Question 44
Representation ID: 29949
Received: 02/02/2015
Respondent: Cambridgeshire County Council
No comment
No comment
Comment
Cambridge Northern Fringe East AAP - Issues and Options
Question 45
Representation ID: 29950
Received: 02/02/2015
Respondent: Cambridgeshire County Council
No comment
No comment
Comment
Cambridge Northern Fringe East AAP - Issues and Options
Question 46
Representation ID: 29951
Received: 02/02/2015
Respondent: Cambridgeshire County Council
Recommend addition of 'waste infrastructure' for consistency with the approach set out within the RECAP Waste Management Design Guide SPD(2012) which highlights the importance of designing in waste infrastructure at the outset to support a sustainable community.
Involve all elements of waste infrastructure and storage requirements for housing and businesses, right up to the Household Recycling Centre provision.
Although Para 10.5 states that infrastructure provision will be funded through a number of sources, we are still concerned that the viability of some of the options is still unclear, which questions the delivery of some of the proposals. Further clarification needed.
We would recommend that 'waste infrastructure' is added to this section. The inclusion of waste would be consistent with the approach set out within the RECAP Waste Management Design Guide SPD (2012) which highlights the importance of designing in waste infrastructure at the outset to support a sustainable community. This would involve all elements of waste infrastructure and storage requirements for housing and businesses, right up to the Household Recycling Centre provision.
Furthermore, although Para 10.5 states that infrastructure provision will be funded through a number of sources, we are still concerned that the viability of some of the options is still unclear, which questions the delivery of some of the proposals. This needs to be clarified going forward.
Comment
Cambridge Northern Fringe East AAP - Issues and Options
Question 47a
Representation ID: 29952
Received: 02/02/2015
Respondent: Cambridgeshire County Council
Option A is realistic as it accepts that development will come forward in the different areas of the CNFE at different times. This is particularly the case if Options 3 or 4 were pursued, both of which foresee major changes to the Water Recycling Centre. These options are dependent upon a viable financial arrangement being in place, and may take a considerable time to deliver.
Option A is realistic as it accepts that development will come forward in the different areas of the CNFE at different times. This is particularly the case if Options 3 or 4 were pursued, both of which foresee major changes to the Water Recycling Centre. These options are dependent upon a viable financial arrangement being in place, and may take a considerable time to deliver.
Comment
Cambridge Northern Fringe East AAP - Issues and Options
Question 47b
Representation ID: 29953
Received: 02/02/2015
Respondent: Cambridgeshire County Council
Option B may be difficult to deliver given that a developer of the early phases may not be aware of issues and constraints in areas they do not propose to develop, and therefore it may not be appropriate to propose detailed master planning proposals for other areas of the CNFE. In particular the reduction in size and enclosure of the Water Recycling Centre in Option 3 could take different forms and be located in different ways on the site depending on the constraints placed on the redevelopment by the inlet works and other technical aspects of the development.
Option B may be difficult to deliver given that a developer of the early phases may not be aware of issues and constraints in areas they do not propose to develop, and therefore it may not be appropriate to propose detailed master planning proposals for other areas of the CNFE. In particular the reduction in size and enclosure of the Water Recycling Centre in Option 3 could take different forms and be located in different ways on the site depending on the constraints placed on the redevelopment by the inlet works and other technical aspects of the development.
Comment
Cambridge Northern Fringe East AAP - Issues and Options
Question 48
Representation ID: 29954
Received: 02/02/2015
Respondent: Cambridgeshire County Council
No comment
No comment
Comment
Cambridge Northern Fringe East AAP - Issues and Options
Question 49
Representation ID: 29955
Received: 02/02/2015
Respondent: Cambridgeshire County Council
Viability calculations will need to factor in the very real transport challenges as well as those associated with redesigned/relocated water recycling works.
Viability calculations will need to factor in the very real transport challenges as well as those associated with redesigned/relocated water recycling works.
Comment
Cambridge Northern Fringe East AAP - Issues and Options
Question 7e
Representation ID: 29963
Received: 02/02/2015
Respondent: Cambridgeshire County Council
None.
None.
Comment
Cambridge Northern Fringe East AAP - Issues and Options
Question 24b
Representation ID: 30630
Received: 27/03/2015
Respondent: Cambridgeshire County Council