North East Cambridge Area Action Plan Issues and Options 2019

Search representations

Results for U+I Group PLC search

New search New search

Support

North East Cambridge Area Action Plan Issues and Options 2019

Question 60: Should open space provision within the North East Cambridge area seek to provide for the widest variety of everyday structured and unstructured recreational opportunities, including walki

Representation ID: 33662

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

We generally support this suggestion. It will be important to ensure that all spaces within the Site are fully optimised, and creative/innovative solutions should be considered to allow for flexible/multi-functional uses.

Support

North East Cambridge Area Action Plan Issues and Options 2019

Question 61: Where specific uses are required to provide of open space as part of the development, should the AAP allow for these to be met through multiple shared use (for example school playing fiel

Representation ID: 33663

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

See our response to Question 24.

Support

North East Cambridge Area Action Plan Issues and Options 2019

Question 62: Within this overall approach, in particular, which option do you prefer in relation to carbon reduction standards for residential development?

Representation ID: 33664

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

At this stage we support Option D. This is a complex area of policy setting due to the current grid decarbonisation and emerging guidance from different bodies such as the UKGBC task force, and the GLA London Plan. The context of the electricity grid decarbonisation should be considered to ensure that any targets set do not create perverse outcomes in the future over the timescales of the development and should consider the appropriateness of energy efficiency targets as well as carbon targets.

The AAP should aim to be exemplar while also drawing on the most up to date emerging evidence.

Support

North East Cambridge Area Action Plan Issues and Options 2019

Question 63: Do you support the approach to sustainable design and construction standards suggested for the AAP?

Representation ID: 33665

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

Yes, we generally support the AAP sustainable design and construction approaches set out. However with regard to water recycling we think that while water recycling can be an important part of reducing water consumption if used inappropriately can be unsustainable. Therefore we would expect a rounded view to be taken as to when it is most appropriate to apply the highest levels of water recycling (as required by the maximum BREEAM credits for water efficiency), including an understanding of maintenance and carbon efficiency.

Support

North East Cambridge Area Action Plan Issues and Options 2019

Question 64: Do you support the proposal for the AAP to be clear that review mechanisms should to be built into any planning permissions in order to reflect changes in policy regarding sustainable des

Representation ID: 33666

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

Yes we think it is important to recognise that not all future scenarios are foreseeable and that in order to avoid perverse outcomes in future it may be necessary to reappraise the policy requirements so that the most up to date and relevant standards are applied where necessary, reasonable and practicable.

It may also be advisable to follow guidance from notable charities and NGOs (e.g. UKGBC)

Support

North East Cambridge Area Action Plan Issues and Options 2019

Question 65: Do you support the plan requiring delivery of site wide approaches to issues such as energy and water, as well as the use of BREEAM Communities International Technical Standard at the mas

Representation ID: 33667

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

Subject to further Masterplanning, technical assessment and feasibility testing, we generally support the approach to site wide water proposed and support the approach to innovate energy infrastructure such as smart energy grids.
We support the view that infrastructure necessary for decentralised energy should be explored early on in consultation with relevant parties and that consideration should be given to a range of technologies and approaches to ensure the approach with the lowest carbon overall can be identified and supported.

We fully support the principles in BREEAM Communities and believe that while certification often brings a certainty of outcomes it does not always. The effective outcomes of applying BREEAM communities at this stage should be subject to further consideration.

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 66: Are there additional issues we should consider in developing the approach to deliver an exemplar development?

Representation ID: 33668

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

Consideration should be given to the embodied impacts of buildings and infrastructure installed as well as opportunities to support the circular economy. Consideration should also be given to embracing and supporting innovative smart-tech and infra-tech initiatives where feasible and viable to do so.

Support

North East Cambridge Area Action Plan Issues and Options 2019

Question 68: Should the AAP require developments in the area to integrate SMART technologies from the outset?

Representation ID: 33669

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

We generally support the suggestion that NEC should seek to integrate SMART technologies from the outset. As we have previously noted, we will seek to encourage innovative, creative and adaptable solutions throughout all elements of development on the Site. It will be important to consider preparation of a digital strategy for NEC, to seek optimum speeds for broadband/fibre, opportunities to integrate SMART technology in homes, businesses and other development around NEC.

Comment

North East Cambridge Area Action Plan Issues and Options 2019

Question 67: What approach should the AAP take to ensure delivery of a net gain in biodiversity?

Representation ID: 33670

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

The on-going uses of land e.g. Water Recycling Centre, driving range, former Park and Ride site indicates that it will have limited biodiversity value. It will be necessary to carry out site specific investigations on the potential suitability of habitat for protected species, and to consider mitigation.

NEC could be asked to consider biodiversity collectively within the site and also the wider area. In this event, the AAP will need to provide greater clarity on what process is likely to be followed, and how this will be applied to individual development schemes.

Consideration will also need to be given to increasing the amount of tree canopy cover in NEC.

Support

North East Cambridge Area Action Plan Issues and Options 2019

Question 69: Should the AAP require the use of an underground waste system where is viable?

Representation ID: 33671

Received: 25/03/2019

Respondent: U+I Group PLC

Agent: Carter Jonas

Representation Summary:

We support innovation throughout all elements of development on the Site (and indeed NEC). Rather than committing to any specific type of solution at this stage, it will be necessary to understand whether innovative systems used on other sites, such as North West Cambridge, can be applied on the Site.

For instructions on how to use the system and make comments, please see our help guide.