Object
Mill Road Depot Draft Planning and Development Brief SPD
Representation ID: 31065
Received: 21/07/2016
Respondent: Cambridge Association of Architects
Representation Summary:
Additional phasing issue - the use of the ground floors of the higher residential buildings may lend themselves with time to other uses - retail, services or public. In order to enable such future flexibility it is proposed to condition the construction of taller floor to ceiling height for these spaces (say 3-3.5m).
Full text:
Additional phasing issue - the use of the ground floors of the higher residential buildings may lend themselves with time to other uses - retail, services or public. In order to enable such future flexibility it is proposed to condition the construction of taller floor to ceiling height for these spaces (say 3-3.5m).