPF (paragraphs 7 and 8) and also demonstrate the importance of this for Greater Cambridge given the unique challenges and opportunities the area faces.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

S/JH: New jobs and homes

Representation ID: 59719

Received: 13/12/2021

Respondent: Environment Agency

Representation Summary:

We welcome the section on ‘Ensuring a deliverable plan – water supply’ on pages 41 and 42, which recognises this as a significant issue for the Local Plan. We remain genuinely concerned about whether the growth proposed (48,800 new homes inclusive of 10% buffer and 37,200 from previous plans) can be sustainable without causing further deterioration to the water environment. We understand the regional and water company water resource planning is still ongoing and the next version of the IWMS Detailed WCS will be updated as these plans come to fruition. We offer our support to work collaboratively with all the parties involved.

We support the idea of development limited to levels that can be supported by a sustainable water supply (phased delivery) until the time the strategic infrastructure is in place, though we are mindful this may lead to heavily back loaded delivery.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

S/NEC: North east Cambridge

Representation ID: 59720

Received: 13/12/2021

Respondent: Environment Agency

Representation Summary:

We note the intention of the policy is to set out the place-making vision and a robust planning framework for the comprehensive development of this site. There are both environmental risks and opportunities to developing this site sustainably. Ensuring sustainable water supplies, improving water quality and the effective remediation of land contamination will be key considerations in achieving this. The proposed policy direction anticipates the site (once developed in full, which will extend beyond the Local Plan period of 2041) will deliver 8,350 new homes. The IWMS Detailed WCS will need to provide evidence the new homes (and employment) can be sustainably supplied with water in time for the development phases.

The existing site at Fen Road, Chesterton continues to be a source of ongoing local water quality and environmental health problems due to inadequate foul drainage provision. There have been a number of reports of foul sewage from the site discharging into the River Cam, causing chronic on-going pollution. The relocation of the existing Milton sewage works and extensive redevelopment of North East Cambridge presents the opportunity to incorporate mains drainage connection into the Fen Road site.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

S/NS: Existing new settlements

Representation ID: 59721

Received: 13/12/2021

Respondent: Environment Agency

Representation Summary:

With regard to the existing allocations NS/3 and SS/5 Northstowe, we are investigating flood risk management options to reduce the risk of flooding in Oakington. This will take account of measures looking to attenuate water upstream (on the upper reaches of Oakington Brook and as part of the Northstowe development), potential channel modifications and natural flood management. We note that early phases of Northstowe are under construction. We recommend the emerging policies include this as an opportunity both in terms of delivering flood risk management measures or securing financial contributions towards this project.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

CC/WE: Water efficiency in new developments

Representation ID: 59722

Received: 13/12/2021

Respondent: Environment Agency

Representation Summary:

We support stringent water efficiency in water stressed areas. Water supply (resource) is under increasing pressure from population growth, land use change, and climate change (including hotter weather increasing evaporation, less rainfall in summer, and intense rainfall events not recharging aquifers efficiently). Without increasing our supply, reducing demand, and cutting down on wastage many areas will face significant deficits by 2050, if not sooner. We agree the evidence of the water resources situation in Greater Cambridge justifies the tighter standard of 80 litres/person/day for housing. The risk of this standard not being met is an increase in abstraction risking deterioration of associated water bodies. A positive standard is proposed for non-residential development, which we support. Water neutrality should also be explored, noting the references made to water reuse and offsetting. Currently the policy direction has a caveat of ‘unless demonstrated impracticable.’ This should be explored further in the WCS so the Council has clear guidance on the circumstances where achieving this standard would be impracticable. This will help ensure planning applications can be fairly and reasonably assessed.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

CC/DC: Designing for a changing climate

Representation ID: 59723

Received: 13/12/2021

Respondent: Environment Agency

Representation Summary:

We welcome the reference (p. 152/153) to site wide approaches to reduce climate risks, including sustainable drainage systems as part of landscape design, urban greening, increased tree canopy cover and integrating green spaces into new developments. In the context of flooding and climate change it would also be appropriate to reference flood resistance and resilience measures.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

CC/FM: Flooding and integrated water management

Representation ID: 59724

Received: 13/12/2021

Respondent: Environment Agency

Representation Summary:

CC/FM: Flooding and integrated water management
We welcome the inclusion of Policy CC/FM. We agree a policy that responds to the local water management issues is needed. As climate change will intensify the existing pressures on water availability, water quality, drainage and flood risk an integrated approach to water management will be essential. As stated this should include a robust approach to drainage and water management. The proposed policy direction is a good starting point but given the water challenges (our comments to Policy S/DS) it should strive to secure both mitigation and betterment through growth.

The local policy approach should be informed by the IWMS Water Cycle Studies, the Level 1 SFRA and other relevant strategies, and in some areas level 2 SFRA.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

BG/BG: Biodiversity and geodiversity

Representation ID: 59725

Received: 13/12/2021

Respondent: Environment Agency

Representation Summary:

We welcome and support the Council’s policy direction on this. It should be clear that BNG is in addition to the standard requirements of the mitigation hierarchy i.e. avoid harm where possible, mitigate for the effects or compensate (paragraph 180 of NPPF). We recommend that local authorities adopt a natural capital evidence approach to underpin their local plan.

Wider environmental net gains is also identified as a potential policy requirement which we support, and pending further guidance from a national level. We recommend that geodiversity is also considered.

We recommend ambitious maintenance requirements to protect and ensure longevity of net gain enhancements. .

We welcome the GI initiatives so far identified within the GC Green Infrastructure Mapping which include revitalising the chalk stream network, the River Cam corridor and enhancement of the fens. This work can also help to inform a future Local Nature Recovery Strategy.

We recommend this policy also acknowledge the significance of invasive non-native species.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

BG/GI: Green infrastructure

Representation ID: 59726

Received: 13/12/2021

Respondent: Environment Agency

Representation Summary:

We support the policy direction which will require all development to include green infrastructure, and protect/enhance water environments.

In addition, we consider ‘connectivity’ as a key component of this policy. We support the references to ‘providing links’ and connecting to the wider ecological network as part of this policy, as this will be invaluable to both green infrastructure provision and nature recovery.

Existing areas of habitat and green spaces within proposed development footprints should be protected and incorporated within landscape designs where possible.

Attachments:

Comment

Greater Cambridge Local Plan Preferred Options

BG/RC: River Corridors

Representation ID: 59727

Received: 13/12/2021

Respondent: Environment Agency

Representation Summary:

We support the inclusion of a policy to manage development that has an impact on river corridors and proposes to protect, enhance and restore natural features, supporting re-naturalisation. This is particularly important for Cambridge due to the presence of chalk streams and the role rivers and their associated floodplains play in managing flood risk and provision of habitats. The proposed policy direction includes ‘ensure that the location, scale and design of development, protects and enhances the character’ and we recommend this includes the provision of appropriate setback of developments from rivers to provide sufficient space for flood waters as well as safeguarding the integrity of the river banks and the development itself. Rivers unless they have been artificially straightened move through their landscapes through natural processes of erosion and deposition. Although river migration occurs over long time periods, developments should be set back generously to account for this alongside climate change. Natural flood management also has the potential to deliver multiple benefits. Tall buildings can have an adverse effect if located too close to a watercourse by introducing overshadowing impacts and artificial lighting which disrupts natural diurnal rhythms of wildlife such as bats.

Attachments:

For instructions on how to use the system and make comments, please see our help guide.