Support

North East Cambridge Area Action Plan Issues and Options 2019

Representation ID: 32749

Received: 22/03/2019

Respondent: Ms M Thompson

Representation Summary:

There is a very strong need for a bridge over the railway line, and this should be a road, cycle and pedestrian bridge. The land after Cambridge north station is currently only accessible by Fen Road with the need to cross a level crossing. This is not a feasible option going forwards and will significantly limit the possible number of trains going through Cambridge North station, and hence the overall development of Cambridge North East.

Full text:

There is a very strong need for a bridge over the railway line, and this should be a road, cycle and pedestrian bridge. The land after Cambridge north station is currently only accessible by Fen Road with the need to cross a level crossing. This is not a feasible option going forwards and will significantly limit the possible number of trains going through Cambridge North station, and hence the overall development of Cambridge North East.