Appendix 2: list of figures
Figure 1: Site location
Figure 2: Progress of the document preparation
Figure 3: Aerial view of site location
Figure 4: Cambridge East AAP Concept diagram
Figure 5: Cambridge Local Plan Modifications (March 2016)
Figure 6: Site context
Figure 7: Existing bus network
Figure 8: Existing Public Rights of Way
Figure 9: Cambridge East facilities
Figure 10: Local facilities
Figure 11: Education facilities
Figure 12: Retail facilities
Figure 13: Medical facilities
Figure 14: Public transport connections
Figure 15: Existing vegetation
Figure 16: Location of open spaces
Figure 17: Extended Phase 1 Habitat Survey results plan
Figure 18: Designations
Figure 19: Current urban grain - figure ground plan
Figure 20: Settlement study area
Figure 21: Cherry Hinton open spaces
Figure 22: Photo location plan
Figure 23: View of residential street adjacent to site
Figure 24: View along March Lane
Figure 25: View across Airport from public footpath
Figure 26: View into site from Airport Way
Figure 27: Green Belt land
Figure 28: Safeguarded land
Figure 29: Site topography
Figure 30: Existing ditch
Figure 31: Existing vegetation
Figure 32: Existing public footpath
Figure 33: Existing access
Figure 34: Existing gas main
Figure 35: Air quality management plan
Figure 36: Noise contour plan (extract from Cambridge Airport Noise Action Plan, 2014-2019)
Figure 37: Summary of site constraints
Figure 38: Concept plan
Figure 39: Overview of movement strategy
Figure 40: Connectivity
Figure 41: Primary street option A
Figure 42: Primary street option B
Figure 43: Potential wider cycle connections
Figure 44: Indicative pedestrian and cycle route
Figure 45: Central spine cycle options
Figure 46: Indicative bus route
Figure 47: Energy hierarchy
Figure 48: Sustainable drainage strategy
Figure 49: Typical SuDS sections illustrating a range of attenuation features
Figure 50: Indicative landscape framework plan
Figure 51: Indicative building heights strategy
Figure 52: Indicative plan illustrating key development principles
Table 1: Green infrastructure
Table 2: Open space provision requirements